Call +44 800 9755 164

Public tenders for construction in Bielefeld Germany

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Architectural, construction, engineering and inspection services

BLB NRW Bielefeld | Published February 17, 2017
cpvs
71000000, 71240000

Architectural, construction, engineering and inspection services

Laboratory building construction work

Innovationszentrum Campus Bielefeld GmbH | Published February 25, 2017  -  Deadline March 29, 2017
cpvs
45214610

Subject of the contract to be awarded are the high and medium voltage equipment for the establishment of the "Innovation Centre Campus Bielefeld":

I. The Innovation Centre Campus Bielefeld GmbH is planning the construction of the "Innovation Centre Campus Bielefeld" in close proximity to the university and Fachhochschule Bielefeld. Profile Imaging priorities for the center are the fields of technology "Intelligent Technical Systems" and "Molecular and Nanosciences". The innovation center will be aimed at the market segment I to already market established businesses that want to meet their space requirements for the expansion of the company. By market segment II, the center covers the need for university-related facilities of parent companies that are located in the concept, start or initial development phase, from. This part of the project is supported by funding from the state of NRW and the federal government.

II. Subject of the contract to be awarded are the high and medium voltage equipment for the new "Innovation Center Campus Bielefeld" as follows: system components in the building in the basement: 2 pieces dry transformers 1000 kVA, 1 piece 10 KV medium voltage system, about 15 m 2 Double bottom.

Bridge construction work

Regionalniederlassung Ostwestfalen-Lippe | Published January 27, 2017  -  Deadline March 23, 2017
cpvs
45221110

These are the building 5, bridge over the Wierborner Avenue, in construction-km + 1 822 091 and to the structure 6, the bridge over the Wierborner Aue, between construction km 1 + 959,00 and 2 074,00 + of bypass Barntrup. 

The advertised in the bill works include the following main benefits:

bypass:

150 m 3 Topsoil erode, dispose;

325 m 3 Loosen soil, load, dispose of;

Making 120 m road ditch;

200 m 3 Crushed stone base 0/45;

500 m 2 Asphalt base of AC 32 TN;

450 m 2 Asphalt surface of AC 11 DS;

200 m banquet prepared.

Infrastructures:

450 m 2 deforested forest land clearing;

150 m 3 erode topsoil, loading, transport, wiedereinb .;

450 m 2 Geotextile signature;

225 t subsoil improvement 0/45;

1800 m 2 Chips, d = 10 cm, semi-annually each 450 m 2 ;

300 m 2 Dismantling of the way to completion of BW6;

75 m 3 Topsoil andecken;

150 m 2 record gravel base layer disposed;

150 m 2 producing crushed stone base.

Structure 5:

360 m 3 record topsoil, dispose;

Record Rock, dispose;

Soil supply, install;

provide ground einb .;

410 m 3 Making reinforced concrete for substructures C30 / 37;

160 m 3 Reinforced concrete superstructure for C35 / 45 produced;

21 m 3 Making reinforced concrete cap C25 / 30;

87 t reinforcing steel for substructures and superstructures signature;

Making shoring;

- Installing 62 m steel railings;

200 m 2 Superstructure seal.

Structure 6:

100 m 3 record topsoil, dispose;

Record field, discard;

Soil supply, install;

1 000 meters 3 Backfilling, deliver cohesive material, einb .;

provide ground einb .;

750 m 3 Making reinforced concrete for substructures C30 / 37;

1020 m 3 Reinforced concrete superstructure for C35 / 45 produced;

127 m 3 Making reinforced concrete cap C25 / 30;

310 t reinforcing steel for substructures and superstructures signature;

40 t installing prestressing steel;

Making shoring;

Install post for guide;

1 370 m 2 Superstructure seal.

Construction work

Bau- und Liegenschaftsbetrieb NRW Bielefeld | Published February 14, 2017  -  Deadline March 2, 2017
cpvs
45000000, 45431000, 45431100, 45431200

Tile works for the new factory building HIL - Building 422 in the GFM - Field Marshal Rommel Barracks Augustdorf.

Tiling:

Screed about 28 m 2 ;

Interior plaster PII about 152 m 2 ;

Floor Tiles 35 m 2 ;

Wall tiles 90 m 2 ,

Laboratory building construction work

Innovationszentrum Campus Bielefeld GmbH | Published February 10, 2017  -  Deadline March 14, 2017
cpvs
45214610

300 m, Appendix. / Kanalm. 5 Comp. distributed, 

Flow control systems w ith networking / connectivity via BACnetIP for about 32 laboratories, each with a fume hood, supply air of the exhaust air volume adjusted variably,

Datapoints approx .: BT A / B 680 St., BT C / D 400 St., BT UG / VG 115 St, BT Z: 180 St.

This part of the project is supported by funding from the state of NRW and the federal government.

The equipment and channel materials mentioned above are distributed / installed on 5 components.

Self-sufficient working laboratory ventilation system for variable volume flow control systems with networking / connectivity via BACnetIP for about 32 laboratories, each with a fume hood, the supply air of the exhaust air volume is adjusted variably,

180 St.

Engineering services

Landesbetrieb Straßenbau NRW, Regionalniederlassung Ostwestfalen-Lippe | Published February 4, 2017  -  Deadline March 2, 2017
cpvs
71300000

The road project includes the 2 lane new construction of the B 611 between wages-Witten and Vlotho-Exter as 2nd phase.

The new building begins north of currently provisional CIP at the node with the L 860 and binds to the coming from the motorway interchange wages to the A 30, four-lane B 61st

During the construction of 3 flyovers, 3 rainwater treatment plants and 6 noise barriers are manufactured.

During the construction of the B 611 from Vlotho / Exter to wages / Witten on 2nd BA to the

(1) construction management;

(2) Supervision, and

(3) final audit will be awarded.