Call +44 800 9755 164

Public tenders for construction in Bonn Germany

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

Liegenschaften | Published December 23, 2016
construction work

Construction work

Universitätsklinikum Bonn | Published January 7, 2017  -  Deadline February 7, 2017

The University of Bonn (UKB) plant in the western region, south of Hematology, on the Venusberg to build a new headquarters Sterilgutversorgungsanlage. The new CSSD is required to ensure a sufficient supply of the hospital operation. A main objective of the new CSSD is to centralize the sterile supply and thereby improve as operations. During the construction of a solution for the implementation of optimal operating procedures and in particular a reduction in the follow-up costs to be found.

With the construction of the CSSD therefore the gradual dissolution of the currently existing decentralized sterilization units connected (current main facility in Surgical Center). The centralization of sterile services is a core component of the master plan for the structural and functional development of the UKB until 2020.

It is intended to award the performance of Public Works II in the course of an open tender.

Public Works II for the new CSSD.

Construction-site supervision services

Bundesstadt Bonn, Referat Vergabedienste | Published December 20, 2016  -  Deadline January 24, 2017

SGB-240093

Monument Accessible repair and modernization of the Beethovenhalle Bonn VE 48 Construction Service.

Construction site services and safety in particular:

Access and access control: access container, site manager, Toreinweiser;

Security: patrolling, camera mast and foundation, light pole and connection boxes;.

Baulogistik: Logistics Coordinator administratively, operationally, logistics containers, forklifts;

Disposal logistics: setting up recycling center, waste containers, waste, container transport ,; Cleaning Logistics: coarse cleaning of common areas, stairwells and escape routes; Winter service: hold equipment, evacuate

Provision of the said measures before.

Steam-generation plant construction work

Universitätsklinikum Bonn | Published January 4, 2017  -  Deadline February 2, 2017

The University of Bonn (UKB) plant in the western region, south of Hematology, on the Venusberg to build a new headquarters Sterilgutversorgungsanlage. The new CSSD is required to ensure a sufficient supply of the hospital operation. A main objective of the new CSSD is to centralize the sterile supply and thus z. B. to improve operations. During the construction of a solution for the implementation of optimal operating procedures and in particular a reduction in the follow-up costs to be found.

With the construction of the CSSD therefore the gradual dissolution of the currently existing decentralized sterilization units connected (current main facility in Surgical Center). The centralization of sterile services is a core component of the master plan for the structural and functional development of the UKB until 2020.

It is planned to place the power of the steam supply in the course of an open tender.

Steam supply for the new CSSD.

Project-management services other than for construction work

Bundesministerium für Verkehr und digitale Infrastruktur (BMVI) | Published December 24, 2016  -  Deadline January 26, 2017

The BMVI has gradually introducing Cooperative Systems decided to motorways, which in 3 steps (preliminary development and testing from the beginning of 2013, Corridor Rotterdam - Frankfurt / Main - Vienna, then rest Germany) warnings of roadworks directly from the warning trailer at the construction site in the vehicles transmitted while the traffic situation can be detected on the vehicle side. The organization of cooperation between all partners in the introduction of Cooperative Systems in Germany and in the euro corridor is voluntary and at their own cost the partners. The collaboration is described in the Project Management Guide. With this call a TO is mandated based in an operational project management to monitor this project handbook, the following activities with regard to their work progress and to relieve the AG in all matters relating to project coordination and project documentation (Project Office).

The contractor (Project Office) supports the project (BMVI) in all operational tasks of project management for the German part of the corridor and at the interfaces to the Netherlands and Austria and the partners involved. The performance includes the following work content:

- Operative Project Management of the respective work packages;

- Professionally / technical support of the AG;

- Monitoring the progress of work;

- Coordination of planning and changing requirements;

- Ensuring the communication between the project participants;

- Quality assurance of the technical results;

- Further development of the project management manual in coordination with the client;

- Public relation.

Project language is German. but Due to the international participation, various documents in English are to create or moderate events / meetings in English.

Details s. Specifications (tender documents).

Structural shell work

Universitätsklinikum Bonn AöR | Published January 10, 2017  -  Deadline February 16, 2017

The University Hospital Bonn operates a biomedical center (BMZ I) and intends the construction of a new Biomedical Centre (BMZ II) at the location Venusberg in Bonn.

The new building BMZ II comprises a total floor space of approximately 4 500 m². Herein are included:

- A laboratory and office area with adjoining rooms (approximately 3500 m²).

- More shareable technical platforms (core facilities, about 1 000 sqm) as the livestock, Robotics, Microscopy / Imaging, FACS (flow cytometry) and biobanking.

