Call +44 800 9755 164

Public tenders for construction in Bonn Germany

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

Bundesamt für Bauwesen und Raumordnung in Vertretung der BIMA | Published March 14, 2017  -  Deadline April 28, 2017
cpvs
45000000

Extension of the UNFCCC in Bonn.

Gas, water and drainage systems (sanitary).

Gas, water and drainage systems (sanitary).

- 1600 m water pipes (DN15-50) of stainless steel;

- 550 m water pipes (DN15-50) Polybutylene (PB);

- 117 St. sanitary equipment of sanitary ware;

- 34 St. sanitary equipment sanitary ware (accessible);

- 1 pc booster station (1.5 kW) f TW including control;..

. - 1 pc booster station (2.2 kW) for well water including control;.

- 1 St. hopper PE V = 2000 L;

- 2 000 m sewers (DN50-200) made of cast iron;

- 1 pc double pump sewage lifting unit 12 m 3 / H including control.

- 2 St. Fully submersible submersible sewage pump double unit 36 ​​m 3 /H;

- 2 St. Fully submersible submersible sewage pump double unit 40 m 3 /H;

- 2 St. Fully submersible submersible sewage pump double unit 53 m 3 /H;

-. 3 St. Fully submersible submersible pump f faecal waste water containing for vertical wet well installation (22 m 3 / H at H = 10);

- Associated control.

Proof: Minimum requirement for suitability.

Maintenance is with advertised.

Construction work for pipelines, communication and power lines

Bundesanstalt für Immobilienaufgaben | Published March 28, 2017  -  Deadline April 28, 2017
cpvs
45231000

The Institute for Federal Real Estate as principal (AG) proposes to grant the renewal of building automation to a qualified contractor in connection with the modernization of the Grandhotel Petersberg.

There is a conversion action / part renovation / refurbishment of building automation of Grandhotel Petersberg in inventory is running a hotel.

The conversion is divided into 2 phases of construction:

BA 1: North Wing (part 2 + 3 + 4);

BA 2: South Wing (part 1).

The services mainly include:

The renovation of the Grandhotel Petersberg includes technical / economic optimization of ventilation systems and heating and refrigeration systems. In this context, the associated building automation will be rebuilt, renovated and redeveloped. There are incl. Cabinet completely renewed partially and partly revised in the existing cabinets 9 information centers with about 2000 hardware points.

Future Construction - Expert Workshop "The building of tomorrow"

BBSR | Published April 10, 2017  -  Deadline May 3, 2017
cpvs

In the form of a high-level expert meeting as part of a two-day event key issues to be discussed for planning and building the future. Based on the discussion of future requirements and the identification of higher-level trends are discussed the impact on the construction and planning and future action and research fields are worked out. For this purpose, an external contractor will be responsible for the organization, implementation and follow-up. Based on the presentations and discussions of the experts a summary paper is to be created by the contractor in close consultation with the BBSR which is to contribute to the development of a medium and long-term framework program for research Zukunft Bau.

Engineering design services for the construction of civil engineering works

Stadtwerke Bonn GmbH | Published April 12, 2017  -  Deadline May 10, 2017
cpvs
71322000, 71321000

Planning services for building services for a family, school and sports pool.

The construction decision is to be taken even in 2017 based on a business case for the construction and operation of the bath.

The project planning has been announced already in the course of a competition, followed by negotiation procedures; the achievements of structural design will be advertised separately.

no generation facilities must be planned in the pool for these media.

The building services includes:

System group 1 Wasser-Abwasser - water; Sewage sanitary-engineering of plants with branched network

- installations for purifying waste water

- Equipment for the chemical and physical treatment of water

Swimming pool water treatment consisting essentially of:

Investment group 2 heat supply - heating equipment for the pool water, sauna etc.

Integration into system groups 1 and 3

- house distribution station for distributing heat

Heat cool; heat recovery; Be, - and dehumidification, etc.

Exterior lighting.

Single battery;

- Central emergency lighting;

- lightning protection and grounding systems;

- lighting systems with special requirements.

Profibusausgang

Public address systems; Site supervision; Timing systems, POS systems; including access systems, remote control transmission networks.

Investment group 6 conveyor systems - systems to ensure a barrier-free access to the pool as required by law.

- Equipment for Verfahrung a mobile platform.

7.- investment group 7 process plants - Laundry and Cleaning Equipment

- Fire extinguishers;

- smoke removal systems as automatically operated plant;

- fire detection systems;

Water treatment;

- technical equipment for water treatment plant also see Group 1;

- technical equipment for sewage discharge;

- technical equipment for water pumping and storage;

- technical equipment for sludge treatment.

Medium size kitchens for catering including storage and cooling

Conditioning Group 8 building automation -Gebäudeautomationssysteme or automation systems with plant intergroup system integration.

