Call +44 800 9755 164

Public tenders for construction in Amberg Germany

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Metal construction.

Landratsamt Amberg-Sulzbach | Published October 9, 2014  -  Deadline December 3, 2014
cpvs
45214230

Special Education Support Centre Sulzbach-Rosenberg, general renovation with replacement new construction, metal construction.

Road construction works

Staatl. Bauamt Amberg-Sulzbach | Published December 17, 2016
cpvs
45233120, 45221100

Road construction:

Approximately 2.8 km road

Bridge construction:

2 bridges

The other 3 members of the measure bridge structures are already in the construction phase.

Road construction:

Approximately 2.8 km road (single lane) with earthworks and drainage works.

Bridge construction:

2 bridges with earthworks and concrete work

- Road bridge with 260 m 2 ;

- Railway bridge 140 m 2 ,

Construction work for bridges

Staatl. Bauamt Amberg-Sulzbach | Published April 27, 2017
Winner
Eberhard Pöhner GmbH
cpvs
45221100

BW 0-1, Construction of a road crossing

BW 0-2, Construction of a railroad crossing in lateral position with transverse movement.

Construction work

Klinikum St. Marien Amberg AdöR | Published January 27, 2017  -  Deadline March 6, 2017
cpvs
45000000, 45431100, 45431200

St. Marien Amberg Hospital | 4. construction phase - trailing end measures:

- Laying of wall tiles about 55 m²;

- Laying floor tiles approximately 211 m²;

- Natural stone window sill about 10 m.

St. Marien Amberg Hospital | 4. construction phase - trailing end measures.

Construction work

Klinikum St. Marien Amberg AdöR | Published December 17, 2016  -  Deadline January 23, 2017
cpvs
45000000, 39515000, 44482000, 45343100

St. Marien Amberg Hospital | 4. construction phase - trailing end measures

approx 13 pcs. (54.5 m 2 ) Textile fire curtains (30 min) with motorized closure, width of 0.99 m to 3.39 m in height from 1.45 m to 1.80 m.

St. Marien Amberg Hospital | 4. construction phase - trailing end measures.

Workshops construction work

Jura-Werkstätten Amberg-Sulzbach e. V. | Published May 7, 2016
cpvs

Construction of garages

Special school construction work

Landratsamt Amberg-Sulzbach | Published November 17, 2016
Winner
Metallbau Vollmuth
cpvs
45214230

section:

Major overhaul of the special educational center;

Window construction BA III.

Special school construction work

Landratsamt Amberg-Sulzbach | Published November 15, 2016
Winner
Staufer Bau GmbH
cpvs
45214230

construction:

Major overhaul of Sonderpägagogischen Support Centre,

Baumeisterarbeiten BA III.

Special school construction work

Landratsamt Amberg-Sulzbach | Published July 22, 2015
Winner
Firma Metallbau Vollmuth
cpvs
45214230

Project: Major overhaul of the special educational center, metal construction / glazing work BA II.

Special school construction work

Landratsamt Amberg-Sulzbach | Published April 27, 2017
Winner
Firma Alfred Arbogast GmbH & Co. KG
cpvs
45214230

General restoration Special educational center;

Construction work BA III NB 2.

Secondary school construction work

Staatl. Bauamt Amberg-Sulzbach | Published April 26, 2017
cpvs
45214220

Max-Reger-Gymnasium Amberg

Renovation of the listed building and construction of a multi-purpose building.

Renovation of the listed building and construction of a multi-purpose building.

Total amount: approx. 4 500 m 2 BGF.

Renewal of roofing, windows, doors and flooring. Renewal of installations. Painting work indoors and outdoors.

Construction work for school buildings

Stadt Amberg, Hochbauamt, Steinhofgasse 2, 92224 Amberg | Published February 25, 2015  -  Deadline April 14, 2015
cpvs
45214200

Major overhaul Economic Sciences Amberg; VE 03 construction work.

B 85 Construction of a second carriageway

Staatl. Bauamt Amberg-Sulzbach | Published August 22, 2016
cpvs

B 85 Construction of a second carriageway

Construction work for buildings relating to health

Klinikum St. Marien Amberg | Published August 12, 2016
Winner
Schmitt & Sohn
cpvs

Construction work for buildings relating to health

Construction work for buildings relating to health

Klinikum St. Marien Amberg | Published July 16, 2016
cpvs
45215100, 45210000, 42512300, 39715000, 44621110, 45331231

Construction work for buildings relating to health

Special school construction work

LRA Amberg-Sulzbach | Published April 12, 2017  -  Deadline May 17, 2017
cpvs
45214230

Baumßnahme:

Major overhaul of the Special Educational Support Center

Facade cladding.

Main positions:

Externally suspended, back-ventilated facade covering of Laminates 570 m²;

or corrugated aluminum 70 m²;

visible fastening on aluminum

Under construction and

Thermal insulation of mineral wool 640 m²;

Facade additions to the previous 80 m²;

Phases in a plurality of small areas.

St2149, laying east Nittenau, bridge construction BW 1-1.

Staatl. Bauamt Amberg-Sulzbach | Published March 11, 2016
Winner
Strabag AG, Ingenieurbau Roding
cpvs
45221100

Bridge construction work - 003 2016th

Construction work for buildings relating to health

Klinikum St. Marien Amberg, Anstalt des öffentlichen Rechts der Stadt Amberg | Published February 13, 2015  -  Deadline March 24, 2015
cpvs
45215100

As national and international guidelines and on-site change to occur in December 2015. The helipad is designed for rescue helicopters use the machine type Eurocopter E 135 P2, as it is currently used by the German Air Rescue with the deployed rescue helicopter "Christoph 80". Type of helicopter the Army is accounted for by the increase in load and the larger fire water quantity. 7 m above the roof ridges of the building sections 4A and 4B. The landing deck is provided with a circumferential rollover protection and a means of Fall Protection Network, which protrudes 2 m, equip. The maximum load is designed for 11 tons. (Special landing "Black Hawk"). The discharge rate of the foam solution, foam minimum performance level B, 2 radio controlled fire monitors and an additional multi-purpose branch is 500 l / min. (Special landing "Black Hawk"). 51 t. The hollow sections are secured with clamps on the supporting section. In the deck a drainage channel with gutter heating is incorporated. With a hydraulic surface heating the entire land area is kept free of snow and ice. On the landing deck the valid landing pad markings and -kennzeichnungen are to be provided with non slip finish. Also, as required under the guidelines for Hubschrauberlandecks lighting is to build, which is controlled by the monitoring room. In Zwischenhofbereich BA 4 A / B the Löschwasserrückhaltung done with Kerosinabscheider and connection to the sewage system. The landing deck is connected via a connecting bridge to the stairwell / elevator building in the building section 4B. The fire escape, as a second escape route leads to the construction stage 4A, in the other fire compartment. Candidates must be able to fully functional and the public law, in particular the construction and aviation law permits, and the generally accepted rules of technology offer corresponding total output dimensions, - Drainage Channel - hydraulic surface heating, - fire water supply, dimensioning, dimensioning - Landeckbefeuerung with cabinet - Helipad mark - connecting bridge to the building as landing deck,

Road construction

Staatl. Bauamt Amberg-Sulzbach | Published March 3, 2017  -  Deadline March 28, 2017
cpvs

Road construction

Staatl. Bauamt Amberg-Sulzbach | Published March 14, 2017  -  Deadline April 4, 2017
cpvs