Building construction work

Zentrale Auftragsvergabestelle des Landkreises Darmstadt-Dieburg für den Eigenbetrieb Da-Di-Werk -Gebäudemanagement- | Published January 10, 2017  -  Deadline February 13, 2017
The work will include: 

2-story post and beam facades consisting of steel profile system

Facade partial F60

322 m² in single areas

Number insert elements window: 13 pieces

Number insert elements Doors: 8

Fire Door elements with side panels and skylights, T30-RS

Number of door elements 30 pieces

Complete supply elements to the construction site and assemble

The trade union is to be processed in the context of electronic Measuring and auditing (interface * .DA11).

These are made available exclusively in digital format and for free via www.subreport-elvis.de/E96573291.

The work will include:

2-story post and beam facades consisting of steel profile system

Facade partial F60

322 m² in single areas

Number insert elements window: 13 pieces

Number insert elements Doors: 8

Fire Door elements with side panels and skylights, T30-RS

Number of door elements 30 pieces

Complete supply elements to the construction site and assemble

The trade union is to be processed in the context of electronic Measuring and auditing (interface * .DA11).

These are made available exclusively in digital format and for free via www.subreport-elvis.de/E96573291.

All other information is available at: http://www.ladadi.de/ausschreibungen

H. of the contract price to pay, if the contract value is at least 250 000 EUR Excluding VAT.

2 VOB / B): 4 years.

Penalties (§ 11 VOB / B)

The contractor has in excess of the relevant individual limits or the time limit for

Completion to pay a penalty for each day of delay:

H. said in the order letter order value excluding VAT;

Amounts offered maintenance services are disregarded.

The reference value for the calculation of the penalty for exceeding the

Single deadlines is the part of the contract price, which up to this time

contractual deliverables equivalent.

H. said in the order letter

Contract price limits (excluding VAT).

Forfeited penalties for delay because of non-compliance with the deadline for completion Starting or failure to comply with binding interim deadlines (individual deadlines as contract periods) are set off against a forfeited by default for non-compliance with the deadline for the achievement of the performance penalty.

Execution time:

05/29/2017 - 06/04/2019;

BA 05/29/2017 - 24/01/2018;

BA 15/10/2018 - 06/04/2019.

Building construction work

Zentrale Auftragsvergabestelle des Landkreises Darmstadt-Dieburg | Published December 28, 2016

Services facility / equipment specialist rooms / cafeteria kitchen.

1_Einrichtung and equipping of 9 natural science classrooms, 1 self-learning center, 3 preparation rooms.

2_Abluftanlage the scientific area (pollutant exhaust).

3_Einrichtung and features the cafeteria kitchen.

Services Outside facilities:

2400 m 3 ), Partial replacement (430 m 3 ).

500m 2 ), Trees (22 pcs), roßbaumverpflanzung (8 pcs) .New pavement schoolyard (5 200m 2 Plaster, about 1 600 meters 2 Paving).

Means the area for collection of recyclable materials, and play area with fall protection (natural material), and 4 play equipment.

Building Construction Services

Sunscreen integrated.

TGA benefits:

1800 m black tube, including insulation.

200 m folded spiral.

75 sanitary facilities.

Alarm units, building up structured data network with fiber-optic and Kufperleitungen (CAT7) and 380 data ports.

Services facility / equipment specialist rooms / canteen kitchen:

1_Einrichtung and equipping of nine natural science classrooms, a self-learning center and three preparation rooms.

2_Abluftanlage the scientific area (pollutant exhaust).

3_Einrichtung and equipment of canteen kitchen

Services Outside facilities:

3700 m 2 Paving and paving) on.

900 m 3 ).

2400 m 3 be) and partly replaced (430 m 3 ).

500 m 2 ) Created, trees replanted (22 pcs) and a large trees (8 pcs) made.

The schoolyard is uniform paved (5 200m 2 Paving and about 1 600 meters 2 Paving).

600 pcs) and seating furniture (wood with metal 10 pcs and concrete with wood edition 10 pcs) installed and a separate area for the collection of recyclables furnishings and a separate play area with fall protection (natural material), and 4 play equipment.

Scheduled start of award procedure ::

Building 01 in 2017; NW kitchen Mensa: 03/2017; NW furnishing 04/2017; NW means 04/2017; NW Medientchnik 05/2017

Expected start of works:

Building 01 in 2017; NW 08/2017; Outside: 05/2017

Completion of works:

12/2017; Outside: 06/2018.

Works for complete or part construction and civil engineering work

Entega Steag Wärme GmbH | Published January 7, 2017  -  Deadline February 20, 2017

Construction of a single-storey building to provide technical equipment and construction of bases for 2 cold storage and a chimney system.

Architectural, construction, engineering and inspection services

Hessen Mobil – Straßen und Verkehrsmanagement Darmstadt | Published January 21, 2017  -  Deadline February 23, 2017
250 m west of the axis of the A 5 in the country road L 3057 on. 

5718 609 (new)).

Against the background of the planned expansion of achtstreifigen A 5 Hessen Mobil therefore intends to replace in the years 2018-2021, the part structures, expand the AS Friedberg and implement and to renew the road surface in the area of ​​AS Friedberg fundamental way.

The services to be provided in detail engineering services are listed in detail under point II.2.4) of the contract notice.

II.1.4) of this notice mentioned projects are to provide the following services mainly:

Subject of this order are (basic) services in accordance with:

1-3 and 5-9,

6-9,

2 - 6 and

- Landscape Management Generic execution plan.

Furthermore, the following special services include providing for:

- Conception, planning and coordination of bauzeitigen traffic management (creation of arrangement enabled traffic sign plans)

- Coordination of the final mark and protection devices,

- Planning and implementing the project in accordance with § 2 BaustellV and appoint a health and safety coordinator according to § 3 BaustellV and RAB 30,

- Position of site supervision,

- Supplement processing (claims management),

- Public relations (requests and press relations)

- Planning, optimization and presentation of the overall construction process (in detail)

- Planning of temporary,

- Planning through pressings,

- General planning services (coordination services)

- Planning the cable routing and management coordination,

- Revision of Verbauplanung.

Period of performance, deadlines:

Latest prompt October 2017th

As contractual periods following processing times are set:

3 VOB / A ship 2 weeks to prompt,

1-3, 5 and 6 18 weeks upon.

For Additional Project operations, the following deadlines apply:

3) tender construction contracts 2 weeks after previous paragraph,

4) Submission Construction Contracts: 4 weeks after the previous paragraph,

Two months after previous paragraph,

6) Start of construction: about 2 weeks after previous paragraph,

36 months.

Other interim deadlines resulting from the tender documents.

Works for complete or part construction and civil engineering work

Klinikum Darmstadt GmbH | Published January 21, 2017

The component 1 and 2 of the central new building of the Darmstadt Hospital with estimated construction costs (excluding. VAT.) From about 70% of the total cost will be announced in several trade lots.

The building has 2 basements, ground floor and 4 floors and equipment surfaces on the 5th floor.

This prior information detects the tray lots Metal windows, curtain wall, scaffolding, drywall, roofing, wood interior doors incl. Frames, HVAC systems and the insulation and fire protection work (HVAC) of part 1 and 2.

Works for complete or part construction and civil engineering work

Klinikum Darmstadt GmbH | Published January 19, 2017
70% of the total cost will be announced in several trade lots. 

OG.

Frames, HVAC systems and the insulation and fire protection work (HVAC) of the component. 1 and 2

2 530 m 2 Aluminum block window elements with Paneelausfachungen and revolving door frame

460 m 2 Mullion and transom façade

400 m 2 Screen facade

At 1 900 meters 2 External sunshades of metal blade external blinds.

