Public tenders for construction in Braunschweig Germany

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Architectural and related services

Staatliches Baumanagement Braunschweig | Published July 18, 2015
Winner
GKK Architekten BDA, Gössler Kinz Kerber Kreienbaum
cpvs
71200000

The police Gifhorn is to be extended by a new supplement. The new building is three stories, without a basement, built as office and administrative buildings. Rooms with police-specific functions are located exclusively in existing buildings and not the contract. Only the connection to the stock via a connecting bridge. For this purpose, a conversion takes place directly adjacent rooms on the 1st floor of the existing building, which is otherwise not rehabilitated. For the equipment of the new building are basically the statutory provisions and the generally customary standards to adopt. In the northern part of the property of all-Mühlenarm runs. As part of preliminary investigations, a geotechnical report was created. The investigations have shown that the soil is predominantly sandy. The foundation of the new building can therefore be carried out on flat strip foundations and raft foundation. The state-owned land is accessed via the Hindenburg street and is connected to the existing road and pipeline network. In Baufeld currently are garages. This inventory garages must be dismantled in the first step in order to meet the necessary space required on the plot can. As a replacement a new garage tract and possibly carports is planned. NF administration building: approximately 1 519 m2. NF Garage tract: approximately 128 m2. BGF administration building: about 8527 m3. BGF Garage tract: approximately 610 m3. Planning performance: Performance Phase 5-8 HOAI. Construction cost ceiling: approximately EUR 4.695 million gross without additional building costs.

Central-heating installation work

Nibelungen-Wohnbau GmbH | Published May 26, 2017  -  Deadline May 31, 2017
cpvs
45331100

General overview Lot 1 and lot 2, building C3 and C4.

The building project is the new construction of two buildings, each with 18 property residential units, 2 of which are accessible for disabled persons and 2 are suitable for wheelchairs. The buildings have a KG, EG, 1st floor up to 4th floor and a staggered floor. The buildings are connected to the district heating network of BS Netz via an indirect district heating substation with a connection power of 140 kW each. The respective building installation consists of 2 static heating circuits, which are weather-controlled. DHW heating is carried out centrally via a charge storage system. The apartments are supplied by means of stranded cables with a straight line and a connection to a floor heating circuit distributor.

Additional bath radiators are installed at the same temperature level in the bathrooms.

A total of approx. 28,000 m heating circuit lines as well as 1,200 m main or stranded cables in the nominal sizes DN 12 to DN 65 are installed.

Engineering services

Technische Universität Braunschweig Geschäftsbereich 3 – Gebäudemanagement | Published November 3, 2017  -  Deadline December 1, 2017
cpvs
71300000

Specialist planning Technical equipment according to Part 4 HOAI,

Service phases 3-4 commissioning, according to the model contracts and the

Process description of RBBau and RLBau Niedersachsen.

Optional phased commissioning of LPh 5-8.

The Center for Fire Research at the TU Braunschweig is a new construction of a research building

with experimental hall (about 800m 2 BGF) and laboratory / office building (ca.700m 2 BGF). In the

Experiment hall are using a large calorimeter fire tests with a

Heat release rate up to 20 MW take place.

The building or the plant requires the approval according to the Federal Immission Control Act

(BImSchG).

To secure the necessary funding, a decision document (ES Bau

according to RBBau), which includes the performance phases of HOAI 1-2. This present planning

becomes the basis of commissioning or further planning.

Architectural and related services

Technische Universität Braunschweig Geschäftsbereich 3 – Gebäudemanagement | Published November 3, 2017  -  Deadline December 1, 2017
cpvs
71200000, 71221000

Object planning according to Part 3 HOAI,

Service phases 3-4 commissioning, according to the model contracts and the

Process description of RBBau and RLBau Niedersachsen.

Optional phased commissioning of LPh 5-8.

The Center for Fire Research at the TU Braunschweig is a new construction of a research building

with experimental hall (about 800m 2 BGF) and laboratory / office building (ca.700m 2 BGF). In the

Experiment hall are using a large calorimeter fire tests with a

Heat release rate up to 20 MW take place.

The building or the plant requires the approval according to the Federal Immission Control Act

(BImSchG).

To secure the necessary funding, a decision document (ES Bau

according to RBBau), which includes the performance phases of HOAI 1-2. This present planning

becomes the basis of commissioning or further planning.

Facade work

Städtisches Klinikum Braunschweig gGmbH | Published November 24, 2017  -  Deadline January 11, 2018
cpvs
45443000, 45442100, 45321000

The Städtische Klinikum Braunschweig gGmbH is currently providing its clinical services to 3 locations located in the city of Braunschweig. In future, the Städtische Klinikum Braunschweig gGmbH will provide its services at only 2 locations. To achieve this goal, a major construction project will be carried out at the Salzdahlumer Straße site. Services for paintwork and thermal insulation composite system according to EnEV 2009 are required for the facades of the building components A and B.

Approximately Surface area of ​​6,380 square meters - thermal insulation composite system according to EnEV 2009 including facade paint.

