Electrical fitting work

Nibelungen-Wohnbau GmbH | Published March 31, 2017  -  Deadline May 2, 2017
cpvs
45311200, 45311100, 45317000

The buildings C3 and C4 are identical and consist of a basement, a ground, 1st, 2nd floor, 3rd floor, 4th floor and a penthouse level.

The wiring and the installations are in the apartments, stairwells and in the basement area partially concealed and partially cable support systems or plumbing tubes.

Installation methods installation are provided already during the construction phase in reinforced concrete walls.

In all apartments a complete electrical installation is installed (switches, sockets, data outlets, fixed device connections, etc.)

In the general area lighting fixtures are installed, as well as the outside of the doorway.

- In the basement, a main distribution counter is mounted.

- In the general area (stairways, corridors, the basement) are installed lighting fixtures, as well as outside of the entrance.

There are automatic circuits by means of motion in all general areas

(Basement, hallways, garbage room, lobby, bicycle and stroller space) is provided.

Diffusers are only installed in the units.

This multimedia router, the apartment with telephone, television and Internet connection is supplied.

- It will install a video intercom system, so that each apartment has its own video intercom.

- In the stairwells safety lighting is realized by means of individual luminaires.

- The electrical installation inside the apartments includes (sockets, switches, data outlets,

Hard device connections, etc.)

- In addition, an electronic sunshade system on the windows is provided.

School renovation IGS Franzsches field - Metallbauarbeiten 2 component B

Braunschweig - FB Hochbau- und Gebäudemanagement | Published February 3, 2017  -  Deadline February 24, 2017
cpvs

Metal construction - steel framed doors with fire / smoke protection requirements in corridors / staircases, skylights RWA • 12 St steel frame doors, glazed, with side panels, skylights, single and double-leaf undentsorgen, cancel, single size about 7 to 12 m² • 4 St Stahlblechtüren including frame, single-wing. , cancel and discard • 3 St steel frame doors (historical), glazed, with side panels, skylights, dismantle and Gebäudeeinlagern • 5 St steel frame doors T30 / RS, glazed, single-leaf, delivery and installation • 11 St steel frame doors T30 / RS, glazed, double-leaf, partly with side panels, single sizes 4 to 9m², 3 St doors on historical models, overhead door closers mainly with finding deliver undeinbauen • 3 St steel frame doors RS, glazed, single-leaf, overhead door closers with determination, delivery and installation • 4 St steel frame doors RS, glazed, two wings, with side panels, partially skylights, individual sizes über4 to 9 m², overhead door closers with determination, delivery and installation • 2 St automatic swing door operators for two-winged backlog door systems F0, disabled, emergency exit door according to DIN 1125, supply and install. • 1 ST steel frame window F30 , fixed glazing, provide individual size to 1 m², and installing • 3 St skylights for smoke dissipation, as a darkening flap, single size from 1 to 1.5 m, incl. RWA motor centers, the main trigger switch, wind and rain detectors, smoke detectors provide complete, montiereneinschl. Electrical installation and concealed wiring with function E30.

Plasterboard works

Helmholtz-Zentrum für Infektionsforschung GmbH | Published May 18, 2017  -  Deadline June 20, 2017
cpvs
45324000, 45421000, 45441000, 45113000

The Center for Drug Research and Functional Genomics is planned as a research platform, which is planned in the center of the campus of the Helmholtz Center (HZI) in Braunschweig. It is intended to erect a 4-storey, basemented building with approx. 4,400 sqm HNF and approx. 9,400 sqm GFA. In addition to approximately 1,000 square meters of office and seminar room space, approximately 3,200 square meters of laboratory space with S1 and S2 standard (chemielabore, microbiology, biological laboratories, biotechnological areas) are needed as well as storage rooms.

The subject of this call for proposals is drywall and carpentry work for the new building of a 4-storey laboratory and office building with ventilation center, building B2 in Braunschweig.

Among other things, drywall walls made of plasterboard and cement. Construction boards of various qualities and thicknesses, suspended ceilings, closed and perforated, wooden door systems in various qualities as well as a mobile partition wall system.

