Call +44 800 9755 164

Public tenders for construction in Trhove-sviny Czech Republic

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Trhové Sviny dry polder - flood measures Svinenská creek

Město Trhové Sviny | Published October 16, 2015
cpvs
45240000

build a protective wall (of stone masonry) along the road - Svatopluk Cech embankment on the left bank of the creek in r.km Svinenského 12.0293 to 12.2391 length 212.4 mA construction of a dry polder above the market-Sviny between Dezingrovým and Marouškovým mill - dam polder Svinenská on stream in r.km 14,460 (earth dam height of 5.2 meters with a width of 4 m crown, discharge facility, spillway and the water tank with a maximum retention volume of 114,300 cubic meters over the polder dikes) justification effectiveness of public procurement: The terrain does not allow increase the volume of the dry polder designed. b) a description of the subject of public contract to build protective walls (of stone masonry) along the road - Svatopluk Cech embankment on the left bank of the creek in r.km Svinenského 12.0293 to 12.2391 length 212.4 mA construction of a dry polder above the market-Sviny Dezingrovým and Marouškovým mill - dam polder is Svinenská creek in r.km 14,460 (earth dam height of 5.2 meters with a width of 4 m crown, discharge facility, spillway and the water tank with a maximum retention volume of 114,300 cubic meters over the polder dikes) tender management will be chosen by the contractor with the lowest bid price, while maintaining the required parameters of the work. Twelve months

Trhové Sviny dry polder - flood measures Svinenská creek

Město Trhové Sviny | Published January 26, 2016
cpvs

build a protective wall (of stone masonry) along the road - Svatopluk Cech embankment on the left bank of the creek in r.km Svinenského 12.0293 to 12.2391 length 212.4 mA construction of a dry polder above the market-Sviny between Dezingrovým and Marouškovým mill - dam polder Svinenská on stream in r.km 14,460 (earth dam height of 5.2 meters with a width of 4 m crown, discharge facility, spillway and the water tank with a maximum retention volume of 114,300 cubic meters over the polder dikes) The profile of the contracting entity in accordance with § 48 of the Act no. 137/2006 Coll., on public procurement published only the text of the tender documentation. Reimbursement of the cost of providing the complete tender documentation: CZK 50 without VAT payment in cash at personal pick documentation when sending mail will be charged a handling fee of CZK 50 + postage according to the pricelist of the Czech Post sp + VAT at the time of the chargeable event.

Water supply Trhové Sviny - Třebíčko - Bukvice

Město Trhové Sviny | Published October 26, 2015
cpvs
45231300

construction of water supply network for supplying the population with drinking water: water series A - length of 1351.5 m, water lines B - length of 1139.8 m, water lines C - length of 1,175.0 meters (total 3666.3 meters), AT stations Třebíčko justification effectiveness of public procurement: a) the description needs to be the fulfillment of public contracts achieved: The project aims to ensure sufficient quantity of drinking water for the residents of the settlements Bukvice and Třebíčko. Both locations have their local water source and water supply, but in terms of quality and yield but sources do not meet the required parameters. Repeated water shortages are solved by bringing mobile tankers. b) a description of the subject of the tender: the construction of water supply network for supplying the population with drinking water: water series A - length of 1351.5 m, water lines B - length of 1139.8 m, water lines C - length of 1175.0 m, AT stations Třebíčko c ) a description of the relationship of the public contract and the client's needs: Without implementation of the tender procedure will be impossible to achieve the planned targets sponsor of ensuring sufficient quantities of drinking water for the residents of the settlements Bukvice and Třebíčko connected to the central water supply Trhové Sviny. Implementation of the project will have a positive impact on the quality of life for existing residents and allow a reasonable further development of the area. Tender procedure will be selected by the contractor with the lowest bid price, while maintaining the required parameters of the work. d) the expected date of fulfillment of public contracts: max. 12 months
  • 1