Call +44 800 9755 164

Public tenders for construction in Amberg Germany

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

Klinikum St. Marien Amberg AdöR | Published December 17, 2016  -  Deadline January 23, 2017

St. Marien Amberg Hospital | 4. construction phase - trailing end measures

approx 13 pcs. (54.5 m 2 ) Textile fire curtains (30 min) with motorized closure, width of 0.99 m to 3.39 m in height from 1.45 m to 1.80 m.

St. Marien Amberg Hospital | 4. construction phase - trailing end measures.

Architectural, construction, engineering and inspection services

Staatl. Bauamt Amberg-Sulzbach | Published January 13, 2017

Rehabilitation, reconstruction and modernization of a historic building complex, consisting of three-wing former monastery, accommodation buildings and schools (about 5 000m 2 Land).

Creation of administrative and teaching rooms, kitchen, dining room, guest rooms with wet rooms and built-in furniture, etc.

Renovation of the entire building services supply and disposal (Electrical installations, heating, ventilation, plumbing).

Building design in accordance with HOAI Part 3, Section 1, and technical planning in accordance with HOAI Part 4, Section 1 and 2. FIG.

Architectural and related services

Stadt Amberg, Hochbauamt | Published January 17, 2017  -  Deadline February 14, 2017

The city Amberg plans to create an all-day school with a cafeteria at the Albert Schweitzer Elementary School in Amberg.

Here is to be implemented from the previous primary school officially recognized open all-day school.

996 m 2 Of floor space, which can be achieved in the portfolio by additional extensions and conversions.

The construction phases of the construction work is carried out during ongoing school operations and is provided in several phases.

Services of Objektplanung gem. § 34 HOAI, Stand 2013 LPH 1-9, with gradual commissioning, on the grounds of the Albert Schweitzer Elementary School in Amberg.

The following guidelines should be considered:

The construction phases of the construction work is carried out during ongoing school operations and is provided in several phases.

The Planning and building process is structured as follows:

2017:

Here is first an overall concept with a total planning and costing to obtain a recognized status Ganztagsschule create.

226 m² HNF):

August 2018 - JULY of 2019.

770 m² HNF):

Mid-2020 - mid-2022nd

2 sections:

Mid-2022 - mid 2026 (The appointment of BA3 is optional).

Social / Social aspects:

(See also II.1.4))

The existing building will also be accessible barrier-free part of the implementation of all-day school. (Lift).

Energy / sustainability:

When building to sustainable construction and raw materials (ecological and durable) and enhanced regenerative energies are used.

For the client comes in addition to a solid construction, a wooden construction for this project into consideration.

Design Aspects:

The extension is to be built Mensa erdgeschossig.

The extension Ganztagsschule will be built multi-storey.

Particular emphasis is placed on an architecturally attractive, low-maintenance and cost-effective, energy-optimized, and time quickly realizable solutions.

Promotions / investment / life cycle costs:

The building should be promoted according to the legal foundations of FAG Promotion (schools).

It is to be achieved the highest possible promotion.

The customer received a valuable total investment and careful planning, taking into account the expected life-cycle costs is expected.

Space program:

The space program must comply with the schulbaufsichtlichen approval.

Timeframe:

The award proceedings will probably take place in late April 2017th

Procurement is vorraussichtlich in June 2017 planning start directly afterwards.

The construction project is classified by the client in the fee zone III.

  • 1