Call +44 800 9755 164

Public tenders for construction in...

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!
ConstructionGermanybad-neustadt-an-der-saale

Steel construction work Fleherstraße

Landeshauptstadt Düsseldorf, Der Oberbürgermeister, Rechtsamt - Submissionsstelle | Published April 24, 2017  -  Deadline May 17, 2017
cpvs
45421132

Steel construction work

Road construction works

Stadt Neuburg a. d. Donau | Published April 11, 2017  -  Deadline May 16, 2017
cpvs
45233120, 34928230

Awarding Body: City Neuburg; Action: B 16 height-free connection South Park Neuburg.

Significant masses contract section 1 road Eternitweg, BA I:

2700 m;

1200 m;

2900 m;

1300 m;

70 m;

Significant masses contract section 2 noise barriers Eternitweg, BA I:

88 m.

Total measure:

The plan is to be implemented by a height-free hub.

For this reason, the city Neuburg intended as Vorhabens- and construction authorities the expansion of Eternit path at a release for general use.

Contract Section 1: Staßenbau Eternitweg, BA I:

expanded 300 m and receives, designed for the use claims a main road in commercial areas and compliant width of 6.50 m to 06 RASt Table 7 below.

The banquet is formed with a width of 0.75 m and produced with gravel turf.

On the opposite, in the south edge of the carriageway which is also deposited by a granite large paving line, street accompanying walkway includes ( "cyclists free") in a width of 2.50 m on.

It is envisaged this to produce by the road-related retaining wall, with L-shaped precast concrete parts.

Total measure:

The plan is to be implemented by a height-free hub.

In this context, the construction of noise barriers along the existing buildings will be required.

Contract Section 2: Noise barriers Eternitweg, BA I:

Along the path Eternit wood noise protection walls are partially built with glass elements at a height of 2.50 m on a total length of 88 m.

This is to absorbent wood protection walls (noise level 24 dB (A)).

The foundation consists medium piles.

This is interrupted in areas of access roads.

Construction work

Staatliches Baumanagement Osnabrück-Emsland | Published April 13, 2017  -  Deadline May 3, 2017
cpvs
45000000

Metal construction, doors and windows.

- Interior elements with fire and smoke protection requirements 20 pc;

- Front window elements;

- Outdoor facade as RR construction with door elements 250 m 2 ;

- Sun protection systems as a disk about 180 m 2 ;

- fire curtains 40 m 2 ,

Structural steel erection work for structures

Landkreis Neustadt an der Waldnaab | Published March 31, 2017  -  Deadline May 2, 2017
cpvs
45262420, 45262400

Prefixed escape stairway with escape balcony

Steel roof construction

Inside railing posts

Steel stair construction

Scope:

Supply and inputs and construction of a steel structure with escape balcony and 2 escapes. Metal roof, railing posts, internal steel staircase construction.

Prefixed escape stairway with escape balcony, steel roof construction, interior railing posts, steel stair construction

Scope: supply and inputs and construction of a steel structure with escape balcony and 2 escapes. Metal roof, railing posts, internal steel staircase construction.

Bad Urach, SM StP Bad Urach, construction of a vehicle depot, Metal and steel construction

Staatliches Hochbauamt Reutlingen | Published April 6, 2017  -  Deadline May 9, 2017
cpvs

Bad Urach, SM StP Bad Urach, construction of a vehicle depot, Metal and steel construction

Stahlbauarbeiten School Neustadt / WN

Landkreis Neustadt a. d. Waldnaab | Published March 30, 2017  -  Deadline May 2, 2017
cpvs

Prefixed escape staircase with escape balcony railing post steel roof inner steel staircase construction Scope: supply and inputs and construction of a steel structure with escape balcony and 2 escapes. Metal roof, railing posts, internal steel stair construction

Scaffolding

Landkreis Neustadt an der Waldnaab | Published March 31, 2017  -  Deadline May 2, 2017
cpvs
44212310, 44212317, 45262100

Facade scaffolding, birdcage scaffolding.

Scope:

Construction and provision of all the facade scaffolding and scaffolding space indoors.

