Public tenders for construction in Strakonice Czech Republic

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work No. 4 - apartment house

Městys Štěkeň | Published September 2, 2015
cpvs
45454000

Reconstruction of the building of former warehouses and parking technology for residential building and building adjacent parking Reason effectiveness of public contracts pursuant to § 86 par. 2 of Act no. 137/2006 Coll., On Public Procurement, as amended: a) the description needs to be fulfillment of public contracts achieved: improvement of civic amenities in the village and expand housing options in the community; b) a description of the subject of public contract works, respectively. supplies or services relating to the construction work, the subject of the reconstruction of the building of former warehouses and parking on the residential building techniques and construction of an adjacent parking lot; c) a description of the relationship of the public contract and the client's needs: improving civic amenities in the village and expand housing options in the community are urgent needs of the client, and these needs will be met through the implementation of the public contract; d) the expected date of fulfillment of public contracts: III. Q 2016

Field trips Paračov behind the villa

Česká republika-Státní pozemkový úřad, Krajský pozemkový úřad pro Jihočeský kraj, Pobočka Strakonice | Published April 24, 2015  -  Deadline November 30, 2016
cpvs
45233000

The construction of rural roads according to project documentation drawn up in September 2013 by Ing. George Koplík. The structure includes four buildings: Dirt road RCH1: This is a reconstruction of the existing road, which is the main transport axis east - west on this side of the village. Currently used way beyond the crossing with Cehnickým creek. Editing starts at 0.00 km connecting road III / 1424 Head of Cehnice to Paračov. The width of the entrance road is 5.0 meters up to 0,035 km where will jump to 4.0 meters width from 0,060 km. This width is then valid for the rest of the route. Dirt road ends at 1,200 km. The left 0.54810 km dirt road connects RCV12 and then 0.54910 km dirt road RCV11. Dirt road NCH1: Editing starts at 0.00 km connecting road III / 1424 Head of Cehnice to Paračov. This is the implementation of new communication with a new connection to said road. Width communication from the entrance is 5.0 m up to 0.04395 km where will move to the width of 4.0 meters from 0.06895 km. This width is then valid for the rest of the route. Dirt road ends in 0.50501 km at the crossing with Paračovským stream in place of the existing culvert, where after overcoming progressed steadily along the path already existing unused as a way RCV12. Dirt road RCV12: This is a reconstruction of the original dirt roads. The process begins in 0.50501 km free building on a dirt road NCH1 and forms with it a coherent, operational unit. Width communication is the entire length of 4.0 m. Dirt road ends in connection to 0.74718 km dirt road RCH1. Dirt road RCV11: This is a reconstruction of the original dirt track, which is currently used only partially. Editing starts at 0.00 km connection to the dirt road RCH1. Width of communication is the entire length 4.0 m. Dirt road ends in 0.34736 km connecting local roads in the cadastral Kváskovice.

Field trips Paračov for pond

Česká republika-Státní pozemkový úřad, Krajský prozemkový úřad pro Jihočeský kraj, Pobočka Strakonice | Published April 24, 2015  -  Deadline November 30, 2016
cpvs
45233000

The construction of rural roads according to project documentation drawn up in September 2013 by Ing. George Koplík. The structure includes three buildings: Dirt road RCV6: ​​This is a reconstruction of existing roads, which together with other major transport routes solved axis east - west on this side of the village. SOLUTION The path runs along the edge of the pond Paračovského on one side and the edge of the village on the other side. The process begins in 0.01091 km connecting local road repaired, under her starting off the road III / 1423rd The width of the entrance road is 4.0 meters along the entire length of the route path. Dirt road ends at 0,400 km, which continues straight dirt road NCV7. Dirt road NCV7: Editing starts at 0.00 km dirt road connecting RCV6 and is its direct continuation. This is according to the plan of common facilities kick on the implementation of the new road, but the beginning of the treatment is conducted at the site of the old road up to 0.430 km. Furthermore, until the end of treatment is a new dirt road. Width of communication is the entire length 4.0 m. Dirt road ends in 1.06651 km at the end of the village Paračov. Here, it connects to a dirt road in NCV11 k.ú.Kuřimany. Dirt road NCV11 in k.ú. Kurimany: This is the construction of a new road that starts at 0.00 km free building on a dirt road in NCV7 k.ú. Paračov and forms with it a coherent, operational unit. Width of communication is the entire length 4.0 m. Dirt road ends in 0.25343 km connection already completed the first phase of this journey.

Sewer and water treatment plant in Hlupín

Obec Hlupín | Published March 12, 2015
cpvs
45000000

Procured the construction of sewerage in the municipality Hlupín a total length of 1,457 m of plastic PP pipes, including about 49 pieces of public parts of the sewage sewer connections for objects existing buildings of the village, biological wastewater treatment plant production schedules for EO 100, which will be built on the plot. no. 602/2 to Hlupín including utility paved areas and the building operator WWTP facilities. Reason effectiveness of public procurement in accordance with § 1 of Decree 1) description needs to be fulfilling procurement goal of the project is to reduce water pollution from municipal sources, in this case, in the village Hlupín. Sewer network will have such an extent that tap into all the buildings of the area, but also allow for further development. 2) a description of the subject contract This is the construction of a new sewerage system, the total length of 1,457 m sewer. 3) A description of the relationship between the subject contract and the client's needs. Implementation of the construction will completely meet the needs of the contracting authority. 4) the expected due date for the procurement Expected date of fulfillment of public contracts: April 2016

Construction of sewerage and sewage treatment plant in the village Sousedovice

Obec Sousedovice | Published March 5, 2015  -  Deadline September 30, 2016
cpvs
45232400

Construction of a central point of wastewater treatment in the community (WWTP) together with the construction of catchment stem sewers. Reason effectiveness of public contracts pursuant to § 86 par. 2 of the Public Procurement Act: There is no way centralized wastewater treatment, the existing catchment drains into the river outfall is Smiradického stream. There is a considerable burden on the environment, especially the interest outfall sewers in the stream. It is necessary to build tribal sewer, connect the existing sewerage connections, build a wastewater treatment plant with a comprehensive wastewater treatment.

