Call +44 800 9755 164

Public tenders for construction in Bonn Germany

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

Universitätsklinikum Bonn | Published November 19, 2016  -  Deadline December 21, 2016

The University of Bonn (UKB) plant in the western region, south of Hematology, on the Venusberg to build a new headquarters Sterilgutversorgungsanlage. The new CSSD is required to ensure a sufficient supply of the hospital operation. A main objective of the new CSSD is to centralize the sterile supply and thus z. B. to improve operations. During the construction of a solution for the implementation of optimal operating procedures and in particular a reduction in the follow-up costs to be found.

With the construction of the CSSD therefore the gradual dissolution of the currently existing decentralized sterilization units connected (current main facility in Surgical Center). The centralization of sterile services is a core component of the master plan for the structural and functional development of the UKB until 2020.

It is intended to award the performance of plaster & stucco work in the course of an open tender.

Plaster and stucco work for the construction CSSD.

Construction work for lodging buildings

Bundesanstalt für Immobilienaufgaben (BImA) | Published November 16, 2016  -  Deadline December 12, 2016

The Institute for Federal Real Estate as principal (AG) intended in connection with the modernization of the Grandhotel Petersberg remodeling of guest rooms with hallways and hospitality and a lobby with a qualified general contractor (GU) to forgive.

To be given is general contractor includes:

These planning services are in particular:

- Continuation of the functional specifications before-set detailed design and additional detailed planning,

B. at terminals on the stock,

- Audit planning / inventory documentation.

In addition, the workshop and assembly planning is to create all the furniture and fittings, and the technical equipment.

Among the services of the contractor also include the local construction management (construction management and technical planning offices) and the turnkey construction of the following areas:

Title A: Hotel rooms with hallways.

Title B: bar, lounge, gallery and hall Thuringia, Smokers Lounge, Marble Hall, reception.

Title C: dining rooms / bistro, restaurant, wine bar and event.

Both construction phases are thus the subject of the award.

Construction and operation of the International Competence Centre Sustainable Chemistry (International Sustainable Chemistry Collaborative Centre - ISC3)

Umweltbundesamt, Zentrale Vergabestelle im Referat Z 6 | Published November 9, 2016
The Federal Environment Agency (UBA) intends to contract for the construction of the International

Construction work

Bundesamt für Bauwesen und Raumordnung | Published November 16, 2016  -  Deadline December 16, 2016

Federal Ministry of Environment, Nature Conservation, Building and Nuclear Safety;

Gas, water and drainage systems (sprinkler).

Gas, water and drainage systems (sprinkler system):

- Proof as VdS-approved installer of the extinguishing systems Style: Sprinklers,

- Dismantling of 240 m pipes as sprinkler pipes made of steel, including sprinklers, faucets;.

Intermediate tank and accessories:

- Supply and installation of 270 St sprinklers including accessories.

- Supply and installation of 7 700 meters sprinkler steel, including fittings and accessories.

- Supply and installation of sprinkler essentially consisting of pump, surge tank;

Pressure retaining Station, fittings cabinet incl. Cabling.

facade construction

Bundesamt für Bauwesen und Raumordnung | Published November 11, 2016

Load-bearing structure design services

Zoologisches Forschungsmuseum Alexander Koenig – Leibniz-Institut für Biodiversität der Tiere – Stiftung des öffentlichen Rechts | Published November 4, 2016  -  Deadline December 5, 2016
The Zoological Research Museum Alexander Koenig (ZFMK) is planning an extensive expansion. The aim is to ensure an appropriate premises for the Centre for Molecular Biodiversity Research and the scattered and / or inadequately accommodated bodies, in particular library and Biohistoricum, data center and the Section Ichthyology summarize and expand. For this purpose, the construction of a corresponding building followed. The project is supported with funding. The estimated construction cost for the extension amounts to 22.5 million EUR / gross (cost groups 200-600). A corresponding space program is already defined by the client.

Architectural, construction, engineering and inspection services

Universitätsklinkum Bonn | Published November 12, 2016  -  Deadline December 12, 2016
Benefits of structural design are to be awarded by negotiated procedure with preliminary qualification competition for the realization of the new building. 

These problems must be eliminated by centralizing establishment of the training center.

Focus of the training are the health care professions.

These include the skills labs, meeting rooms, the shareable reading room with Internet workstations and learning islands, equipping modern media, PC training rooms, group study rooms, shared sanitary facilities and a multifactorial usable auditorium area for common or school specific events or lecture series.

In addition to the accommodation of all schools and their respective support functions and the Medicine Historical Institute to be housed in the new training center.

Given the relevance to the UKB numbers, there is a daily teaching space requirement of at least nine classrooms and additional breakout rooms, the number of which is determined by the teaching methods.

Furthermore, the training center will expand the Department of conferences and symposia, to be held in these premises.

During a negotiated procedure to Europe-wide call for competition, the TW-planning services are to be awarded for the project described above.

B042 - safety Techn. Retrofitting tunnel Oberkassel; Clearance works (construction site preparation)

Regionalniederlassung Rhein-Berg, Außenstelle Köln | Published December 1, 2016  -  Deadline January 4, 2017

City of Bonn, SGB-235595, Schulzentrum Pennenfeld, metal construction, installation of fire doors / door elements without fire protection requirements as well as metal façade element

Bundesstadt Bonn, Referat Vergabedienste | Published December 1, 2016  -  Deadline January 11, 2017

Structures and parts of structures

Deutsche Stiftung Denkmalschutz | Published November 23, 2016  -  Deadline January 18, 2017

Bridge as glazed steel structure between the constituent components and Bt.F Bt.N.

