Public tenders for construction in Braunschweig Germany

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Refurbishment depot Lindenberg

Braunschweiger Verkehrs-GmbH | Published April 29, 2018  -  Deadline June 4, 2018
cpvs

BGF best. KG approx. 1200.00 sqm, BRI best. KG approx. 3,600.00 cbm BGF company service building 3-storey approx. 1,650.00 sqm, BRI company service building 3-storey approx. 5,800.00 cbm BGF workshop only ground floor, approx. 1,850.00 sqm BRI workshop approx. 12,950.00 cbm The new buildings have a partial basement, the existing basement will remain and will be renovated and statically upgraded. The company service building and the workshop halls lane 5-8 are being rebuilt from the basement ceiling onwards. Factory building as reinforced concrete skeleton construction with insulated sheet metal facade, static and fire protection necessary reinforced concrete and masonry walls, roof in trapezoidal sheet with insulation and sealing, workshop hall in steel construction with roof in trapezoidal sheet with insulation and sealing, facade as a post transom facade, workshop installations in the basement are prefabricated assembly pits in Füllkammerbauweise.

Refurbishment depot Lindenberg

Braunschweiger Verkehrs-GmbH | Published May 25, 2018  -  Deadline June 29, 2018
cpvs

BGF best. KG approx. 1200.00 sqm, BRI best. KG approx. 3,600.00 cbm BGF company service building 3-storey approx. 1,650.00 sqm, BRI company service building 3-storey approx. 5,800.00 cbm BGF workshop only ground floor, approx. 1,850.00 sqm BRI workshop approx. 12,950.00 cbm The new buildings have a partial basement, the existing basement will remain and will be renovated and statically upgraded. The company service building and the workshop halls lane 5-8 are being rebuilt from the basement ceiling onwards. Factory building as reinforced concrete skeleton construction with insulated sheet metal facade, static and fire protection necessary reinforced concrete and masonry walls, roof in trapezoidal sheet with insulation and sealing, workshop hall in steel construction with roof in trapezoidal sheet with insulation and sealing, facade as a post transom facade, workshop installations in the basement are prefabricated assembly pits in Füllkammerbauweise.

Renovation bus depot Lindenberg

Braunschweiger Verkehrs-GmbH | Published April 13, 2018  -  Deadline May 25, 2018
cpvs

BGF best. KG approx. 1200.00 sqm, BRI best. KG approx. 3,600.00 cbm BGF company service building 3-storey approx. 1,650.00 sqm, BRI company service building 3-storey approx. 5,800.00 cbm BGF workshop only ground floor, approx. 1,850.00 sqm BRI workshop approx. 12,950.00 cbm The new buildings have a partial basement, the existing basement will remain and will be renovated and statically upgraded. The company service building and the workshop halls lane 5-8 are being rebuilt from the basement ceiling onwards. Factory building as reinforced concrete skeleton construction with insulated sheet metal facade, static and fire protection necessary reinforced concrete and masonry walls, roof in trapezoidal sheet with insulation and sealing, workshop hall in steel construction with roof in trapezoidal sheet with insulation and sealing, facade as a post transom facade, workshop installations in the basement are prefabricated assembly pits in Füllkammerbauweise.

Engineering design services

Stadt Braunschweig | Published March 18, 2017  -  Deadline April 18, 2017
cpvs
71320000, 71322500, 71327000

The existing Okerbrücke is due to structural damage since June 2016 fully locked, not need the bridge, as well as a small bridge over the Kulkegraben, be replaced by a new short term. The object of the planner is to develop the bridge and road design, the predetermined by the client constraints as desired rule profile, the safe diversion of the fifth and the hundred year flood without additional impoundment, given terrain situation, all to be considered environmental concerns for humans, flora and fauna, compensatory measures , retention balance sheet and a pleasing aesthetic design considered.

The city of Braunschweig intended for the project "Construction of Okerbrücke Leiferde" to assign the following planning services based on HOAI at an engineering firm:

- The work phases 1 to 9 for the civil engineering and road construction (object and structural engineering bridge without performing static, execution and engineering of LpH 4)

- Local construction supervision,

- Environmental Specialist studies

- Surveying services,

- Assessment,

- Examination of the case by §3c UVPG and §5 NUVPG,

- Sound advice,

- Open Space Planning,

- Soil investigation,

- Retention area calculations,

- Planning,

- Acceptance of structural steel or prestressed concrete components of plant production,

- Chemical analysis and investigation of disposal routes,

- Hydraulic calculations and verifications.