Construction, foundation and surface works for highways, roads

Česká republika – Státní pozemkový úřad, KPÚ pro Jihočeský kraj, Pobočka Strakonice | Published February 3, 2016
cpvs
45233000, 71250000

Field trips Třesovice.

Construction, foundation and surface works for highways, roads

Česká republika – Státní pozemkový úřad | Published April 23, 2016  -  Deadline May 16, 2016
cpvs
45233000, 71250000

Implementation of the construction of footpaths in k.ú.Třešovice according to project documents prepared in 2012 by Mgr. George Touš. SO 101 Dirt road RCH2 - structurally modifies plot no. 1429 in k. Ú. Třesovice. Dirt road is designed as a single-lane with a connection to the existing local road village Třesovice. The length of the proposed field trips is 1 126.72 meters. The trail dirt track is designed as a single-lane road with reinforced shoulder. Lane width is 3.5 m, the curves, the proposed extension. SO 102 Dirt road RCV6 - structurally modifies plot no. 1418 v. Dirt track is designed as a single-lane connected to a dirt road RCH2 a dirt road in the cadastral Jinín. Route dirt track is designed as a single-lane road with reinforced shoulder. Length designed dirt track is 1042.94 meters. The width of the lane is 4.0 meters, the curves, the proposed extension. SO 103 Dirt road RCV7 - structurally modifies plot no. 1265 k. Ú. Třesovice. Dirt road is designed as a single-lane. Length designed dirt track is 507.30 m. Route dirt track is designed as a single-lane paved road without verges. Lane width is 3.5 m, the curves, the proposed extension. SO 104 Dirt road RCV8, NCV5, RCV9, RCV1 Building object contains the proposal for a total of 4 dirt roads marked RCV8, NCV5, RCV9 in the cadastral Třesovice and RCV1 in the cadastral Paračov - construction and regulates land no. 1431, 1295, 1288, in cadastral Třesovice and land no. 2203, 2205 in the cadastral Paračov. The length of the proposed field trips is 1070.76 m. The trail dirt track is designed as a single-lane paved road without verges. Lane width is 3.5 m, the curves, the proposed extension.

Construction, foundation and surface works for highways, roads

Česká republika – Státní pozemkový úřad, KpÚ pro Jihočeský kraj, Pobočka Strakonice | Published August 27, 2016
Winner
Lesostavby Třeboň a.s.
cpvs

Implementation of the construction of footpaths in k. Ú. Třesovice according to project documents prepared in 2012 by Mgr. George Touš. SO 101 Dirt road RCH2 - structurally modifies plot no. 1429 in k. Ú. Třesovice. Dirt road is designed as a single-lane with a connection to the existing local road village Třesovice. The length of the proposed field trips is 1 126.72 meters. The trail dirt track is designed as a single-lane road with reinforced shoulder. Lane width is 3.5 m, the curves, the proposed extension. SO 102 Dirt road RCV6 - structurally modifies plot no. 1418 v. Dirt track is designed as a single-lane connected to a dirt road RCH2 a dirt road in k. Ú. Jinín. Route dirt track is designed as a single-lane road with reinforced shoulder. Length designed dirt track is 1042.94 meters. The width of the lane is 4.0 meters, the curves, the proposed extension. SO 103 Dirt road RCV7 - structurally modifies plot no. 1265 k. Ú. Třesovice. Dirt road is designed as a single-lane. Length designed dirt track is 507.30 m. Route dirt track is designed as a single-lane paved road without verges. Lane width is 3.5 m, the curves, the proposed extension. SO 104 Dirt road RCV8, NCV5, RCV9, RCV1 Building object contains the proposal for a total of 4 dirt roads marked RCV8, NCV5, RCV9 in k. Ú. Třesovice and RCV1 in k. Ú. Paračov - construction and regulates land no. 1431, 1295 1288 in k. ú. Třesovice and land no. 2203, 2205 in k. ú. Paračov. The length of the proposed field trips is 1070.76 m. The trail dirt track is designed as a single-lane paved road without verges. Lane width is 3.5 m, the curves, the proposed extension.

Construction, foundation and surface works for highways, roads

Česká republika – Státní pozemkový úřad | Published January 14, 2016
Winner
Štolka – Stavko s.r.o.
cpvs
45233000, 71250000

The construction of rural roads under the project documentation drawn up in September 2013 by Ing. George Koplík. The construction includes three buildings: Dirt road RCV6: ​​This is a reconstruction of the existing road, which, together with other major transport routes solved axis east - west on this side of the village. Solved path leads along the edge of the pond Paračovského on one side and the edge of the village on the other side. Editing begins at 0.01091 km connecting local roads repaired under her starting off the road III / 1,423th The width of the entrance road is 4.0 m along the journey route. Dirt road ends at 0,400 km, which goes straight dirt road NCV7. