Catenary's construction works

Braunschweiger Verkehrs-GmbH | Published February 7, 2017  -  Deadline March 16, 2017
cpvs
45234160

Dismantling of existing and construction of the catenary system at the various stages of the project reorganization of transport facilities Helmstedter Street West.

This also includes work in the field of Leonhard square one with.

Area Helmstedter Street West overall length of the reconstruction distance: 800m double track disassembly inventory catenary 900m number of alternate end Masts: 44 hexagonal steel poles with lengths from 9,30m to 11,30m.

Foundations: 40 Bohrrohrfundamente, 4 concrete plinths rope tension catenary: 26 St .;

Cable rigging lighting: 12 St .;

Wall anchors: 4 St .;

Bridge protection dismantling, with a length of 200m;

Bridge protection delivery and assembly: FRP panels covering approximately 420m 2 ;

A catenary alternating field 4 Gewichtsradspanner;

Elastic bases for trolley wire mounting under the railway bridge: about 26 St .;

Provisional mobile foundations for stringing provisional Gleiswechsel: 3 St .;

Feedpoint: 1 St .;

Contact wire: 1 800 Section isolator 2 St .;

Area Leonhardplatz number of alternate end Masts: 2 hexagonal steel poles with lengths from 9,30m to 11,30m;

Foundations: 2 Bohrrohrfundamente rope tension catenary: 2 St.

Road construction works

Stadt Braunschweig | Published February 4, 2017  -  Deadline March 14, 2017
cpvs
45233120, 45232410, 45234116, 45232000, 45112700

There are canal road and railway works and earthworks provided for laying of further supply lines and cables. 

Track construction:

record and depart 2320.000 m² track paving;

Removing 1610.000 m Existing track, dispose;

Record Memo base course. u. Beseit .;

820,000 m³ BetTragsch. aufn. and depart;

dissolve and depart 1400.000 m³ of soil;

5000.000 m² Planum produce and condense;

690,000 m² crushed stone base was. u. einb .;

810,000 m³ concrete bed produce 32 cm for Ri-tracks;

530,000 m³ concrete bed produce 30 cm for Ortec-tracks;

470,000 m New ORTEC / VIBREX track embarrassed;

900,000 m track 60R1 / 60R2 embarrassed (on concrete blocks);

Auflegeweiche embarrassed;

Bauweiche embarrassed;

put 180,000 m concrete Profilestone the AG;

540,000 m² of concrete paving 300x300x80'm .;

500,000 m³ track covering C 30/37, produce 14 cm;

160,000 m³ steel fiber concrete pavement, producing anthracite;

5400.000 m cable conduits embarrassed;

delivery and installation L.;

delivery and installation L..

road:

Tragsch. aufn. u leave.

Fastenings,. in Fahrb. aufn. u leave.

3920.000 m² concrete slabs in the walkway aufn. and depart;

dissolve and depart 9500.000 m³ of soil;

23640.000 m² Planum produce and condense;

delivery and installation base course 0/32;

19500.000 m² crushed stone base was. u. einb .;

delivery and installation 6000.000 m² asphalt binder;

delivery and installation support layer;

provide 400,000 m plastic pipes DN 150 and embarrassed;

supplied and installed 235,000 linear meters of reinforced concrete pipe DN 300;

Pump shaft delivery and installation;

Supply and install 100,000 m plastic pipe HDPE;

produce 220,000 m² steel sheet piling;

300x300x80 deliver 6430.000 m² concrete paving and laughed .;

700,000 m² nature Kleinpfl. produce;

800,000 m Nat.hochbord 21/25/25 ran. u put.

425,000 m² nature RinnKleinPfl. produce;

675,000 m BetBord HB 120 / 150x300 deliver and enable;

2200.000 m BetBord TB 80x200 (60x200 EF) provide and sit .;

deliver and enable 290,000 m steel edging sheet;

provide 125,000 m railing with knee rail and up;

5280.000 m² SMA 11 S einb, iFahrbahn.

Layer.

Landschaftsbauarbeiten City BS:

700,000 m³ creating planting trenches;

delivery and installation 800,000 to substrate for planting mines;

deliver and plant trees.