Dimensions of the building about 60 mx 45.5 mx 25 m (lxwxh).

Thermal insulation panels made of rock wool WLG 035 (thickness approx. 14 - 20 cm) according to EN 13162 as well as in the base area made of expanded polystyrene foam EPS 035 according to DIN EN 13163 (thickness approx. 14 cm).

Plasterboard works

Helmholtz-Zentrum für Infektionsforschung GmbH | Published May 18, 2017  -  Deadline June 20, 2017
cpvs
45324000, 45421000, 45441000, 45113000

The Center for Drug Research and Functional Genomics is planned as a research platform, which is planned in the center of the campus of the Helmholtz Center (HZI) in Braunschweig. It is intended to erect a 4-storey, basemented building with approx. 4,400 sqm HNF and approx. 9,400 sqm GFA. In addition to approximately 1,000 square meters of office and seminar room space, approximately 3,200 square meters of laboratory space with S1 and S2 standard (chemielabore, microbiology, biological laboratories, biotechnological areas) are needed as well as storage rooms.

The subject of this call for proposals is drywall and carpentry work for the new building of a 4-storey laboratory and office building with ventilation center, building B2 in Braunschweig.

Among other things, drywall walls made of plasterboard and cement. Construction boards of various qualities and thicknesses, suspended ceilings, closed and perforated, wooden door systems in various qualities as well as a mobile partition wall system.

- approx. 2.520 m 2 GK-walls F0 / F30

- about 1,200 m 2 GK-walls F90

- about 150 m 2 Cement wall panels F0 / F30

- approx. 730 m 2 Cement wall panels F90

- approx. 570 m 2 Vorwand. manhole constructions

- about 300 m 2 Outgoing. Plasterboard ceilings

- approx. 750 m 2 Outgoing. GK-ceilings perforated

- approx. 21 St T30 / T90 Wooden doors with frame

- approx. 175 pcs. Wooden doors with frame

- approx. 1 st mobile wall system.

Electrical fitting work

Nibelungen-Wohnbau GmbH | Published March 31, 2017  -  Deadline May 2, 2017
cpvs
45311200, 45311100, 45317000

The buildings C3 and C4 are identical and consist of a basement, a ground, 1st, 2nd floor, 3rd floor, 4th floor and a penthouse level.

The wiring and the installations are in the apartments, stairwells and in the basement area partially concealed and partially cable support systems or plumbing tubes.

Installation methods installation are provided already during the construction phase in reinforced concrete walls.

In all apartments a complete electrical installation is installed (switches, sockets, data outlets, fixed device connections, etc.)

In the general area lighting fixtures are installed, as well as the outside of the doorway.

- In the basement, a main distribution counter is mounted.

- In the general area (stairways, corridors, the basement) are installed lighting fixtures, as well as outside of the entrance.

There are automatic circuits by means of motion in all general areas

(Basement, hallways, garbage room, lobby, bicycle and stroller space) is provided.

Diffusers are only installed in the units.

This multimedia router, the apartment with telephone, television and Internet connection is supplied.

- It will install a video intercom system, so that each apartment has its own video intercom.

- In the stairwells safety lighting is realized by means of individual luminaires.

- The electrical installation inside the apartments includes (sockets, switches, data outlets,

Hard device connections, etc.)

- In addition, an electronic sunshade system on the windows is provided.

School renovation IGS Franzsches field - Metallbauarbeiten 2 component B

Braunschweig - FB Hochbau- und Gebäudemanagement | Published February 3, 2017  -  Deadline February 24, 2017
cpvs

Metal construction - steel framed doors with fire / smoke protection requirements in corridors / staircases, skylights RWA • 12 St steel frame doors, glazed, with side panels, skylights, single and double-leaf undentsorgen, cancel, single size about 7 to 12 m² • 4 St Stahlblechtüren including frame, single-wing. , cancel and discard • 3 St steel frame doors (historical), glazed, with side panels, skylights, dismantle and Gebäudeeinlagern • 5 St steel frame doors T30 / RS, glazed, single-leaf, delivery and installation • 11 St steel frame doors T30 / RS, glazed, double-leaf, partly with side panels, single sizes 4 to 9m², 3 St doors on historical models, overhead door closers mainly with finding deliver undeinbauen • 3 St steel frame doors RS, glazed, single-leaf, overhead door closers with determination, delivery and installation • 4 St steel frame doors RS, glazed, two wings, with side panels, partially skylights, individual sizes über4 to 9 m², overhead door closers with determination, delivery and installation • 2 St automatic swing door operators for two-winged backlog door systems F0, disabled, emergency exit door according to DIN 1125, supply and install. • 1 ST steel frame window F30 , fixed glazing, provide individual size to 1 m², and installing • 3 St skylights for smoke dissipation, as a darkening flap, single size from 1 to 1.5 m, incl. RWA motor centers, the main trigger switch, wind and rain detectors, smoke detectors provide complete, montiereneinschl. Electrical installation and concealed wiring with function E30.