Works for complete or part construction and civil engineering work

Bonn-Netz GmbH | Published March 24, 2017  -  Deadline April 24, 2017
cpvs
45200000, 45210000

Structural work on a functional and office building with a basement and six full floors.

The access to the property is located in the Charles Street opposite the Nideggerstraße.

The building is cross constantly on the north side to the premises of "SWB Energie und Wasser" and on the eastern side of Charles Street.

The building has four staircases.

The façade envelope consists of a mineral insulation, air layer and pre-walled clinkers.

The shoring consists of both an overlapping bored pile wall and a Trägerbohlverbau, partially tied back with shotcrete.

The performance includes not only the general construction means, the shoring and excavation works, concrete and masonry work, insulation work and TGA inlays (ground water, sprinklers, ventilation ducts, CCTC, concrete conduit installation Electric, foundation earth).

6 St ..

Clinic construction work

Gemeinschaftskrankenhaus Bonn gGmbH | Published March 4, 2017  -  Deadline May 15, 2017
cpvs
45215130

New underground parking and cultivation clinic about 4 800 meters 2 , Remodeling clinic 400m 2 , Outdoor, some 4 300 m 2 ,

Future construction - research coordination and development of a master plan and strategic support Building Information Modeling (BIM)

BBSR | Published April 3, 2017  -  Deadline April 24, 2017
cpvs

Intention of this research is targeted Beforschung of the subject area BIM within the meaning of public building construction and the German building industry. For this to a research strategy that includes the BIM research needs taking into account previous research results, to be developed in dialogue with BMUB / BBSR and universities and research institutions. The networking of the required players may require the replacement of current research demands, -vorhaben, outcomes and promote -Experience and support the formation of a common BIM understanding and the integration of the BIM research.

Engineering design services for the construction of civil engineering works

Stadtwerke Bonn GmbH | Published April 13, 2017  -  Deadline May 10, 2017
cpvs
71322000, 71321000

Planning services for building services for a family, school and sports pool.

Future construction - Scientific monitoring of the BMUB / BMWi BIM course "Digital Design and Construction" on 24.05.2017

BBSR | Published April 12, 2017  -  Deadline April 26, 2017
cpvs

Preparation of content BIM event on May 24, 2017 and make a booklet with all the essential contents and results

Bundesstadtz Bonn, SGB-243440, Bonn Fifth - metal construction / locksmith services

Bundesstadt Bonn, Referat Vergabedienste | Published March 22, 2017  -  Deadline April 25, 2017
cpvs
45340000, 45341000, 45262670, 44233000

Federal City: SGB-244686: Marie-Kahle-school, old buildings - Construction Cleaning

Bundesstadt Bonn, Referat Vergabedienste | Published March 24, 2017
cpvs
90911200

Bundesstadt bonn, 300 - Stal construction works, Michaelschule, Ännchenstr. 31, 53177 Bonn

Bundesstadt Bonn, Referat Vergabedienste | Published April 21, 2017  -  Deadline May 17, 2017
cpvs
45223210

Federal City: 68-246917: construction depot cemetery Beuel - civil engineering and landscaping work

Bundesstadt Bonn, Referat Vergabedienste | Published April 12, 2017  -  Deadline May 10, 2017
cpvs
45236300, 45112714, 45215400

Paving and asphalting works

Gemeinschaftskrankenhaus Bonn St. Elisabeth – St. Petrus – St. Johannes gGmbH | Published April 11, 2017
cpvs
45233222

The size of the entire measure provisional Feuerwehrumfahrt comprises approximately 500 m2.

It is in the advertised work primarily to demolition and dismantling, as well as the construction of new asphalt surfaces as Feuerwehrumfahrt.

Load-bearing structure design services

Energie- und Wasserversorgung Bonn/Rhein-Sieg GmbH | Published April 8, 2017  -  Deadline May 9, 2017
cpvs
71327000

Benefits of structural design for a family, school and sports pool.

Stadtwerke Bonn intend to build a family, school and sports swimming pool, a diverse, contemporary offer for children, young people, in cooperation with the City of Bonn - offers families and seniors and optimal conditions for schools and clubs. The construction decision is to be taken even in 2017 based on a business case for the construction and operation of the bath.

For this project, in this process, benefits of structural design (service phases 1-4 according to §§ 51 para. HOAI and exceptional services 1) forgiven. The project planning has been announced already in the course of a competition, followed by negotiation procedures; Planning services of the technical equipment will be advertised separately yet.

Research services

Eisenbahn-Bundesamt | Published April 13, 2017  -  Deadline May 30, 2017
cpvs
73110000, 71300000, 73000000

Subject of contract is the research project developing test cases for ERTMS to support the approval and IBG procedure

the construction and supervision of railways and the concept of mutual recognition and updating of CCS TSI for the Federal Railway Authority.