- approx. 2.520 m 2 GK-walls F0 / F30

- about 1,200 m 2 GK-walls F90

- about 150 m 2 Cement wall panels F0 / F30

- approx. 730 m 2 Cement wall panels F90

- approx. 570 m 2 Vorwand. manhole constructions

- about 300 m 2 Outgoing. Plasterboard ceilings

- approx. 750 m 2 Outgoing. GK-ceilings perforated

- approx. 21 St T30 / T90 Wooden doors with frame

- approx. 175 pcs. Wooden doors with frame

- approx. 1 st mobile wall system.

Landscaping work

Stadt Braunschweig, Fachbereich Tiefbau und Verkehr | Published March 22, 2017
Winner
Junicke GmbH
cpvs
45112700

Manufacture of roadside greenery in the construction area Lammer Busch East - LA 32nd

3000 m 2 Vegetation layer peeled off;

222 m 3 Tree pit excavation;

222 m 3 Tree pit substrate;

300 m 3 deliver and andecken topsoil;

91 St. high stems of plants;

91 St. high strains F- care;

91 St High strains E-Care;

91 St High strains watering;

3000 m 2 Sowing flower meadow;

3000 m 2 Lawn and meadow mowing F-care;

3000 m 2 Lawn and meadow mowing E-Care.

Landscaping work

Stadt Braunschweig, Fachbereich Tiefbau und Verkehr | Published December 3, 2016  -  Deadline January 13, 2017
cpvs
45112700

Manufacture of roadside greenery in the construction area Lammer Busch East - LA 32nd

3000 m 2 Vegetation layer peeled off;

222 m 3 Tree pit excavation;

222 m 3 Tree pit substrate;

300 m 3 deliver and andecken topsoil;

91 St. high stems of plants;

91 St. high strains F- care;

91 St. high strains E-Care;

91 St. high stems watering;

3000 m 2 Sowing flower meadow;

3000 m 2 Lawn and meadow mowing F-care;

3000 m 2 Lawn and meadow mowing E-Care.

Architectural and related services

Braunschweiger Verkehrs-GmbH | Published May 13, 2016  -  Deadline June 14, 2016
cpvs
71200000, 71327000, 71320000

The Braunschweiger Verkehrs-AG operates the Bus depot Lindenberg in the southern city of Braunschweig. The resulting mainly in the 1960 strength and partly also in the 1970 ies depot is strongly in need of renovation in all functional areas.

In a first phase the Halls 9 and 10 the workshop were fundamentally restored in 2011th The traffic GmbH now intends also the rehabilitation of the remaining halls and buildings. In this context, the recent 4 depots of buses to be completely dismantled and replaced by a new parking hall.

The aim is to provide comprehensive, permanent renovation of the existing facilities / properties from an economic viewpoint, to continue to perform bus operations permanently at this location can.

The preliminary and draft planning take place currently.

The preliminary construction cost about 18 million EUR net.

The reconstruction of the depot from 2017 must be in full operation and be completed by 2019. The organizations to act planner must therefore also experience in reconstruction of Busbetriebshöfen or similar projects demonstrate which included a tight timeframe and budget and the constant maintenance of daily operation.

Installation of telecommunications equipment

Städtisches Klinikum Braunschweig gGmbH | Published January 27, 2016
Winner
Telba AG
cpvs
45314000

At the site Salzdahlumer road following measures will be implemented:

Construction of a ward block for general-care, care of the Children's Hospital and the pediatric surgery, for intensive care and intermediate care;

New Children's Hospital;

Laying of Anesthesiology;

Creating an abdominal center (Med. Clinic I with endoscopy and general surgery);

Creating a heart center (. HTG Clinic and the Medical Clinic II);

Laying the Eye Clinic and Ear, Nose and Throat Clinic as a basis for the head center;

Laying the accident and plastic surgery;

Reconstruction of dialysis and the Medical Clinic V.

Creation of a new main entrance (address form);

Extension of the emergency room;

Expansion of engagement center and creating a night monitoring;

Renovation and expansion of the Central Surgical Department;

Expansion of laboratories, canteen extension;

approximately 52 000 m² of gross floor area.