Sewer rainwater and wastewater:

u.Lagern or invite 3050.000 m³ Easy and moderate detachable Bodenausheben.

delivery and installation 3570.000 m³ Sandy Füllkies;

4350.000 m² border aided Trench Road channels;

2400.000 m² border aided Trench connecting channels;

deliver 320,000 lfdm stoneware pipes DN 150 and embarrassed;

deliver 340,000 lfdm stoneware pipes DN 250 and embarrassed;

supplied and installed 200,000 linear m stoneware pipes DN 300;

supplied and installed 120,000 linear meters of reinforced concrete pipe DN 300;

supplied and installed 165,000 linear meters of reinforced concrete pipe DN 600;

supplied and installed 320,000 linear meters FABEKUN®-HS-R-plastic pipes DN 150;

Manholes - deliver precast to 3 m and set.

Others:

In addition, implementation of surveying services, traffic safety, weapons monitoring,

Equipment Pumpwerk City BS,

Public Works for sharing / backup supply and waste pipes.

New drug center (HZI-B2) - VE22 facades and metal construction

Helmholtz-Zentrum für Infektionsforschung GmbH | Published February 24, 2017  -  Deadline March 30, 2017
cpvs
45443000, 45262670, 45212190, 45441000, 45113000

VE22 facades and metal construction: the contract relates for the Facade and metal construction work for the construction of a 4-story laboratory and office building with central ventilation, building B2 in Braunschweig. There are, among other post and beam construction with windows, night ventilation wings and door systems, metal wall coverings glattam service floor 4th floor, punched and a wave of EC - perform 3rd floor, insulation work, Glazing work, Sun-protection works.

Building construction work

Stadt Braunschweig, Der Oberbürgermeister | Published February 1, 2017
cpvs
45210000, 45214000

Restoration of various areas of the building. These include roof, structural, façade,

Waterproofing works, suspended ceilings, electrical, ventilation, plumbing. Parallel to the main building areas of

Gym and the multipurpose hall refurbished (ceilings, windows, facades).

Multi-dwelling buildings construction work

Nibelungen Wohnbau GmbH | Published February 18, 2017  -  Deadline March 17, 2017
cpvs
45211340, 45421143, 45421100

Plastic windows, sun protection.

Window sunshade.

Steel and metal construction, Viktoria greenhouse Humboldt Straße 1, 38106 Braunschweig

Technische Universität Braunschweig, Geschäftsbereich 3 - Gebäudemanagement | Published February 23, 2017  -  Deadline March 14, 2017
cpvs
45262670

Structural shell work

Stadt Braunschweig, Der Oberbürgermeister | Published February 24, 2017  -  Deadline March 21, 2017
cpvs
45223220

Upstairs, fine masonry fire walls in the attic part B and C, cutting the holes for mounting the RWA skylights in Treppenhaus 1/2 and hoistway head Paternoster, rehabilitation Flakstand on roof component B 

Rohbauarbeiten component B UG:

Cancel 290 sqm Flooring Linoleum and dispose of not polluted;

cancel steel profiles and dispose of not polluted;

1.2 m, cancel and discard, metal and polluted old mineral wool TRGS 521;

27 m 2 masonry of calcareous sandstone interior wall and lining of door openings.

Disposal, not polluted;

Disposal, not polluted;

95 m² Innenwandputz PII on alto and Neumauerwerk;

- Plastering of small surfaces, slots, inputs and Beiputzen etc .;

Disposal, not polluted and closed again with concrete;

Making Trades and dispose of 100 m² Cement screed, not polluted and new topping C 30 F5.

Rohbauarbeiten component B UG:

Cancel subareas to 0.5 m² with lining made of solid wood parquet and dispose, polluted, waste wood category A III, pollutant PAHs TRGS 551;

Cancel subareas to 0.5 m² with ceilings of gypsum boards and dispose of not polluted;

Cancel subareas to 0.5 m² with insulation on mineral wool blanket and dispose of waste dangerous, polluted old Miwo TRGS 521;

Cancel subareas to 0.5 m² with ceiling clothing cleaned as plaster base ceiling reeds and dispose of not polluted;

15 m 2 brickwork from calcium for Nischenausmauerung, thickness from 11.5 to 17.5 cm;

125 m slots in geputztem masonry mill, width about 15 to 45 cm, depth about 5 to 15 cm and dispose of not polluted;

Disposal, not polluted;

Disposal, not polluted;

15 m² Innenwandputz PII on alto and Neumauerwerk;

- Plastering of small surfaces, slots, inputs and Beiputzen etc .;

Disposal, polluted PAK TRGS 551;

Disposal, mainly polluted PAK TRGS 551;

Formwork and reinforcement;

Formwork, single size over 150-10000 cm, depth 12.5 to 25 cm.