Facade scaffolding and space frames / construction and provision of all the facade scaffolding and scaffolding space indoors.

Screed work Expansion Landratsamt Neustadt / WN

Landkreis Neustadt a. d. Waldnaab | Published April 24, 2017  -  Deadline May 9, 2017
cpvs

Screed work for the new construction of the 4-storey expansion building of the Landratsamtes Neustadt ad WaldnaabNew construction of the 4-storey extension building of the Landratsamtes Neustadt ad Waldnaab as administrative building on a hillside, U-shaped building up to 3 floors integrated into the slope.

Marker n. 2017 LK construction Mr u Gi (VG-0529-2017-0011)

Hessen Mobil Marburg | Published April 7, 2017  -  Deadline May 17, 2017
cpvs

Type of service mark for construction LK MR and pouring 2017 circumference of the performance about 12000m agglomerate, about 40000m color marking, about 4000m hot plastic marker

Construction works for saunas

Bayerisches Staatsbad Bad Steben GmbH | Published April 15, 2017  -  Deadline May 30, 2017
cpvs
45211370, 45212212, 98334000

The Therme Bad Steben expanded its sauna offer.

It will be built in new buildings on site created a steam room with anteroom and shower area and a sauna fingers.

All equipment must be operated in accordance for use with biodegradable oils and bio diesel.

steam bath

Embodiment than caldarium (hot water heating floors, benches and walls)

partitions:

- glass printed or etched, vapor-tight foil composite,

both sides reinforced walls are made of extruded rigid polystyrene foam with glass fiber fabric and coated with mortar kunststoffvergütetem -

Seal:

Full-surface sealing in conjunction

surface materials

- walls, floor: tiles in large formats,

- Walls: Glass ceiling-high as backlighting,

- Ceiling: suspended ceiling with plaster or aluminum ceiling

Have a shower:

- customer provided faucets, shower heads installed,

- Install customer provided gutters and drains.

Piping performance on the design TO

complete media supply as a picture and as Tondarbietung ceremony

full electric supply from the transfer point equipment room

complete venting steam room hallway from the transfer point supply and exhaust

4 m 2

Fingers Sauna with anteroom

sauna

Execution of the high-temperature sauna as interior design in new construction site asked shell of reinforced concrete.

Construction wood with three-tiered sauna benches, wide enough to serve as plateaus.

Sauna heater with infusion stones

Three sides insulated with wood wall construction, one side fully glazed to the exterior

55 m 2

43 m 2

43 m 2

Wood

through large glass windows 5.70 x 2.50 m

30 m 2

1.20 x 0.70 m

and under- or Hinterbanköfen

Control of the media

43 m 2

4.5 m 2 with equipment sauna and coat hooks

All equipment must be operated in accordance for use with biodegradable oils and bio diesel.

Construction work for school buildings

Stadt Biberach, Hochbauamt | Published March 31, 2017  -  Deadline May 4, 2017
cpvs
45214200

Trockenbauarbeiten, painting and cleaning, exterior painting works inside, Estricharbeiten, tile installation, toilet partitions.

Water-treatment plant construction work

Bayerisches Staatsbad Bad Steben GmbH | Published April 20, 2017  -  Deadline May 24, 2017
cpvs
45252120, 43324100, 39330000, 44162000, 45231300

There are Badewasswertechnikanlagen to provide for the construction of the swimming pool in Bad Steben and install. The work will take place in a spa sanctuary. All equipment must be operated in accordance for use with biodegradable oils and bio diesel.

There are Badewasswertechnikanlagen to provide for the construction of the swimming pool in Bad Steben and install. Main dimensions:

- 3 pcs. Ultrafiltration systems, power from 30 to 270 m 3 /H;

- 10 pcs. The circulation and attraction pumps, pool water resistant, power from 30 to 270 m 3 /H;

- 50 pcs. Flaps, bathing water resistant with manual or pneumatic drive, DN 100- 300;

- 900m pipes PE HD welded DN 100- 300;

- chlorine gas disinfection system with metering 4;

- 2 pcs. Switchgear with 800 data points.

The work will take place in a spa sanctuary. All equipment must be operated in accordance for use with biodegradable oils and bio diesel.

