Call +44 800 9755 164

Public tenders for construction in Berlin Germany

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Road construction works

DEGES Deutsche Einheit Fernstraßenplanungs- und -bau GmbH | Published November 19, 2016
Road construction

Carpentry and timber construction

Förderverein Schulemachen e.V. | Published November 17, 2016  -  Deadline January 9, 2017
Carpentry and timber construction

Painting - Construction of a daycare

Dr. Klaus Beyer GmbH | Published November 7, 2016
Painting - Construction of a daycare

Construction work for highways, roads

Senatsverwaltung für Stadtentwicklung und Umwelt – X E - | Published July 29, 2016  -  Deadline December 13, 2016
Construction work for highways, roads

Construction-site supervision services

DB Engineering & Consulting GmbH (Bukr R0) | Published November 19, 2016  -  Deadline December 16, 2016

Construction node hall, basic renovation slab track Halle-Bitterfeld; Construction supervision services superstructure and structural engineering - Slab track construction on the track 6132 Bitterfeld - Halle section Hohenthurm (Hp) - Peißen from km 150.900 to km 155.600 in the period from 27/12/2016 to 17/04/2017 (start track 1; commissioning Track 2 am 05.18.2017).

With construction contracts / professional monitoring during construction of engineering structures / traffic infrastructure - Bauüberwacher railway superstructures / constructive Ing.-Bau.

With construction contracts / professional monitoring during construction of engineering structures / traffic infrastructure - Chief Construction Supervisor Track superstructure / constructive Ing.-Bau.

Construction work

DEGES Deutsche Einheit Fernstraßenplanungs- und -bau GmbH | Published November 11, 2016  -  Deadline December 14, 2016

Irritation protection walls and overflight aids BA 1.1 to 1.3

A44 AS Waldkappel (o) - AS Ringgau (m).

Construction of irritation barriers (H = 4 m) and flyover help (H = 5 m), incl. Start-ups

(Establishing the irritation bulkheads and overflight aids in the building area on shallow foundations established with applied quivers in dam areas in situ concrete piles or anchoring on the caps of bridge building according RIZ LS1 with anchor structures)

with the following main materials:

about 1 460 m situ concrete reinforced concrete L = 3-6 m;

about 1 200 meters 2 Wall socket reinforced concrete (concrete);

ca. 945 m 2 Supply and install wall panels aluminum;

about 4 540 m 2 Supply and install wall panels reinforced concrete;

about 1 890 m 2 Wall panels aluminum color coating RAL;

approximately 9 100m 2 Wall panels reinforced concrete coating color RAL;

about 100 tons. Post made of profile steel HEM 180;

about 15 tons. Post made of profile steel HEM 160;

approximately 65 tonnes. Post made of profile steel HEM 200th

Construction work for bridges

DEGES Deutsche Einheit Fernstraßenplanungs- und -bau GmbH | Published November 4, 2016  -  Deadline December 7, 2016
Replacement construction bridge demolition inventory building, detailed design,

Construction work for bridges

DEGES Deutsche Einheit Fernstraßenplanungs- und -bau GmbH | Published November 8, 2016  -  Deadline December 7, 2016
Replacement construction Viaduct Volmarstein incl. Adjustment range, A1.

Framework agreement of metal construction and fitting work

Berliner Stadtreinigungsbetriebe | Published November 10, 2016
Framework agreement of metal construction and fitting work

Framework agreement highway, underground and pipeline construction

Berliner Stadtreinigungsbetriebe | Published November 10, 2016
Framework agreement highway, underground and pipeline construction

Construction work for university buildings

Senatsverwaltung für Stadtentwicklung und Umwelt | Published November 18, 2016  -  Deadline January 26, 2017
The hook-up to the stock system Andover is possible with the fabrikat neutral BACnet protocol standard ISO 16484-5. 

Scope and further information: see II.2.4).

inventory:

589 St physical data points;

113 St communicating data points;

5 St centralized information centers;

30 St counter (M-Bus);

85 St motorized fire dampers;

2 St HVAC systems;

1 St district heating transfer station (self-sufficient);

1 St district cooling transfer station (self-sufficient, building 1);

5 St heating circuits;

2 St individual room control (meeting rooms);

15 000 m cables and wires;

150 m routes (within technology areas).

Furthermore, the central technology is on the 3rd floor, the room air conditioning systems, and in the basement, for providing heat by means of heat transfer station (self-sufficient) and heating circuit.

New construction:

1967 St physical data points;

494 St communicating data points;

Cabinet for FFU's;

16 St decentralized information centers (spread over the plains);

10 St counter (M-Bus);

30 St motorized fire dampers;

3 St HVAC systems;

5 St smoke extraction;

7 St refrigeration circuits;

54 St individual room control (conference foyer, independent laboratory controller switched on decentralized information centers);

55 000 m cables and wires;

900 m routes (both inside and outside technical areas).

All smoke exhaust fans located on the roof of the plant room (2nd floor).

Indication to the individual periods - see tender documents, form V 214.HF:

Execution periods: (Exp = expected, AT = working days.)

W + M-planning:

04/17) within total 40AT.

New construction:

07/17) within total 15AT;

10/17) within total 40AT;

02/18) within total 40AT;

05/18) within total 20AT;

06/18) within total 20AT.

inventory:

04/18) within total 20AT;

12/17) within total 40AT;

06/18) within total 15AT;

08/18) within total 15AT.

Commissioning TGA total:

08/18) within total 50AT;

10/18) within total 30AT;

12/18) within total 20AT.

Commissioning Lab equipment:

12/18) within total 15AT;

01/19) within total 25AT.

Construction work for houses

Gesobau AG | Published November 11, 2016  -  Deadline December 12, 2016

Subsection: Advanced Carcass work for the construction of a residential building

In Berlin-Pankow is in the grounds Langhansstraße 27b, 28, 29, a part a cellar, six-storey residential building with 37 residential units and 13 commercial units on the ground floor and 1st floor built. The building is to be constructed as a block border closure between the five-storey, basement neighboring buildings (no. 27a and Roelckestraße no. 10). In addition, in the rear courtyard a two-story community center and an enclosure for garbage and bikes will be built.

Building parts / Sunrises: 3 sunrises

Number of floors: 4/5

Building height: Eaves (s) 16.51 / 19.22 m

Number of apartments: 37

Number of commercial units: 13

m . 2 Site area: approximately 3 343 m 2

Subsection: Advanced structural work:

- Site equipment;

- About 3 200 m³ excavation and backfilling operations;

- Approximately 2500 m² Protective scaffolding;

- About 380 m³ floor panels waterproof concrete;

- Approximately 370 m² waterproof concrete walls;

- About 4 800 m² of tr-ceiling;

- Approximately 2100 m² reinforced concrete walls;

- 50 m ground installation;

- About 6 St. balconies (tr-finished parts);

- Approximately 2 double flight of stairs with landing (tr-finished parts);

- About 5 St. cellar light shafts / basement windows;

- 150 m² masonry work calcareous sandstone (exterior walls, interior walls);

- Approximately 1500 m² Insulation works (flooring, skirting, partly basement, plate and slab edges.);

- Approximately 100 m² sealing work (base, basement);

- Approximately 1600 m² Fassadendämmarbeiten as EIFS top coat plaster;

- 900 m² Fassadendämmarbeiten as EIFS top covering strap.

Concrete and construction - procurement no. 5303/2016

Bundesamt für Bauwesen und Raumordnung, Straße des 17. Juni 112, 10623 Berlin - Tel. 030/18 401-0, Fax: 030/18 401-8450, Elke.Swade@bbr.bund.de | Published November 23, 2016  -  Deadline December 20, 2016
There is an intention to Restricted Ausschreibungnach VOB. Federal Ministry of Finance, Wilhelmstr. 97, 10117 Berlin Bauunterhalt - Detlev Rohwedder Building concrete and construction - Goals Ehrenhof

Carpentry and timber construction - procurement no. 5225/2016

Bundesamt für Bauwesen und Raumordnung, Straße des 17. Juni 112, 10623 Berlin - Tel. 030/18 401-0, Fax: 030/18 401-8450, Elke.Swade@bbr.bund.de | Published November 15, 2016  -  Deadline December 7, 2016
There is an intention to Restricted Ausschreibungnach VOB. Daycare in Berlin Gatow Country City, Rex-Waite-Str. 94, 14089 Berlin Bauunterhalt Kita III Carpentry and timber construction

Construction work for buildings relating to railway transport

DB Station&Service AG (Bukr 11) | Published November 19, 2016  -  Deadline December 21, 2016

Demolition central platform, platform roof / New central platform with a platform edge Eq. 2 / New construction platform Eq. 1 / New direction platform roofs Eq. 1 & 2 incl. Lighting and sound system / installation prev Blind signage / New lighting and sound systems / extension. Pedestrian underpass / New ramp system GI. 1 / New construction elevators. Eq. 1 & 2j New stairways.

Lot 1 - LV Title:

01. MHRK_Lph 8_Bauleistung_Bahnsteige / BUF including AP.

03. MHRK_ Bauleistungen_ OLA outer platform;

04. MHRK_ Bauleistungen_ OLA island platform;

05. MHRK_ Bauleistung_ LST plants;

06 points heating.

Lot 2 - LV Title:

02. MHRK_ Bauleistung_ platform roof incl. AP.

Construction work

Senatsverwaltung für Stadtentwicklung und Umwelt | Published November 9, 2016  -  Deadline December 7, 2016
The upgrading of the steel support structure comprises mainly spot to be welded additions of flat steel. Before mounting the upgrading work, the roof structure is non-load increase. The Heavy metal-containing paint is removed in the area of ​​work areas in advance by a foreign trade union. Selective Rework for joint preparation to be executed by the bidder. Due to the filigree roof supporting structure and the basis of age expected imperfections of the structure is to be assumed that local adaptations are necessary. The work will take place indoors.

Construction work

Charité-Universitätsmedizin Berlin, GB Technik und Betriebe | Published November 9, 2016
Subject of this market research are the works of rehabilitation.

Construction work

Gesobau AG | Published November 8, 2016  -  Deadline December 12, 2016
Subsection: painting and flooring work:

Primary school construction work

Senatsverwaltung für Stadtentwicklung und Umwelt | Published November 16, 2016  -  Deadline December 13, 2016

Build a new for a primary school, including a gymnasium and a

small appliances in the house biesdorf. The newly constructed school building is 3 storeys and well

like the gymnasium without a basement.

Approximately 2000 m² drywall;

some 4 300 m² drywall ceilings;

about 1 000 sqm suspended ceiling made of expanded metal boards;

700 m² dry lining systems.

Construction work for university buildings

Senatsverwaltung für Stadtentwicklung und Umwelt | Published November 4, 2016  -  Deadline December 6, 2016
1 St. pneumatic double production Complete system with storage, control, 2 x 1.7 m  3  /H;