Electrical installation work

Städtisches Klinikum Braunschweig gGmbH | Published January 27, 2016
Winner
Bauer Elektroanlagen GmbH
cpvs
45310000

At the site Salzdahlumer road following measures will be implemented:

Construction of a ward block for general-care, care of the Children's Hospital and the pediatric surgery, for intensive care and intermediate care;

New Children's Hospital;

Laying of Anesthesiology;

Creating an abdominal center (Med. Clinic I with endoscopy and general surgery);

Creating a heart center (. HTG Clinic and the Medical Clinic II);

Laying the Eye Clinic and Ear, Nose and Throat Clinic as a basis for the head center;

Laying the accident and plastic surgery;

Reconstruction of dialysis and the Medical Clinic V.

Creation of a new main entrance (address form);

Extension of the emergency room;

Expansion of engagement center and creating a night monitoring;

Renovation and expansion of the Central Surgical Department;

Expansion of laboratories, canteen extension;

approximately 52 000 m² of BG

Architectural and related services

Stadt Braunschweig, Fachbereich Hochbau und Gebäudemanagement, Zentrale Vergabestelle | Published June 30, 2015  -  Deadline August 12, 2015
cpvs
71200000

The city of Brunswick intends bundled with fire protection and other remedial measures carried out with the upcoming school renovation, measures for the all-day service, the inclusion, adaptation of technical rooms and amok preventions. 10,000 m² gross floor area. 1,885,000 EUR gross in the KG 300 and 961 000 EUR net not changed in the KG 400. The primary structure of the building is for reorganization measures. The work includes expected: construction: - Concrete repair of suspended ceilings in the building Part A and B; - Revising basement with exterior wall refurbishment; - Revision of the stairways; Escape and rescue routes and all measures of technical trades; - Partial renewal of the lower slope ceilings in the corridors and classrooms; - Renovation of the WC areas, renovation of wall and floor tiles, sanitary ware and partition systems in the extension; - Installation of a disabled toilet facility; - Partial replacement of flooring, wall and ceiling paintings; - Schadstoffsanierung. Planning services: - Creating inventory documents with component analysis; - Creating application documents as a reappraisal of the approval history; - Planning and renovation of the NTW-range; Containment built). The technical building services will be renovated in parallel, these benefits shall be awarded separately. A legal right to transfer these services does not exist.

Architectural, engineering and planning services

Stadt Braunschweig, Fachbereich Hochbau und Gebäudemanagement, Zentrale Vergabestelle | Published March 7, 2015
Winner
pbr Planungsbüro Rohling AG
cpvs
71240000

The city of Braunschweig intention of the upcoming school renovations, measures for the full school day, the inclusion perform the adaptation of technical rooms and amok preventions bundled with fire protection and other remedial measures. The building created as solid construction of the IGS Franzsches field was completed in 1938 and consists of four interconnected buildings, grouped around a courtyard. The building is a listed building. In addition to classrooms and science rooms contain an auditorium and a sports hall in the building complex. In recent years, part renovations were carried out in all parts of the building. The basic fabric of the school building is to be assessed as satisfactory. The main components such as roofing, facades and windows, and large parts of the technical equipment of remediation is no longer the current state of the art and in substance or exchange to. The entire building complex is to be remedied primarily in terms of the applicable fire safety standards. Are considered only the parts of buildings that belong to the property of the school. The schedule provides for an action beginning at the start of the summer holidays in 2014. With conclusion of the contract the performance phases 2-4 are assigned immediately. The retrieval of phases 5-9 is agreed optional. A stepwise assignment is provided. The Contractor shall, in the case of retrieval obliged to provide the services, if necessary. Also gradually. A legal right to transfer these services does not exist. Period: Start: March, 2014 end of July 2017th

Architectural, engineering and planning services

Stadt Braunschweig, Fachbereich Hochbau und Gebäudemanagement, Zentrale Vergabestelle | Published March 7, 2015
Winner
Arbeitsgemeinschaft IWB Ingenieurgesellschaft mbH & Schneider Architekten
cpvs
71240000