Construction work

BKK Akademie GmbH | Published April 24, 2017  -  Deadline May 24, 2017
cpvs

Construction operator - excavators, wheel loaders, chain unit

KarrCBw Magdeburg - BFD | Published March 3, 2017  -  Deadline May 2, 2017
cpvs

Participants (temporary soldiers) obtain the necessary knowledge and skills to acquire the construction equipment operator's license (excavators, wheel loaders, chain device) vermittelt.Die training has to be done in theory and practice according to the guidelines of the professional association.

Construction work

Staatliches Baumanagement Osnabrück-Emsland | Published April 15, 2017  -  Deadline May 9, 2017
cpvs
45000000

Tile installation.

- floor tiles various formats and non-slip classes.

900 m²;

- wall tiles various formats, some with floor-to about 1 500 m²...

Construction and turnkey supply of Verkehrssicherungsprähmen (open barges)

Wasserstraßen- und Schifffahrtsamt Koblenz | Published April 7, 2017  -  Deadline June 1, 2017
cpvs
34500000, 34500000, 34500000, 34500000

Construction work for power plant

EVH GmbH | Published April 8, 2017  -  Deadline May 4, 2017
cpvs
45251100, 42112300

The EVH GmbH operates in Halle Dieselstraße a power plant, which of the two systems:

- heating (heat-generating system for the generation of district heat with two hot water boilers (HWK1 and 2) and three steam generators (DE 2 - 4) and

- CCPP (cogeneration system for generating electricity and district heating, consisting of 2 blocks, each with a gas turbine, a waste heat boiler with supplemental firing and a steam turbine is (Block A and B).

The EVH GmbH intends to exercise and expansion of the combined cycle plant. is upgraded, the upgraded in 2005 combined cycle system with two identical combined cycle blocks (blocks A and B) with district heating, an electrical power of 47 MW and a district heating power of 55 MW per block as well as a district heating memory with a storage capacity of 280 MWh. The existing combined cycle power plant is extended by a block C with an electric power of about 50 MW.

The gas turbine generator package for the block C should have the following characteristics:

- Electrical Power 40 - 60 MW,

- black start and island capable

- suitable for primary control,

- start time of start command to full load of max. 7 minutes.

The sound emissions at the location must be kept as low as possible, that there are noise-reducing measures, for example by reducing the entry pressure losses, that is, by the construction of a filter house enlarged or increased air channel cross-section to provide.

The firing of the gas turbine systems is carried out exclusively on natural gas. In terms of emissions, the limit values ​​of the 13th BImSchV currently binding.

Bad Urach, SM StP Bad Urach, construction of a vehicle depot, electrical installations

Staatliches Hochbauamt Reutlingen | Published April 12, 2017  -  Deadline May 16, 2017
cpvs

Bad Urach, SM StP Bad Urach, construction of a vehicle depot, electrical installations

S6 1.Baustufe: 4-Gleisiger expansion Frankfurt West - Bad Vilbel, VP02: Preliminary measures cable construction

Deutsche Bahn AG FEI - Beschaffung Infrastruktur | Published April 26, 2017  -  Deadline May 18, 2017
cpvs

S6 1.Baustufe: 4-Gleisiger expansion Frankfurt West - Bad Vilbel, VP02: Preliminary measures cable construction

New Combined Kita in massive construction, Lot 13 lifts

wobra Wohnungsbaugesellschaft der Stadt Brandenburg an der Havel mbH | Published April 7, 2017  -  Deadline May 2, 2017
cpvs
45000000

Lot 13 - Elevators - 1 machine room-less elevator with cabin for wheelchair users with accompanying person access one-sided, 2 stops, lifting height 3.96 m, rated load 675 kg, 9 persons, cabin dimensions: width 1200 mm, depth 1400 mm, height 2150 mm - 1 Servicelift bilaterally with floor-hinged doors, access, 2 stops, lifting height 3.96 m, nominal load: 200 kg, cabin dimensions: width 1000 mm, depth 800 mm, height 1200 mm - elevator systems with on-site elevator shafts of concrete and gearless drives in the shaft head