The Okerbrücke Leiferde and Kulkegrabenbrücke should be included completed approximately 260 m road and all necessary replacement measures by the end of 2020th The total volume of construction is approximately 4,000,000 EUR gross (without planning costs / Engineering services of this process).

Structural steel erection work for structures

Städtisches Klinikum Braunschweig gGmbH | Published April 27, 2016  -  Deadline June 1, 2016
cpvs
45262420, 45262670, 45223110

The second section includes implementation measures at the site and Salzdahlumer Celler Straße. In planning a division of the second implementation section is done in the portions 2A and 2B. The main focus carried out renovation and new construction at the site Salzdahlumer road. In section 2B of the renovation and expansion at the site Celler road and conversions in existing at the site Salzdahlumer road done. 2. Realization section construction phase 2A On Location Salzdahlumer road following measures are implemented: - Construction of a ward block for general care, care of the Children's Hospital and the pediatric surgery, critical care and intermediate care - New Children's Hospital - laying of Anesthesiology - creating an abdominal center (Med. clinic I with endoscopy and general surgery) - creation of a heart center (HTG clinic and the Medical clinic II) -. laying of Ophthalmology and ear, nose and throat clinic as a basis for the head center - laying the accident and plastic surgery - reconstruction carried expansion of the canteen at the site Celler Straße -. dialysis and Medical clinic V - creation of a new main entrance (address generation) - extension of the emergency room - expanding the engagement center and creating a night monitoring - conversion and extension of the Central surgical department - expansion of the laboratory the extension of maternity to a delivery room. For this, the required construction cost groups 200 - to forgive 500 DIN 276th Overall, the Works will include approximately 52 000 m² of gross floor area. In Municipal Hospital Braunschweig are in the floors 1. UG - 4th floor of the components A and B perform locksmith services. The clear floor height is up about 4 feet. To be carried out are handrails in stairwells and steel staircases. , See also point II.2.1).

VOF Building - Technical University of Braunschweig - Restoration AudiMax.

Staatliches Baumanagement Braunschweig | Published March 15, 2016
Winner
Dr. Krekeler Generalplaner GmbH
cpvs
71200000

The AudiMax Braunschweig University of Technology allows 800 people to participate in lectures and is the largest university lecture hall.

It is located in a central location of the TU, the Forum Square, and is part of the built 1959-1962 by Friedrich Wilhelm Kraemer of buildings enclosing the square urban. The building is listed under § 3 (2) + § 3 (3) NDSchG.

First restructuring measures have already been held in the year of 2010. These measures included the roofing, including thermal insulation above the auditorium cube, the ventilation technology (heating and fresh air without cooling), Flooring / stalls AudiMax and media technology.

In the current reorganization measure following scope is planned:

Restoration of listed facades (AudiMax incl. Internal glare protection, EC above the parapet masonry)

Restoration of the accessible roof on the 1st floor,

Restoration of monumental wooden ceiling in the foyer incl. Lighting and emergency lighting,

Renovation of outside lights,

Renewal of the fire alarm system and requirements for fire protection in the EC,

Extension of the existing ventilation system for cooling the two auditoriums,

Renewed renovation of auditorium stalls,

It is an estimate of the construction costs of 3.8 million EUR gross plus building costs before.

It omitted here to the KG 300 about 2 EUR 200 000 to the KG 400 570 000 EUR.

It is planned to complete the budget document construction to the end of August 2016, including more accurate cost calculation. Upon approval and completion of the detailed design, a construction in February 2017, sought.

In view of the high utilization of the building accommodating a replacement is necessary, which is not part of the measure. The construction period should be reduced to a minimum to use the semester breaks the University as effectively as possible.

