Public tenders for construction in Braunschweig Germany

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

Staatliches Baumanagement Braunschweig | Published March 9, 2017
Winner
Draeger Medical ANSY GmbH
cpvs
45000000, 45333000

1 St compact helium recovery system,

Max. Flow: 17 m 3 / H, incl. Accessories

1 St helium gas bubble 10 m 3 volume

3 St-pressure gas cylinder bundles 300 bar with 12 bottles of 50 liters.

17 A 10066 - Julius Kühn Institute, new f Nematology -. Road Construction

Staatliches Baumanagement Braunschweig | Published March 10, 2017  -  Deadline March 23, 2017
cpvs
45233120

Facade work

Helmholtz-Zentrum für Infektionsforschung GmbH | Published February 24, 2017  -  Deadline March 30, 2017
cpvs
45443000, 45262670, 45212190, 45441000, 45113000

The Center for drug discovery and functional genomics is planned as a research platform, which is provided in a central position on the campus of the Helmholtz Centre (HZI) in Braunschweig. It is intended a 4-storey, basement building with about 4 400m² HNF and about 9 400 m² GFA to build. In addition to about 1 000 sqm office and conference room areas are about 3 200 m² of laboratory space with S1 and S2 standard (chemistry laboratories, microbiology, biological laboratories, biotechnological areas) required and associated storage rooms.

Such invitations to tender are the Facade and metal construction work for the construction of a 4-story laboratory and office building with central ventilation, building B2 in Braunschweig. There are, among other post and beam construction with windows, night ventilation wings and door systems, metal wall linings smoothly on the technical floor 4th floor, punched and a wave of EC - perform 3rd floor, insulation work, Glazing work, Sun-protection works.

- Approximately 1 900 m 2 Post and beam construction;

- Approximately 1 300 meters 2 Sun protection glazing;

- Approximately 630 m 3 Aluminum smooth metal composite wall covering;

- Approximately 890 m 2 Aluminum corrugated wall cladding;

- Approximately 370 m 2 Aluminum corrugated wall cladding perforated;

- Approximately 365 m 2 perforated aluminum smooth sheet metal paneling, outside + inside;

- Approximately 1 200 meters aluminum liner sleeve to PR-construction;

- Approximately 1 650 meters 2 Vertical sun protection systems;

- Approximately 135 m 2 suspended outside ceiling;

- RWA systems.

New drug center (HZI-B2) - VE22 facades and metal construction

Helmholtz-Zentrum für Infektionsforschung GmbH | Published February 24, 2017  -  Deadline March 30, 2017
cpvs
45443000, 45262670, 45212190, 45441000, 45113000

VE22 facades and metal construction: the contract relates for the Facade and metal construction work for the construction of a 4-story laboratory and office building with central ventilation, building B2 in Braunschweig. There are, among other post and beam construction with windows, night ventilation wings and door systems, metal wall coverings glattam service floor 4th floor, punched and a wave of EC - perform 3rd floor, insulation work, Glazing work, Sun-protection works.

Steel and metal construction, Viktoria greenhouse Humboldt Straße 1, 38106 Braunschweig

Technische Universität Braunschweig, Geschäftsbereich 3 - Gebäudemanagement | Published February 23, 2017  -  Deadline March 14, 2017
cpvs
45262670

New drug center (HZI-B2) - VE21.2 remediation joint inventory transition

Helmholtz-Zentrum für Infektionsforschung GmbH | Published February 27, 2017
cpvs
45261420

Rehabilitation of vertical and horizontal joints (bands) on existing supply passage at the construction site New drug center (HZI-B2)

Multi-dwelling buildings construction work

Nibelungen Wohnbau GmbH | Published February 17, 2017
cpvs
45211340, 45421143, 45421100

Plastic windows, sun protection.

Window sunshade.

Roof insulation work

Stadt Braunschweig, Der Oberbürgermeister | Published February 21, 2017  -  Deadline April 7, 2017
cpvs
45261410

- Remove existing upper roof structures, PS insulation approx 2300 m²;

- Removal of existing lower roof structures, bed about 2 000 m² of;

- Removal of existing gutters, etc. about 330 m;

- Removal of asbestos facade and roof panels about 35 m²;

- New roof construction, bituminous seal, EPS insulation gradient 25-40 cm approx 2000 m²;

- New roof construction, bituminous seal, EPS insulation 20 cm approx 300 m²;

- Guttering 330 m;

- Skylights 16 St .;

- New facades and roof cladding with fiber cement boards about 35 m².

Software Facility Management

Städtisches Klinikum Braunschweig gGmbH (GBA) | Published February 21, 2017  -  Deadline March 22, 2017
cpvs

Software Facility Management Modular product, with the option of extension for other business sectors and applications such as the Department of Construction, Home and Industrial Engineering incl. Licenses and services for the construction and operation of both a test system and a production system

Multi-dwelling buildings construction work

Nibelungen Wohnbau GmbH | Published February 18, 2017  -  Deadline March 17, 2017
cpvs
45211340, 45421143, 45421100

Plastic windows, sun protection.

Window sunshade.

Electrical installation work

Nibelungen-Wohnbau GmbH | Published March 4, 2017  -  Deadline March 20, 2017
cpvs
45310000

The construction project is the site power supply of a residential complex with 9 separate buildings and 220 residential units.