The services to be performed both in the establishment of the future contractor and partially by the contracting authority at the headquarters in Bonn.

Reinforced-concrete work

Bundesstadt Bonn, Referat Vergabedienste | Published April 21, 2017  -  Deadline May 30, 2017
cpvs
45262310

SGB-248398:

Earthworks: Excavation and removal - approx. 24 827 m³, excavation excavation sole and compaction - approx. 1 863 m²;

Construction work: bored pile wall - approx. 620 m², anchor length - approx. 1 503 m, supporting board wall - approx. 487.8 m², micropiles - approx. 32 pcs., Large boring piles - ca.

Nozzle work: HDI building construction - approx. 1 460 m³, disposal overprofile - approx.1 277 m²;

Demolition work: Demolition of steel and reinforced concrete components (sole, walls, ceilings) - approx. 1 181 m³;

Wall works: masonry - approx. 344 m²;

Concrete work: Sole, walls, columns, supports, ceilings - approx. 2 687 m 3 , Formwork - approx. 6 547 m², reinforcement - approx. 425 tons;

Core drilling: in reinforced concrete - approx. 94 h, in masonry - approx. 5 h

SGB-248398:

Special low-rise building for the renovation and modernization of the Beethovenhalle Bonn.

Tiling work

Bundesanstalt für Immobilienaufgaben | Published April 21, 2017  -  Deadline May 26, 2017
cpvs
45431000

As part of the modernization of the Grandhotel Petersberg, the Bundesanstalt für Immobilienaufgaben as the client (AG) intends to award the painting and varnishing work to a qualified contractor.

The services mainly comprise:

- the supply and laying of approx. 170 m² wall tiles and 220 m base tiles with associated reaction resin seals;

- the supply and laying of approx. 380 m² floor tiles with approx. 250 m base and throat floor tiles including associated reaction resin seals;

- the delivery and renewal of a total of approx. 260 m² of damaged tiles in existing wall and floor tiles.

The construction is basically carried out in two building sections on a stock building.

Mechanical and electrical engineering services

Bundesamt für Bauwesen und Raumordnung, in Vertretung der BimA, | Published April 13, 2017  -  Deadline May 16, 2017
cpvs
71334000

See II.2.4 - Description of the procurement.

Information about construction work

There exists no single monument, but the ensemble protection should be preserved from urban and architectural reasons.

Subsequent renovation projects are the subject of the proposed assignment:

- Basic energy rehabilitation based on the EnEV 2013;

- Realization of accessibility and inclusion (input and transformation of lifts, barrier-free development, input and conversion of disabled toilets, etc.);

- building Ecology / sustainable building according to the rating system sustainable building (BNB), appropriate application of the guide sustainable building (LFNB);

Premises (renovation of offices, sanitary rooms, kitchens, meeting and function rooms, etc.);

- Mostly renewal of the electrical installation for the purpose of compliance with the current regulations, component replacement;

- Fire safety upgrade.

BGF, houses 18-19-20: 14100 m²

Project costs (net) KG 440 / KG 450: EUR 4 100 000

Summer 2024 (Phases 8)

The contract covers

The step agreement to be concluded to cover the entire HOAI image including the RBBau-section ES-Bau in EW construction quality.

- Services Specialist planning Electrical Building Services (Annex Group 4: Power plants and plant Group 5: telecommunications and information technology systems)

Phases 1-9 HOAI § 54ff for the basic renovation of the buildings 18, 19 and 20 and for the temporary space and media-technical connection of the container facility.

Rating System sustainable building (BNB);

- Special services such as inventory, documentation review, empty pipe planning for container connectivity, photo documentation, detailed

Proof of economic viability for illumination.

Summer 2028 (Phases 9).

However, a legal right to the transfer of all services does not exist.

Electrical wiring and fitting work

Bundesamt für Bauwesen und Raumordnung in Vertretung der BIMA | Published March 25, 2017  -  Deadline May 24, 2017
cpvs
45311000

Extension of the UNFCCC in Bonn

Power, incl. Maintenance.

Electrical installations:

Build a medium-voltage station, Generator, NSHV AV / SV,

Main power transmission part with busbar 1000 A part with main cables 10 000m, General installation in high quality with KNX and Dali. LED lighting and energy-saving lamps.

Window: The construction EG / 1.OG done in RC3 according to DIN EN 1627 for EMA.

Medium voltage system:

- MS switchgear with 7 fields;

- 2 transformer's 1200 kVA.

Own power plant:

- Emergency diesel 500 kVA.

Low-voltage distribution:

- Main energy distribution system with 1500 A;

- Busbar 1000 A.

Proof: Minimum requirements for suitability

Maintenance is with advertised.