Architectural and related services

Staatliches Baumanagement Braunschweig | Published November 14, 2015  -  Deadline December 15, 2015
cpvs
71200000

The AudiMax the Technische Universität Braunschweig allows 800 people to attend lectures and is the largest university lecture hall. It is located in the midtown area of ​​TU, ​​the Forum Square, and is part of the built 1959-1962 by Friedrich Wilhelm Kraemer of buildings enclosing the square urban. The building is listed under § 3 (2) + § 3 (3) NDSchG. First remediation measures have already taken place in the year of 2010. These measures included the roofing, including thermal insulation above the auditorium cube, the ventilation technology (heating and fresh air without cooling), Flooring / stalls AudiMax and media technology. In the current reorganization measure following scope is planned: restoration of listed facades (incl AudiMax internal glare protection, EC above the parapet masonry.); Restoration of the roof walk on the 1st floor; Restoration of monumental wooden ceiling in the foyer including lighting and security lighting. Restoration of the orbiting outdoor lighting; Renewal of the fire alarm system and requirements for fire protection in the EC; Extension of the existing ventilation system for cooling of the two auditoriums; Renewed rehabilitation of the auditorium stalls; It is an estimate of the construction costs amounting to 3.8 million EUR gross plus building costs before. It omitted here to the KG 300 about 2 EUR 200 000 to the KG 400 570 000 EUR. It is planned to finalize the Budget pad construction by the end of August 2016, including more accurate cost calculation. Upon approval and completion of the detailed design, a construction in February 2017 aimed at. In view of the high utilization of the building accommodating a replacement is necessary, which is not part of the measure. The construction period should be reduced to a minimum, to use the semester breaks the University as effectively as possible.

Engineering design services

Stadt Braunschweig | Published September 26, 2017
Winner
BPR Dipl.-Ing. Bernd F. Künne & Partner
cpvs
71320000, 71322500, 71327000

The existing Oker bridge has been completely blocked since June 2016, so the bridge, like a small bridge over the Kulkegraben, has to be replaced at short notice by a new building. The task of the planners is the elaboration of the bridge and road design, the boundary conditions stipulated by the client as well as the required control profile, the safe dissipation of the five- and one hundred-year floods without additional accumulation, a given terrain situation, all environmental concerns to be taken into consideration for humans, flora and fauna , Retentive balance as well as a pleasing aesthetics of the design.

The city of Braunschweig intends to award the following planning services on the basis of the HOAI to an engineering office for the project "Neubau der Okerbrücke Leiferde"

- performance phases 1 to 9 for civil engineering and road construction (object and load-bearing design bridge construction without structural statics, execution and plant planning of LpH 4),

- local construction supervision,

- environmental studies,

- Surveying services,

- environmental impact assessment,

- preliminary examination of the individual case according to §3c UVPG and §5 NUVPG,

- sound appraisals,

- open space planning,

- Ground investigation,

- Retention space calculations,

- soil management,

- dismantling of structural steel or prestressed concrete components of the factory,

- Chemical analyzes and determination of disposal routes,

- Hydraulic calculations and proofs.

The Oker bridge Leiferde and the Kulkegraben bridge are to be completed including about 260 m of road construction and all necessary replacement measures by the end of 2020. The total building volume is approximately 4,000,000 EUR gross (excluding planning costs / engineering services of this procedure).

Electrical installation work

Nibelungen-Wohnbau GmbH | Published March 4, 2017  -  Deadline March 20, 2017
cpvs
45310000

The construction project is the site power supply of a residential complex with 9 separate buildings and 220 residential units.

It is the Grundbaustromversorgung, as well as the Baubeleuchtung to prepare for building the C2, C3, C4, B1, B2 and D.

The lines must be installed on the building site, the Baustromverteiler provided and connected.

The measuring device with a transducer measurement, all required group distribution and the supply of building A1 and A2 are already installed and are not part of this contract.

Scientific installations

Staatl. Baumanagement Braunschweig | Published December 6, 2016
Winner
Octanorm Vertriebs GmbH
cpvs
45214630, 45214631

Cleanroom technology.