6 500 m² 2 Sole seal inside

1100 m 2 Ceiling sealing interior

7000 m 2 Warm roof as sloping roof with mineral fiber insulation

rooflights

Anchorage points (as a cable system)

1500 m Attica cover made of aluminum

3500 m 2 Gravel area on warm roof

1500 m 2 Extensive greening on warm roof

3300 m 2 Foamglasdämmung in ventilation structures inside.

15 000 m 2 facade scaffolding

2700 m 3 space frame

15 St stair towers

4 St construction hoist.

9 500 m 2 Aluminum curtain wall.

14 000 m 2 GK-walls F-0

With 16 000 m 2 GK-walls F-30

2000 m 2 GK-walls F-90

12 000 m 2 GK-facings

18 000 m 2 F-30 metal ceilings

15 000 m 2 Ceilings mineral fiber

5000 m 2 Plasterboard ceilings.

Frame 1-leaf.

Frame 2-flg.

Frame 1-leaf.

Frame 2-flg.

frame

frame

11 pieces open conversations

35 piece door drives.

) Quantity or scope:

Combined supply and exhaust air unit 27 pcs .;

Forming sections 40 218 m 2 ;

Air device 8 pcs .;

RLT-round pipe 8 505 m;

KVS-heat recovery system 3 pcs .;

Fire dampers (thermal / motor) 950 pcs .;

Volume flow controller constant and variable 1623 pcs .;

Air cooling units 31 pcs .;

Diffusers 2189 pcs.

Quantity or scope:

7808 m

21 839 m

42 175 m 2

7105 m

1665 pcs.

171 pcs.

871 pcs.

99 pcs.

Shopping a marking laser system for the field of data processing in the structure of the Technical University of Darmstadt

Technische Universität Darmstadt | Published January 20, 2017  -  Deadline February 23, 2017

Engineering services

Technische Universität Darmstadt | Published December 24, 2016  -  Deadline January 30, 2017

The TU Darmstadt is planning the construction of new classrooms and lecture rooms within the building S1-05 (nacelle), in the area of ​​the old power plant. Currently these facilities are, however, used with transformers, 20 kV, 6 kV, 0.4 kV switchgear, control systems and related cables. It is intended that all electrical equipment to be rebuilt in the adjacent and currently used as a physical test laboratories. After the construction and commissioning of the new equipment, the electronic components in the old power plant are then dismantled and disposed of.

Written out, the benefits of building services - electric, investment group 4 and 5, according to HOAI § 55, LPH 2-9, Honorary Zone III. Construction costs amount to about 2.5 million EUR (gross).

Rebuilding a substation, switching the previously in-service switching on the newly built switchgear and subsequent dismantling of the missing person switchgear.

Furniture

Klinikum Darmstadt GmbH | Published January 21, 2017  -  Deadline March 2, 2017

Delivery and installation of loose furniture such as chairs, benches, etc. for the construction component 3 of the Klinikum Darmstadt.

Delivery and installation of chairs of the make Kusch in black and white with and without armrests.

Delivery and installation of benches of the make Pedrali in black and red in various. Embodiments according to specifications.

Delivery and installation of various furniture such as tables, desks, filing cupboards, office swivel chairs, etc. All bidders will be invited to sampling.

Date of invitation: 13:03:17 - 03/15/2017;

Time of preparation: 03:04:17 to 12:00;

Time of sampling: 03:04:17 - 05/04/2017.

Exact place for sampling will be announced.