The city of Braunschweig intention of the upcoming school renovations, measures for the full school day, the inclusion perform the adaptation of technical rooms and amok preventions bundled with fire protection and other remedial measures. The school building of secondary school John F. Kennedy consists of three buildings with different creation dates. The old building incl. Toilet area (Zwischenbau) were built in the years 1911/12 and are listed buildings. The school was expanded in 1969 with an extension (new building). As a result, different types of building construction were used. The buildings and technical equipment are in a generally good condition and were set over the past years in sections repaired. The entire building complex is to be remedied primarily in terms of the applicable fire safety standards. The buildings will be comprehensively redeveloped in the next three years. The schedule provides for an action beginning at the start of the summer holidays in 2014. With conclusion of the contract the performance phases 2-4 are assigned immediately. The retrieval of phases 5-9 is agreed optional. A stepwise assignment is provided. The Contractor shall, in the case of retrieval obliged to provide the services, if necessary. Also gradually. A legal right to transfer these services does not exist. Period: Start: March, 2014 end of July 2017th

Architectural and related services

Staatliches Baumanagement Braunschweig | Published July 18, 2015
Winner
GKK Architekten BDA, Gössler Kinz Kerber Kreienbaum
cpvs
71200000

The police Gifhorn is to be extended by a new supplement. The new building is three stories, without a basement, built as office and administrative buildings. Rooms with police-specific functions are located exclusively in existing buildings and not the contract. Only the connection to the stock via a connecting bridge. For this purpose, a conversion takes place directly adjacent rooms on the 1st floor of the existing building, which is otherwise not rehabilitated. For the equipment of the new building are basically the statutory provisions and the generally customary standards to adopt. In the northern part of the property of all-Mühlenarm runs. As part of preliminary investigations, a geotechnical report was created. The investigations have shown that the soil is predominantly sandy. The foundation of the new building can therefore be carried out on flat strip foundations and raft foundation. The state-owned land is accessed via the Hindenburg street and is connected to the existing road and pipeline network. In Baufeld currently are garages. This inventory garages must be dismantled in the first step in order to meet the necessary space required on the plot can. As a replacement a new garage tract and possibly carports is planned. NF administration building: approximately 1 519 m2. NF Garage tract: approximately 128 m2. BGF administration building: about 8527 m3. BGF Garage tract: approximately 610 m3. Planning performance: Performance Phase 5-8 HOAI. Construction cost ceiling: approximately EUR 4.695 million gross without additional building costs.

Engineering services

Technische Universität Braunschweig Geschäftsbereich 3 – Gebäudemanagement | Published November 3, 2017  -  Deadline December 1, 2017
cpvs
71300000

Specialist planning Technical equipment according to Part 4 HOAI,

Service phases 3-4 commissioning, according to the model contracts and the

Process description of RBBau and RLBau Niedersachsen.

Optional phased commissioning of LPh 5-8.

The Center for Fire Research at the TU Braunschweig is a new construction of a research building

with experimental hall (about 800m 2 BGF) and laboratory / office building (ca.700m 2 BGF). In the

Experiment hall are using a large calorimeter fire tests with a

Heat release rate up to 20 MW take place.

The building or the plant requires the approval according to the Federal Immission Control Act

(BImSchG).

To secure the necessary funding, a decision document (ES Bau

according to RBBau), which includes the performance phases of HOAI 1-2. This present planning

becomes the basis of commissioning or further planning.

Architectural and related services

Technische Universität Braunschweig Geschäftsbereich 3 – Gebäudemanagement | Published November 3, 2017  -  Deadline December 1, 2017
cpvs
71200000, 71221000

Object planning according to Part 3 HOAI,

Service phases 3-4 commissioning, according to the model contracts and the

Process description of RBBau and RLBau Niedersachsen.

Optional phased commissioning of LPh 5-8.

The Center for Fire Research at the TU Braunschweig is a new construction of a research building

with experimental hall (about 800m 2 BGF) and laboratory / office building (ca.700m 2 BGF). In the

Experiment hall are using a large calorimeter fire tests with a

Heat release rate up to 20 MW take place.