Approximately 120 m 2 Cleanroom ceiling construction,

approximately 110 m cleanroom wall,

60 St. downlights,

1 St. air shower,

1 St. Material hatch,

7 St. cleanroom doors.

Federal Office for Radiation Protection Salzgitter (BfS), extension service building - geothermal geothermal probe field - 16 E 10094th

Staatliches Baumanagement Braunschweig | Published March 15, 2016  -  Deadline April 5, 2016
cpvs
45232142, 45200000, 45122000, 45112000, 45232450

Geothermal - earth probe:

15 pcs. Geothermal probe drilling about 70 m /

15 St. fitted double -U-geothermal probe pipes length up to 75 m /

including earthworks for distribution system through manholes

including associated pipeline construction.

Laboratory furniture

Helmholtz-Zentrum für Infektionsforschung GmbH | Published January 21, 2015
Winner
<CONTACT_DATA_WITHOUT_RESPONSIBLE_NAME><ORGANISATION><OFFICIALNAME>Waldner Laboreinrichtungen GmbH</OFFICIALNAME></ORGANISATION><ADDRESS>Haidösch 1</ADDRESS><TOWN>Wangen</TOWN><POSTAL_CODE>88229</POSTAL_CODE><COUNTRY VALUE="DE"/></CONTACT_DATA_WITHOUT_RESPONSIBLE_NAME>
cpvs
39180000, 39181000, 45332200, 45332000, 45311000, 45333000, 51430000, 45214610, 45214600

On the campus of the University of the Saarland the construction of a new laboratory building for the HIPS is planned. It is intended in a 4-storey building on approximately 4515 m2 HNF and corresponding approximately 8 600 m2 of gross floor space to integrate pharmaceutical research. In addition to 1 450 m2 of office space approx 2860 m2 laboratory space with S1 or S2 standard are required and associated social, storage and common areas. This contract is the manufacture of laboratory furniture throughout.

VP 27- Facade: painting + thermal insulation composite system

Städtisches Klinikum Braunschweig gGmbH | Published November 23, 2017  -  Deadline January 11, 2018
cpvs

The Städtische Klinikum Braunschweig gGmbH is currently providing its clinical services to 3 locations located in the city of Braunschweig. In future, the Städtische Klinikum Braunschweig gGmbH will provide its services at only 2 locations. To achieve this goal, a major construction project is being carried out at the Salzdahlumer Straße location. Services for paintwork and thermal insulation composite system according to EnEV 2009 are required for the facades of the building components A and B.

VP 27- Facade: curtain wall (VHF)

Städtisches Klinikum Braunschweig gGmbH, Geschäftsbereich Bau und Technik | Published April 26, 2018
cpvs
45443000, 45321000

The Städtische Klinikum Braunschweig gGmbH is currently providing its clinical services to 3 locations located in the city of Braunschweig. In future, the Städtische Klinikum Braunschweig gGmbH will provide its services at only 2 locations. To achieve this goal, a major construction project is being carried out at the Salzdahlumer Straße location. For the façade design and lining of building components A and B, services for the curtain wall (VHF) with fiber cement boards are required.

Fraunhofer WKI ZELUBA V_024_755885_21 Wastewater, water and gas plants

Fraunhofer-Gesellschaft e.V. - Vergabestelle Bau | Published May 17, 2018  -  Deadline June 14, 2018
cpvs

Fraunhofer WKI ZELUBA V_024_755885_21 Waste water, water and gas plants - new construction WKI-ZELUBA Waste water plant for a laboratory building with wastewater and laboratory wastewater (without neutralization plant), slightly enclosed rain drainage, drinking water system, demineralised water system with reverse osmosis system. Stainless steel pipe press fitting approx. 750 m. PPh pipe IR-welded approx. 1000 m. Insulation.

Facade work

Helmholtz-Zentrum für Infektionsforschung GmbH | Published April 29, 2017
Winner
Hupfeld &amp; Schlöffel Metallbau GmbH
cpvs
45443000, 45262670, 45212190, 45441000, 45113000

The Center for Drug Research and Functional Genomics is planned as a research platform, which is planned in the center of the campus of the Helmholtz Center (HZI) in Braunschweig. It is intended to build a 4-storey, basemented building with approx. 4 400 m² HNF and approx. 9 400 m² gross floor area. In addition to approximately 1,000 m² of office and seminar room space, approximately 3,200 m² of laboratory space with S1 and S2 standards (chemilabore, microbiology, biological laboratories, biotechnology areas) are needed as well as storage rooms.