Fire walls component B and C:

behind stuff matching and with mineral wool;

- 70 m² Innenwandputz P II on Brandwandaufmauerung.

Staircase 1, 2 and lift:

Disposal, not polluted incl. Necessary safeguards.

Restoration Flakstand component B:

4 m³ of reinforced concrete of beams and plates and cancel and discard, not polluted;

cancel 10 m reinforced concrete supports of 25/25 cm and dispose of not polluted;

Cancel 11 m³ of masonry infill from bricks and Verblendklinker, not polluted;

Formwork and reinforcement;

Formwork and reinforcement;

35 m² of masonry infill of reinforced concrete frame, exposed masonry sand-lime bricks with joints smooth finish, masonry thickness 17.5 cm;

45 m² brickwork clinker KHLz with joints smooth finish.

Software Facility Management

Städtisches Klinikum Braunschweig gGmbH (GBA) | Published February 21, 2017  -  Deadline March 22, 2017
cpvs

Software Facility Management Modular product, with the option of extension for other business sectors and applications such as the Department of Construction, Home and Industrial Engineering incl. Licenses and services for the construction and operation of both a test system and a production system

Reordering traffic facilities Helmstedter Street West

Braunschweiger Verkehrs-GmbH | Published February 6, 2017  -  Deadline March 16, 2017
cpvs

Dismantling of existing and construction of the catenary system at the various stages of the project reorganization of transport facilities Helmstedter Street West. This also includes work in the field of Leonhard square one with.

Facade work

Helmholtz-Zentrum für Infektionsforschung GmbH | Published February 24, 2017  -  Deadline March 30, 2017
cpvs
45443000, 45262670, 45212190, 45441000, 45113000

The Center for drug discovery and functional genomics is planned as a research platform, which is provided in a central position on the campus of the Helmholtz Centre (HZI) in Braunschweig. It is intended a 4-storey, basement building with about 4 400m² HNF and about 9 400 m² GFA to build. In addition to about 1 000 sqm office and conference room areas are about 3 200 m² of laboratory space with S1 and S2 standard (chemistry laboratories, microbiology, biological laboratories, biotechnological areas) required and associated storage rooms.

Such invitations to tender are the Facade and metal construction work for the construction of a 4-story laboratory and office building with central ventilation, building B2 in Braunschweig. There are, among other post and beam construction with windows, night ventilation wings and door systems, metal wall linings smoothly on the technical floor 4th floor, punched and a wave of EC - perform 3rd floor, insulation work, Glazing work, Sun-protection works.

- Approximately 1 900 m 2 Post and beam construction;

- Approximately 1 300 meters 2 Sun protection glazing;

- Approximately 630 m 3 Aluminum smooth metal composite wall covering;

- Approximately 890 m 2 Aluminum corrugated wall cladding;

- Approximately 370 m 2 Aluminum corrugated wall cladding perforated;

- Approximately 365 m 2 perforated aluminum smooth sheet metal paneling, outside + inside;

- Approximately 1 200 meters aluminum liner sleeve to PR-construction;

- Approximately 1 650 meters 2 Vertical sun protection systems;

- Approximately 135 m 2 suspended outside ceiling;

- RWA systems.

Roof insulation work

Stadt Braunschweig, Der Oberbürgermeister | Published February 21, 2017  -  Deadline April 7, 2017
cpvs
45261410

- Remove existing upper roof structures, PS insulation approx 2300 m²;

- Removal of existing lower roof structures, bed about 2 000 m² of;

- Removal of existing gutters, etc. about 330 m;

- Removal of asbestos facade and roof panels about 35 m²;

- New roof construction, bituminous seal, EPS insulation gradient 25-40 cm approx 2000 m²;

- New roof construction, bituminous seal, EPS insulation 20 cm approx 300 m²;

- Guttering 330 m;

- Skylights 16 St .;

- New facades and roof cladding with fiber cement boards about 35 m².