The building or the plant requires the approval according to the Federal Immission Control Act

(BImSchG).

To secure the necessary funding, a decision document (ES Bau

according to RBBau), which includes the performance phases of HOAI 1-2. This present planning

becomes the basis of commissioning or further planning.

Central-heating installation work

Nibelungen-Wohnbau GmbH | Published May 26, 2017  -  Deadline May 31, 2017
cpvs
45331100

General overview Lot 1 and lot 2, building C3 and C4.

The building project is the new construction of two buildings, each with 18 property residential units, 2 of which are accessible for disabled persons and 2 are suitable for wheelchairs. The buildings have a KG, EG, 1st floor up to 4th floor and a staggered floor. The buildings are connected to the district heating network of BS Netz via an indirect district heating substation with a connection power of 140 kW each. The respective building installation consists of 2 static heating circuits, which are weather-controlled. DHW heating is carried out centrally via a charge storage system. The apartments are supplied by means of stranded cables with a straight line and a connection to a floor heating circuit distributor.

Additional bath radiators are installed at the same temperature level in the bathrooms.

A total of approx. 28,000 m heating circuit lines as well as 1,200 m main or stranded cables in the nominal sizes DN 12 to DN 65 are installed.

Facade work

Städtisches Klinikum Braunschweig gGmbH | Published November 24, 2017  -  Deadline January 11, 2018
cpvs
45443000, 45442100, 45321000

The Städtische Klinikum Braunschweig gGmbH is currently providing its clinical services to 3 locations located in the city of Braunschweig. In future, the Städtische Klinikum Braunschweig gGmbH will provide its services at only 2 locations. To achieve this goal, a major construction project will be carried out at the Salzdahlumer Straße site. Services for paintwork and thermal insulation composite system according to EnEV 2009 are required for the facades of the building components A and B.

Approximately Surface area of ​​6,380 square meters - thermal insulation composite system according to EnEV 2009 including facade paint.

Dimensions of the building about 60 mx 45.5 mx 25 m (lxwxh).

Thermal insulation panels made of rock wool WLG 035 (thickness approx. 14 - 20 cm) according to EN 13162 as well as in the base area made of expanded polystyrene foam EPS 035 according to DIN EN 13163 (thickness approx. 14 cm).

Metalworking

Stadt Braunschweig, Der Oberbürgermeister | Published February 2, 2017  -  Deadline February 24, 2017
cpvs
45262670

Metal construction - steel framed doors with fire / smoke protection requirements in corridors / staircases, skylights RWA.

Metal construction - steel framed doors with fire / smoke protection requirements in corridors / staircases, skylights RWA.

- 12 St. steel frame doors, glazed, with side panels, skylights, single and double-leaf, cancel and discard, single size about 7 to 12 m 2 ;

- 4 St. Stahlblechtüren including frame, single-leaf, cancel and discard;.

- 3 St. steel frame doors (historical), glazed, with side panels, skylights, disassemble and store in the building;

- 5 St. steel frame doors T30 / RS, glazed, single-leaf, delivery and installation;

- 11 St. steel frame doors T30 / RS, glazed, double-leaf, some with side panels, individual sizes for 4 to 9 m 2 Of which 3 St. doors on historical models, overhead door closers mainly with finding, delivered and installed;

- 3 St. steel frame doors RS, glazed, single-leaf, with determination, delivery and installation overhead door closer;

- 4 St. steel frame doors RS, glazed, double-leaf, with side panels, partially skylights, individual sizes for 4 to 9 m 2 delivery and installation, overhead door closers with determination;

deliver 2 St. automatic swing door drives for double leaf door systems inventory F0, disabled, emergency exit door according to DIN 1125, and assemble -;

- 1 St. steel frame windows F30, fixed glazing, single size up to 1 m 2 , Delivery and installation;

- 3 St. skylights for smoke dissipation, as a darkening flap, single size from 1 to 1.5 m 2 , Incl. RWA motor centers, the main trigger switch, wind and rain detectors, smoke detectors provide complete, mount incl. Electric installation and concealed wiring with function E30.