Bridge as a steel structure between existing components, on the 1st floor, on one level, about L 7.00 / B 2.75, steel and glass facade, curved standing seam, partial installation.

Glazing work

Deutsche Stiftung Denkmalschutz | Published November 22, 2016  -  Deadline December 21, 2016

Aluminum windows Construction Bt.N.

Aluminum window construction, glass balustrades.

Load-bearing structure design services

Zoologisches Forschungsmuseum Alexander Koenig – Leibniz-Institut für Biodiversität der Tiere – Stiftung des öffentlichen Rechts | Published November 5, 2016  -  Deadline December 5, 2016
Planning services of structural design for the extension of the Zoological Research Museum Alexander Koenig to summarize and expansion of various facilities.

New education center Structural engineering

Universitätsklinkum Bonn | Published November 10, 2016  -  Deadline December 12, 2016

Roofing and trapezoidal sheet metal work -. St. Peter topping 5 CD

Gemeinschaftskrankenhaus Bonn St. Elisabeth - St. Petrus - St. Johannes gGmbH | Published November 4, 2016  -  Deadline December 6, 2016
900 m²: Flachdacheindichtung as warm roof, foil seal with MF. Slope insulation and attic training 210 m²: trapezoidal sheet metal roof on steel construction 240 m²: Isorock panel walls Services Station 500 m²: sealing faces during construction and their maintenance

Paving and asphalting works

Gemeinschaftskrankenhaus Bonn St. Elisabeth – St. Petrus – St. Johannes gGmbH | Published November 19, 2016  -  Deadline December 20, 2016

The size of the total program comprises approximately 500 m 2 ,

It concerns with the advertised work primarily to demolition and dismantling work, as well as the construction of new asphalt surfaces as Feuerwehrumfahrt.

Bonn - structural work - Federal Ministry for the Environment, Nature Conservation, Building and Nuclear Safety in Bonn - award no. 5078/16

Bundesamt für Bauwesen und Raumordnung, Deichmanns Aue 31-37, 53179 Bonn in Vertretung des BMUB | Published November 2, 2016
There is an intention to Restricted procedure in accordance with § 19 VOB / A.

Screed works

Universitätsklinikum Bonn | Published November 11, 2016  -  Deadline December 15, 2016

The University of Bonn (UKB) plant in the western region, south of Hematology, on the Venusberg to build a new headquarters Sterilgutversorgungsanlage. The new CSSD is required to ensure a sufficient supply of the hospital operation. A main objective of the new CSSD is to centralize the sterile supply and thus z. B. to improve operations. During the construction of a solution for the implementation of optimal operating procedures and in particular a reduction in the follow-up costs to be found.

With the construction of the CSSD therefore the gradual dissolution of the currently existing decentralized sterilization units connected (current main facility in Surgical Center). The centralization of sterile services is a core component of the master plan for the structural and functional development of the UKB until 2020.

It is planned to place the power of communications technology in the course of an open tender.

Screed works for the new CSSD.

Electrical machinery, apparatus, equipment and consumables; lighting

Universitätsklinikum Bonn | Published November 11, 2016  -  Deadline December 9, 2016

The University of Bonn (UKB) plant in the western region, south of Hematology, on the Venusberg to build a new headquarters Sterilgutversorgungsanlage. The new CSSD is required to ensure a sufficient supply of the hospital operation. A main objective of the new CSSD is to centralize the sterile supply and thus z. B. to improve operations. During the construction of a solution for the implementation of optimal operating procedures and in particular a reduction in the follow-up costs to be found.

With the construction of the CSSD therefore the gradual dissolution of the currently existing decentralized sterilization units connected (current main facility in Surgical Center). The centralization of sterile services is a core component of the master plan for the structural and functional development of the UKB until 2020.

It is intended to award the performance of the fire alarm system in the course of an open tender.

Fire detection technology for the new CSSD.

Sanitary fixture installation work

Universitätsklinikum Bonn | Published November 12, 2016  -  Deadline December 13, 2016

The University of Bonn (UKB) plant in the western region, south of Hematology, on the Venusberg to build a new headquarters Sterilgutversorgungsanlage. The new CSSD is required to ensure a sufficient supply of the hospital operation. A main objective of the new CSSD is to centralize the sterile supply and thus z. B. to improve operations. During the construction of a solution for the implementation of optimal operating procedures and in particular a reduction in the follow-up costs to be found.

With the construction of the CSSD therefore the gradual dissolution of the currently existing decentralized sterilization units connected (current main facility in Surgical Center). The centralization of sterile services is a core component of the master plan for the structural and functional development of the UKB until 2020.

It is intended to award the performance of the sanitary system in the course of an open tender.

Sanitary facilities for the new CSSD.

Business development consultancy services

Bundesministerium für Wirtschaft und Energie | Published November 19, 2016  -  Deadline December 20, 2016

The coordinated design of the digital structural change in the industry in terms of lightweight construction in Germany is to be a central task office lightweight (GSL). As a national and international network node it is to support German companies, particularly SMEs, in the implementation of lightweight construction.

The office is for the base period 1.1.2017 - 31.12.2018 advertised and contains a dual extension option of 1 year to a total of 31.12.2020. The estimated value of the contract is between 150 000 EUR - 250 000 EUR Excluding VAT annually.. The estimates below the total contract value is based on an annual average of 200 000 EUR Excluding VAT. X 4 years Term (2 years base period + 2 x 1 year contract extension option).

See process description and listing conditions.