The call for tenders will cover façade and metal work for the construction of a 4-storey laboratory and office building with a ventilation center, building B2 in Braunschweig. Among other things, mullion-bar constructions with windows, night-ventilation wings and door systems, metal wall cladding are smooth on the technical floor 4.OG, perforated and designed as a wave of EC 3rd floor, insulation work, glazing work, sun protection works.

- approx. 1,900 m² mullion and transom construction;

- approx. 1,300 m² sun protection glazing;

- approx. 630 m³ aluminum smooth sheet composite wall coverings;

- approx. 890 m² aluminum corrugated wall coverings;

- approx. 370 m² perforated aluminum wall panel perforated;

- approx. 365 m² aluminum smoothing plate perforated, outside + inside;

- approx. 1,200 m aluminum frame around PR construction;

- approx. 1,650 m² vertical solar protection systems;

- approx. 135 m² suspended outside ceiling;

- RWA systems.

Elevators and conveyors

Nibelungen-Wohnbau GmbH | Published March 3, 2017  -  Deadline March 16, 2017
cpvs
42417000

The 10 conveyor systems are installed depending on the progress of the building.

The construction project is a residential complex of 9 separate buildings. These buildings are a total of 10 conveyor systems, each without separate engine rooms, planned.

The complex is currently under construction, so the installation will also be executed completely in uninhabited state.

In each case, 6 lifts with 5 stops, 3 lifts with 7 stops and an elevator system with 9 stops are provided to divide the individual buildings which are as follows:

Building A1 - 5 stops;

Building A2 West - 5 stops;

Building A2 East - 9 stops;

Building B1 - 5 stops;

Building B2 - 5 stops;

Building C1 - 5 stops;

Building C2 - 7 stops;

Building C3 - 7 stops;

Building C4 - 7 stops;

Building D - 5 stops.

Roof insulation work

Stadt Braunschweig, Der Oberbürgermeister | Published December 17, 2016  -  Deadline January 31, 2017
cpvs
45261410

- Remove existing upper roof structures, PS insulation about 2 300 meters 2 ;

- Removal of existing lower roof structures, bed about 2 000m 2 ;

- Removal of existing gutters, etc. about 330 m;

- Removal of asbestos facade and roof panels about 35 m 2 ;

- New roof construction, bituminous seal, EPS insulation gradient 25-40 cm about 2 000m 2 ;

- New roof construction, bituminous seal, EPS insulation 20 cm 300 m 2 ;

- Guttering 330 m;

- Skylights 16 St .;

- New facades and roof cladding with fiber cement boards about 35 m 2 ,

Roof insulation work

Stadt Braunschweig, Der Oberbürgermeister | Published December 10, 2016  -  Deadline January 13, 2017
cpvs
45261410

- Remove existing upper roof structures, PS insulation about 2 300 meters 2 ;

- Removal of existing lower roof structures, bed about 2 000m 2 ;

- Removal of existing gutters, etc. about 330 m;

- Removal of asbestos facade and roof panels about 35 m 2 ;

- New roof construction, bituminous seal, EPS insulation gradient 25-40 cm about 2 000m 2 ;

- New roof construction, bituminous seal, EPS insulation 20 cm 300 m 2 ;

- Guttering 330 m;

- Skylights 16 St .;

- New facades and roof cladding with fiber cement boards about 35 m 2 ,

Roof insulation work

Stadt Braunschweig, Der Oberbürgermeister | Published February 1, 2017  -  Deadline February 17, 2017
cpvs
45261410

- Remove existing upper roof structures, PS insulation about 2 300 meters 2 ;

- Removal of existing lower roof structures, bed about 2 000m 2 ;

- Removal of existing gutters, etc. about 330 m;

- Removal of asbestos facade and roof panels about 35 m 2 ;

- New roof construction, bituminous seal, EPS insulation gradient 25-40 cm about 2 000m 2 ;

- New roof construction, bituminous seal, EPS insulation 20 cm 300 m 2 ;

- Guttering 330 m;

- Skylights 16 St .;

- New facades and roof cladding with fiber cement boards about 35 m 2 ,