The standing on the construction site buildings have already been demolished. All supply and waste pipes are located in or in the immediate vicinity of the construction site. You have to be allocated in accordance with, or introduced to the BMZ II. For good cooperation between different research groups as links BMZ II to the existing BMZ I provided.

In an open call first to the technical crew of "structural work" are commissioned.

Structural work for the new BMZ II.

Construction work

Universitätsklinikum Bonn | Published January 10, 2017  -  Deadline February 9, 2017

The University Hospital Bonn built on the Venusberg, the new parent-child center. The new building will replace the stock in the city center and summarizes the functions of obstetrics and paediatrics. It realized 172 beds, including 13 beds of the pediatric intensive care. 2 neonatal stations, 3 stations of Pediatrics, the stations of obstetrics and maternity cases, and an oncology care with day hospital are provided. The parent-child center has 4 operating rooms and 4 delivery rooms and on outpatient obstetrics and pediatrics. The new building is a six-storey concrete frame with 11 787 m 2 Usable area built is planned with supporting facade, has a gross floor area of ​​25 946 m 2 and a gross volume of 106 188 m 3 ,

Under an open tender the services of the steel and glass doors are to be commissioned.

Steel and glass doors.

81194379-construction of a new training and seminar building for the Academy for International Cooperation, Bonn-Röttgen - free plants

Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH | Published December 22, 2016  -  Deadline February 1, 2017
Title of the contract: Construction of a new training and seminar building for the Academy for International Cooperation, Bonn-Röttgen - free installations.

Building construction work

Deutsche Stiftung Denkmalschutz | Published December 23, 2016

Scaffolding work for plastering and painting work to a listed building; anchor partly. in Tudor and rubble masonry. Facades Bt.E: 450 m . 2 ; Bt.F: 550 m 2

Architectural, construction, engineering and inspection services

Bundesstadt Bonn, Referat Vergabedienste | Published December 24, 2016  -  Deadline January 24, 2017

SGB-238327: Architectural services - Project planning, performance image building and interiors gem. § 34 HOAI, basic services of Phases. 1-9 (stepwise commissioning)

Restoration of Hardtberg bath (indoor) in Bonn (KG 300 + KG 400)

- Basic renovation of the bath, revamping the entire TGA;

- Extension to a toddler area

optional

- Expansion to an additional price pool with movable floor;

- Enlargement to include a chef's cap for outdoor and indoor dining.

Design services for the renovation and expansion of the indoor pool.

Works for complete or part construction and civil engineering work

Deutsche Stiftung Denkmalschutz | Published December 23, 2016
By lot allocation (land ceiling / wall): Bt.A 685/480 m  2  , Bt.B 400/350 m  2  , Bt.D 520/365 m  2  , Bt.E 685/530 m  2  , Bt.F 200/390 m  2  and Bt.N 1,200 / 900 m  2  , 

By lot allocation (land ceiling / wall): Bt.A 685/480 m . 2

By lot allocation (land ceiling / wall): Bt.B 400/350 m . 2

By lot allocation (land ceiling / wall): Bt.D 520/365 m . 2

By lot allocation (land ceiling / wall): Bt.E 685/530 m . 2

By lot allocation (land ceiling / wall): Bt.F 200/390 m . 2

By lot allocation (land ceiling / wall): Bt.N 1,200 / 900 m 2 ,

Federal City: 66-238648: Framework agreement for steel and metal construction work on the Bonn sewage treatment plants and pumping stations

Bundesstadt Bonn, Referat Vergabedienste | Published January 13, 2017

City of Bonn, SGB-241 156, new construction and renovation of the 5th Comprehensive School Bonn & apos; s Fifth -Fachklassenausstattung-

Bundesstadt Bonn, Referat Vergabedienste | Published January 22, 2017  -  Deadline February 21, 2017

Structural shell work

Bundesanstalt für Immobilienaufgaben (BImA) | Published December 24, 2016  -  Deadline January 27, 2017

The Institute for Federal Real Estate as principal (AG) proposes to grant the advanced structural work to a qualified contractor in connection with the modernization of the Grandhotel Petersberg.

The benefits to the Advanced structural work on an existing building mainly include:

- Masonry works, about 400 square meters,

- Concrete works, about 25 cubic meters,

- Core drilling and cutting work, about 1000 pcs.

- Stahlbauarbeiten, about 10 t,

- Teilabbruch- and -rückbauarbeiten bearing and non-bearing components of different qualities,

especially:

- Concrete components 300m²,

- Masonry approximately 2 200 sqm,

- Wallcoverings about 7 000 sq.m.,

- Doors about 300 pieces,

- Floor coverings with and without walls about 9 000 sq.m.,

- Suspended ceilings about 5 000 sq.m.,

- Numerous purposes,

-. Installation pipes including insulation about 6 000m.