Metalworking

Stadt Braunschweig, Der Oberbürgermeister | Published October 18, 2017  -  Deadline November 24, 2017
cpvs
45262670

Type and scope of performance: Metal construction work - steel frame doors with fire protection / smoke protection requirements in corridors and staircases Component C Ground floor up to 2nd floor.

Type and scope of performance: Metal construction work - steel frame doors with fire protection / smoke protection requirements in corridors and staircases Component C Ground floor up to 2nd floor

- 14 pcs. Steel frame doors, glazed, with sides and partial skylights, two-leaf, break-off and disposal, single size over 8 to 13 m 2 ,

- 1 pc. Wooden door, incl. Frame, two-leaf, break off and discard.

- 6 pcs steel frame doors T30 / RS, glazed, double-leaf, with sides and top plate, delivered 90 ° angled twice, total dimension B / H approx. 500 + 3 100 + 500/3 200 mm.

- 3 pcs. Steel frame doors T30 / RS glazed, double-leaf, with sides, dimensions B / H approx. 2 850/2 900 mm, door closer with fixing, deliver in hallways and install.

- 6 pcs. Steel frame doors RS glazed, double-leaf, with sides, partly with top lights, dimensions B / H approx. 2 850-3 000/2 900-3 200 mm, door closer with fixing, in corridors supply and install.

- 1 pc steel frame door, glazed.

Ventilation and air-conditioning installation work

Helmholtz-Zentrum für Infektionsforschung GmbH | Published October 25, 2017
Winner
Caverion Deutschland GmbH
cpvs
45331200, 42500000, 42512300

The center for drug discovery and functional genomics is planned as a research platform. It is intended to build a 4-storey, basemented building with approx. 4 400 m² HNF and approx. 9 400 m² gross floor area. In addition to approximately 1,000 m² of office and seminar room space, approximately 3,200 m² of laboratory space are required with S1 and S2 standards (chemilabore, microbiology, biological laboratories, biotechnological areas), as well as storage rooms.

The object of the call for tenders is the air-conditioning system for the new building of a 4-storey laboratory and office building, building B2 in Braunschweig. Construction of several ventilation systems for ventilation and air-conditioning, partly in explosion-proof design.

The object of the call for tenders is the air-conditioning system for the new building of a 4-storey laboratory and office building, building B2 in Braunschweig. Construction of several ventilation systems for ventilation and air-conditioning, partly in explosion-proof design.

- about 116 000 m 3 / h supply air exhaust system;

- approx. 4 200 m 3 / h Ex-proof exhaust system;

- about 7 000 m 3 / h 24h exhaust system;

- 300 m 3 / h Vacuum exhaust tray;

- 50 m 3 / h Battery exhaust system;

- 300 m 3 / h dust extraction;

- 15,000 m 3 / h Emergency exhaust / smoke extraction system.

Engineering-design services for traffic installations

Stadt Braunschweig | Published November 20, 2015
Winner
ARGE B/M Consult & BPR Beraten/Planen/Realisieren
cpvs
71322500, 71313000, 71420000

The city of Brunswick is planning together with the Braunschweiger Verkehrs-AG to renew the Helmstedter road in section between the street Am Hauptgüterbahnhof and Leonhardstraße base adhesion. Furthermore, there are to be planned in the section of the road Helmstedter trackage of Braunschweiger Verkehrs-AG, to ride is the sole source for light rail depot on the street Am Hauptgüterbahnhof. About the Helmstedter road in almost its entire length occurs rail line traffic in 10-minute intervals. Today's traffic management during the Helmstedter road along its entire length is to be changed in favor of a traffic management Helmstedter street / Schillstraße to arrive at traffic-related better solutions and improve the road train in the area of ​​the node Helmstedter street / Leonhardstraße / Georg-Westermann-Allee / Kapellenstraße creatively to. A first very rough estimate of the investment costs for road and railway construction for the city is 6 000 000 EUR. It is planned to commissioning of basic and special services, as a result, there is a virtually complete processing of the entire project by the engineering firm to be charged.