Architectural and related services

Technische Universität Darmstadt | Published January 18, 2017  -  Deadline February 14, 2017

The institute Chemical Technology S2 | 10 (Year 1895) was rebuilt after its destruction in the war in the 1950s again. The building is a historic cultural monument. The HNF is approximately 3400 m 2 and extends over 4 floors plus lower and attic. The future use of the building will be mainly office use. In stock there is a small lecture hall (160 m 2 ), Which must be remedied, and a learning center, which has already been renovated, however be included in the planning. In addition to a contemporary business environment, emphasis is placed on an efficient use of space and economical operation. The building envelope is to rehabilitate conservation aspects. HLS, electrical and conveyor systems are renewed. Advertised services are the planning stage building according to HOAI § 34, LPH 1-9, Honor Zone III. The construction costs, KG 300 + 400 amounted to 8.5 million EUR (gross). The owner reserves a gradual commissioning of LPH.

The building is currently used by the University of Darmstadt, h_da for the Department of Chemical Technology I. It should be returned to the TU Darmstadt and be used after conversion to the Department of Mathematics.

Architectural, engineering and planning services

Magistrat der Wissenschaftsstadt Darmstadt – Stadtplanungsamt | Published December 28, 2016  -  Deadline January 24, 2017
City Darmst., Public relations (Internet texts, flyers, etc.). 

The following tasks are provided in the respective areas:

Updating and evaluation of the urban development concept (ISEK);

- Participate in the implementation of the fields of action, projects and activities;

- Developing and initiating strategies to implement the urban development concept;

- Updating and development of the existing of measures, time, cost and financing plan;

- Project documentation and construction and implementation of a monitoring system for the entire process;

- Participation in the process evaluation.

Tenant and Owner Consulting

- Housing and for home owners and tenants advising on modernization measures and measures for climate protection and adaptation to climate change and Hofgestaltungen;

B. municipal funding) and to promote the motivation of tenants and owners to participate in the urban redevelopment.

Citizen and stakeholder participation

- Informing and involving the local partnership and the general public;

- Moderation of participatory processes;

- Support for existing and new networks, cooperation and contacts;

- Support of residents and initiatives in articulating goals;

- Support for project development;

- Establishment of a project-related public relations / image work;

- Publicity in domestic and international marketing (Internet texts, flyers, etc.).

Support the city of Darmstadt

- Co-supervision of workshops and competitions with the participation of residents and other relevant actors;

- Fiduciary management of funding;

- Participate in the reporting and the application to the Grantor.

Settlement of the entire project.

Engineering-design services for traffic installations

Zentrale Auftragsvergabestelle des Landkreises Darmstadt-Dieburg für den Magistrat der Stadt Groß-Umstadt | Published January 6, 2017  -  Deadline February 6, 2017
Road and pavement design "Kurt-Schumacher-Ring". 

Planning for the renewal of the TW-line as well as the combined sewer.

Surveying services.

Soil investigation.

Road and pavement design "Kurt-Schumacher-Ring".

Planning for the renewal of the TW-line as well as the combined sewer.

Further object of the performance is the delivery of the required for the planning and surveying services soil investigation.

With the renewal of the lines house connections will also be renewed until the plot.

For the street and sidewalks holds separate GVFG application must be created. (Special Performance by HOAI).

Fahrbahnverschwenkung, trees) have.

At the Restoration 3 different construction agencies are involved:

Darmstadt-Dieburg: street.

City Groß-Umstadt, Division 5: walkways.

City Groß-Umstadt, Stadtwerke: drinking water supply and combined sewer.

The town Groß-Umstadt is commission based on the management agreement with the Darmstadt-Dieburg district, the building measure and perform.

The prizes include planning services according to HOAI 2013 for the following areas:

- Services in accordance with HOAI §§ 6 and 46 in traffic systems (Phases 1-9);

- Services in accordance with HOAI §§ 6 and 42 in engineering structures (Phases 1-9);

- Site supervision.

The planning service is gradually contracted, LP 1-4 for the development of GVFG Discussion and vote in the political bodies, after the decommitment LP 5-9.

The bid document is in accordance with the parties to assemble, that the different components are in the action so easy to assign the cost object.

There is also a marking and signage plan in the course of processing the work phase 5 to create.

625 000 EUR and for the water pipeline with 312 500 EUR (gross).

  • 1