The execution is carried out in principle in two phases.

New BMZ II - Structural

Universitätsklinikum Bonn AöR | Published January 8, 2017  -  Deadline February 16, 2017

Building services

Universitätsklinikum Bonn | Published December 29, 2016  -  Deadline February 2, 2017

The University of Bonn (UKB) plant in the western region, south of Hematology, on the Venusberg to build a new headquarters Sterilgutversorgungsanlage. The new CSSD is required to ensure a sufficient supply of the hospital operation. A main objective of the new CSSD is to centralize the sterile supply and thus z. B. to improve operations. During the construction of a solution for the implementation of optimal operating procedures and in particular a reduction in the follow-up costs to be found.

With the construction of the CSSD therefore the gradual dissolution of the currently existing decentralized sterilization units connected (current main facility in Surgical Center). The centralization of sterile services is a core component of the master plan for the structural and functional development of the UKB until 2020.

It is intended to award the performance of the measurement and control technology in the course of an open tender.

MSR technology for the new CSSD.

Compressed air

Universitätsklinikum Bonn | Published December 29, 2016  -  Deadline February 8, 2017

The University of Bonn (UKB) plant in the western region, south of Hematology, on the Venusberg to build a new headquarters Sterilgutversorgungsanlage. The new CSSD is required to ensure a sufficient supply of the hospital operation. A main objective of the new CSSD is to centralize the sterile supply and thus z. B. to improve operations. During the construction of a solution for the implementation of optimal operating procedures and in particular a reduction in the follow-up costs to be found.

With the construction of the CSSD therefore the gradual dissolution of the currently existing decentralized sterilization units connected (current main facility in Surgical Center). The centralization of sterile services is a core component of the master plan for the structural and functional development of the UKB until 2020.

It is intended to award the performance of the media and compressed air in the course of an open tender.

Media and compressed air for the new CSSD.

Electricity supply installations

Universitätsklinikum Bonn | Published December 30, 2016  -  Deadline February 7, 2017

The University of Bonn (UKB) plant in the western region, south of Hematology, on the Venusberg to build a new headquarters Sterilgutversorgungsanlage. The new CSSD is required to ensure a sufficient supply of the hospital operation. A main objective of the new CSSD is to centralize the sterile supply and thus z. B. to improve operations. During the construction of a solution for the implementation of optimal operating procedures and in particular a reduction in the follow-up costs to be found.

With the construction of the CSSD therefore the gradual dissolution of the currently existing decentralized sterilization units connected (current main facility in Surgical Center). The centralization of sterile services is a core component of the master plan for the structural and functional development of the UKB until 2020.

It is intended to award the performance of the power plant as part of an open tender.

Power installation for the new CSSD.

Joinery work

Universitätsklinikum Bonn | Published January 11, 2017  -  Deadline March 8, 2017

The University of Bonn (UKB) plant in the western region, south of Hematology, on the Venusberg to build a new headquarters Sterilgutversorgungsanlage. The new CSSD is required to ensure a sufficient supply of the hospital operation. A main objective of the new CSSD is to centralize the sterile supply and thus z. B. to improve operations. During the construction of a solution for the implementation of optimal operating procedures and in particular a reduction in the follow-up costs to be found.

With the construction of the CSSD therefore the gradual dissolution of the currently existing decentralized sterilization units connected (current main facility in Surgical Center). The centralization of sterile services is a core component of the master plan for the structural and functional development of the UKB until 2020.

It is intended to award the performance of the carpentry work in the course of an open tender.

Carpentry work for the new CSSD.

General Departmental Research - Constitutional Legal opinion on the introduction of an "inner development measure" ( "internal development activities area") in the Building Code

BBSR | Published January 19, 2017  -  Deadline February 9, 2017
As part of the Federal Ministry for Environment, Nature Conservation, Building and Nuclear Safety (BMUB) initiated Alliance for affordable housing and construction, the AG Active Property policy (see. Http://www.deutscher-verband.org/aktivitaeten/projekte/liegenschaftspolitik.html ) to be proposed to the examination of a new instrument of the special urban development law, enabled the dispersed existing land and fed to a building. The legislative conception of the new instrument - the "inner development measure" - raises particular with regard to the obligation to build and confiscatory legal advance effect constitutional issues that are to be examined by experts, taking into account the existing instruments of the special urban development law (especially urban development measure, expropriation, building order.) ,