It is the Grundbaustromversorgung, as well as the Baubeleuchtung to prepare for building the C2, C3, C4, B1, B2 and D.

The lines must be installed on the building site, the Baustromverteiler provided and connected.

The measuring device with a transducer measurement, all required group distribution and the supply of building A1 and A2 are already installed and are not part of this contract.

Elevators and conveyors

Nibelungen-Wohnbau GmbH | Published March 3, 2017  -  Deadline March 16, 2017
cpvs
42417000

The 10 conveyor systems are installed depending on the progress of the building.

The construction project is a residential complex of 9 separate buildings. These buildings are a total of 10 conveyor systems, each without separate engine rooms, planned.

The complex is currently under construction, so the installation will also be executed completely in uninhabited state.

In each case, 6 lifts with 5 stops, 3 lifts with 7 stops and an elevator system with 9 stops are provided to divide the individual buildings which are as follows:

Building A1 - 5 stops;

Building A2 West - 5 stops;

Building A2 East - 9 stops;

Building B1 - 5 stops;

Building B2 - 5 stops;

Building C1 - 5 stops;

Building C2 - 7 stops;

Building C3 - 7 stops;

Building C4 - 7 stops;

Building D - 5 stops.

Multi-dwelling buildings construction work

Nibelungen Wohnbau GmbH | Published February 11, 2017  -  Deadline February 24, 2017
cpvs
45211340, 45113000, 45262100, 45112000, 45262300, 45262500, 45410000

Advanced structural work: from earthworks and shoring up plastering work.

Building construction work

Staatliches Baumanagement Braunschweig | Published March 8, 2017
cpvs
45210000, 45200000, 45300000, 45400000, 45453100, 45216113

Complete renovation of the Grey House (accommodation building).

It is performed by subject award lots.

For details on the contents of the tray lots see each separate announcements that will follow after the Vorinformationsfrist.

The technical lots are possibly still divided.

Significant technical lots are:

- Scaffolding work;

- Structural work;

- Natural stone work;

- Waterproofing;

- Roofing works;

- Plastering work;

- Tiling;

- Metal construction;

- Paint and repainting;

- Floor covering work;

- Trockenbauarbeiten;

- Heating systems;

- Air conditioning systems;

- Sanitation works;

- Electrical and telecommunications works;

- Außenanlagen- and Public Works.

Multi-dwelling buildings construction work

Nibelungen Wohnbau GmbH | Published January 21, 2017  -  Deadline February 10, 2017
cpvs
45211340, 45113000, 45262100, 45112000, 45262300, 45262500, 45410000

Advanced structural work: from earthworks and shoring up plastering work.

Multi-dwelling buildings construction work

Nibelungen Wohnbau GmbH | Published December 16, 2016  -  Deadline January 27, 2017
cpvs
45211340, 45321000, 45443000

Wärmedämmverbundsystem with plaster and Riemchenbekleidung.

Roof insulation work

Stadt Braunschweig, Der Oberbürgermeister | Published December 17, 2016  -  Deadline January 31, 2017
cpvs
45261410

- Remove existing upper roof structures, PS insulation about 2 300 meters 2 ;

- Removal of existing lower roof structures, bed about 2 000m 2 ;

- Removal of existing gutters, etc. about 330 m;

- Removal of asbestos facade and roof panels about 35 m 2 ;

- New roof construction, bituminous seal, EPS insulation gradient 25-40 cm about 2 000m 2 ;

- New roof construction, bituminous seal, EPS insulation 20 cm 300 m 2 ;

- Guttering 330 m;

- Skylights 16 St .;

- New facades and roof cladding with fiber cement boards about 35 m 2 ,

Multi-dwelling buildings construction work

Nibelungen Wohnbau GmbH | Published December 16, 2016  -  Deadline February 3, 2017
cpvs
45211340, 45113000, 45262100, 45112000, 45262300, 45262500, 45410000

Advanced structural work: from earthworks and shoring up plastering work.

Work on the extended shell for the building A1 and A2 (common underground parking, commercial units and Kita, cast. 174 units).

Site equipment, scaffolding work, earthworks, drainage, shoring, underground pipes, earthing system, concrete and reinforced concrete work, insulation work, bricklaying, plastering and stucco work.

Traffic Green Lammer Busch East - LA 32

Stadt Braunschweig -Tiefbau und Verkehr- | Published December 12, 2016  -  Deadline January 13, 2017
cpvs

Manufacture of roadside greenery in the construction area Lammer East - LA 32

Roof insulation work

Stadt Braunschweig, Der Oberbürgermeister | Published December 10, 2016  -  Deadline January 13, 2017
cpvs
45261410

- Remove existing upper roof structures, PS insulation about 2 300 meters 2 ;

- Removal of existing lower roof structures, bed about 2 000m 2 ;

- Removal of existing gutters, etc. about 330 m;

- Removal of asbestos facade and roof panels about 35 m 2 ;

- New roof construction, bituminous seal, EPS insulation gradient 25-40 cm about 2 000m 2 ;

- New roof construction, bituminous seal, EPS insulation 20 cm 300 m 2 ;

- Guttering 330 m;

- Skylights 16 St .;

- New facades and roof cladding with fiber cement boards about 35 m 2 ,