Call +44 800 9755 164

Public tenders for construction in Bielefeld Germany

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

Regionalniederlassung Ostwestfalen-Lippe | Published December 24, 2016  -  Deadline February 8, 2017
Construction km 4 + 750, including the expansion of 

Roundabout B 61 / L 860 / B 611 and the production of the connecting lines of the B 61, K 9 (Loherstraße) and K 12 (Dornberger Heide).

The tender is divided as follows:

Section 00 - construction route B 61 / B 611

Section 01 - rain retention basins Sudbachtal

Section 02 - rain retention basins Kabökenweg

Section 03 - rain retention basins In Arnholz.

The section 00 Road of the specifications advertised works include the following main benefits:

52,700 m 2 absorb asphalt and bituminous fortifications

182,200 m 3 perform 6 - earthworks in soil / rock classes 1/3 of

97,000 m 2 Floor / ground improvement perform

44,300 m 2 Lay geotextile and geotextile drainage mats

produce 10,600 m trenches and wells

67,500 m 2 Making hydroseeding on topsoil

manufacture 200-14400 m Sickerstränge with Sickerrohrleitungen DN 100

38,130 m 3 produce frost protective layers of crushed natural stone 0/45

82,100 m 2 Making AC 32 TS - Asphalt base course AC 22 TL

53 650 m 2 Making AC 22 BS - asphalt binder AC 16 BS

51,750 m 2 manufacture asphalt overlays SMA 8 S

23,200 m 2 Making AC 11 DN - asphalt surfacing AC 8 DS

9,000 m 2 manufacture asphalt surfacing AC 5 DL

put 2,060 m Concrete curb

produce 2,270 m strip of concrete paving stones

embarrassed 800-4800 m Concrete / reinforced concrete pipes DN 300

91 St precast manholes You 1000 - produced in 1200

produce 58 m angle retaining wall made of reinforced concrete prefabricated parts

lay 100 m reinforced concrete frame profiles as amphibians passages

produce 1,365 m Amphibienleiteinrichtungen

2,000m manufacture Game fencing

embarrassed 1,800 m cable conduits for traffic lights

Making 26 St Cable junction boxes for traffic lights

3 rainwater retention systems:

The competitions listed in section 01 of the bill of works include the following main benefits:

4,400 m 3 perform 5 - Excavation in soil classes 1/3 of

400 m 2 Floor / ground improvement perform

embarrassed 600-68 m pipes DN 400

Making 1200-4 St precast manholes DU 1000

Making 1 St flow structure with shut-off / throttle slide

Making 1 St baffle with floats

320 m 3 produce frost blanket of crushed natural rock 0/45

495 m 2 Lay concrete and armor stone paving

700 m 2 manufacture asphalt wearing course AC 16 TD

Making 165 m steel mesh fence with gates

The competitions listed in Section 02 of the bill of works include the following main benefits:

4,320 m 3 perform 5 - Excavation in soil classes 1/3 of

300 m 2 Floor / ground improvement perform

embarrassed 600-67 m pipes DN 400

Making 1200-4 St precast manholes DU 1000

Making 1 St flow structure with shut-off / throttle slide

Making 1 St baffle with floats

400 m 3 produce frost blanket of crushed natural rock 0/45

470 m 2 Lay concrete and armor stone paving

900 m 2 manufacture asphalt wearing course AC 16 TD

Making 190 m steel mesh fence with gates

The competitions listed in section 03 of the bill of works include the following main benefits:

4,820 m 3 perform 5 - Excavation in soil / rock classes 1/3 of

200 m 2 Floor / ground improvement perform

embarrassed 1200-90 m pipes DN 400

Making 1 St precast manhole DU 1000

Making 1 St flow structure with shut-off / throttle slide

Making 1 St baffle with floats

320 m 3 produce frost blanket of crushed natural rock 0/45

390 m 2 Lay concrete and armor stone paving

700 m 2 manufacture asphalt wearing course AC 16 TD

Making 185 m steel mesh fence with gates.

Laboratory building construction work

Innovationszentrum Campus Bielefeld GmbH | Published January 18, 2017  -  Deadline February 20, 2017

Subject of the contract to be awarded, the conveying technical equipment for the establishment of the "Innovation Centre Campus Bielefeld": 1 piece elevator BTB, 1 piece elevator BTC, 1 piece elevator BTZ establishing the Innovation Centre.

I. The Innovation Centre Campus Bielefeld GmbH is planning the construction of the "Innovation Centre Campus Bielefeld" in close proximity to the university and Fachhochschule Bielefeld. Profile Imaging priorities for the center are the fields of technology "Intelligent Technical Systems" and "Molecular and Nanosciences". The innovation center will be aimed at the market segment I to already market established businesses that want to meet their space requirements for the expansion of the company. By market segment II, the center covers the need for university-related facilities of parent companies that are located in the concept, start or initial development phase, from. This part of the project is supported by funding from the state of NRW and the federal government.

II. Subject of the contract to be awarded, the conveying technical equipment: 1 piece elevator BTB 630 kg, 1 piece elevator BTC 630 kg, 1 piece elevator BTZ 1000 kg establishing the Innovation Centre.

Construction work

Regionalniederlassung Ostwestfalen-Lippe | Published December 20, 2016  -  Deadline February 7, 2017

The works mainly comprise the installation of an asphalt layer of porous asphalt in the BAB 30 Nordumgehung of Bad Oeynhausen. In addition, several more Böschungsrutschungen to redevelop, a Bodenanfüllung is dismantled and establish a residential street with a water-bound ceiling.

Approximately 133 000 m 2 Asphalt surface PA 8

290 T Gussasphalt MA 5 S

ablate approximately 1 600 m³ embankment slip

about 1 500 m³ building materials 0/63

Clean approximately 24 000 m of drainage pipe

approximately 11 000m 3 Dispose of hazardous waste.

Construction work

Bau- und Liegenschaftsbetrieb NRW Bielefeld | Published January 20, 2017  -  Deadline February 9, 2017

Installation of plastic windows for the new factory building HIL - Building 422 in the GFM - Field Marshal Rommel Barracks Augustdorf.

Installation of plastic windows:

4 pieces venetian blind single facility;

14 piece blind U-aperture;

18 pieces of plastic windows;

31 m outdoor windowsills extruded profile;

12 piece interior window sills HPL.

Framework of agreements on civil engineering works for the structural maintenance of the urban canal network

Stadt Bielefeld - Amt für Personal, Organisation und Zentrale Leistungen - 110.41 | Published January 20, 2017  -  Deadline February 13, 2017
  • 1