Call +44 800 9755 164

Public tenders for construction in Chemnitz Germany

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Building construction work

Studentenwerk Chemnitz-Zwickau, Anstalt des öffentlichen Rechts | Published October 12, 2016  -  Deadline November 8, 2016
Planning and construction of the new building a 5-group daycare, including outdoor facilities for about 100 children with a net surface area (NRF) of about 900 m  2  , The contractor will perform maintenance within the extended warranty and the regulation of the technical installations. The remuneration of the planning and construction should - take place at specified times in the form of advance payments - in deviation from the VOB / B. The maintenance and Einregelungspauschalen be remunerated separately. The project funding is available from the "bill to extend relief from states and municipalities from 2015 and the quantitative and qualitative expansion of day care for children and amending the Load Balancing Act" is available. These funds are to be used for the project by the end of 2017th

Multi-functional buildings construction work

Wismut GmbH | Published October 25, 2016  -  Deadline November 24, 2016
Pipeline construction consisting of 1300 m heating cables or pipes for heat transfer laid underground from plastic casing DN 25-100 with leakage monitoring, 160 m pipe for partially recycled mine water from PE as an overhead line DN 80 with submersible pump, plate heat exchanger, 4 pieces fittings made of PE, electrical antifreeze heater and insulation made of synthetic rubber with weatherproof cladding, 70 m water pipes for building connections of PE buried in ground DN 25-50, 270 m pipeline for distribution in the property and house connections from PE buried in ground DN 40-100, 1 piece of sewage lifting unit for contaminated waste water in provided on site building, 216 m sewage line for contaminated waste water as a double pipe system made of PE buried in ground medium pipe DN 90 with leakage monitoring.

Laboratory building construction work

Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Niederlassung Chemnitz | Published October 14, 2016  -  Deadline November 24, 2016
Important Note:

Construction work for university buildings

Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Niederlassung Chemnitz | Published October 11, 2016  -  Deadline November 15, 2016
Important Note:

Primary school construction work

Stadt Chemnitz, Zentrale Vergabestelle | Published October 7, 2016  -  Deadline November 9, 2016
Approximately 6670 m  2  Coating panels, including surface preparation.

Rehabilitation daycare (building construction)

Stadt Chemnitz | Published September 28, 2016  -  Deadline November 8, 2016

Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork

Stadt Chemnitz, Zentrale Vergabestelle | Published October 8, 2016  -  Deadline November 9, 2016
Grob amounts expansion Reitbahnstraße, TA2.

Mechanical excavators

Wismut GmbH | Published October 15, 2016  -  Deadline November 11, 2016
Renting following Construction Equipment for the Ronneburg site Wismut GmbH:

Chemnitz HBF, UST 20, new

Deutsche Bahn AG FEI - Beschaffung Infrastruktur | Published October 10, 2016  -  Deadline November 7, 2016
DB Energie GmbH operates a 10 kV medium-voltage network with currently 11 transformer stations in the area node Chemnitz. Two other transformer stations owned by the AW Chemnitz and with its own operational management are also ver-makes from this MS network. The supply of the MS-network takes place from the 110 kV network of VNB Imains GmbH by two transformers 110/10 kV with a capacity of 16 MVA in the transformer station Chemnitz main station 07 in the area of ​​Umformerwerkes Chemnitz. The energy requirement is drastically ge-sunken and thus the supply of the 110 kV grid completely uneconomical in the field node Chemnitz in recent years. The new MS-network in the area node Chemnitz to be simplified, are adapted to the new energy-energy requirement and divided between two MS networks. , As a first measure for a subnet is the construction of a new transfer station with Einspei-sung from the 10 kV grid of Imains GmbH. The entire transfer station (building body with MV / LV switchgear, transformer, UPS, FWA, etc) is hereby advertised.
  • 1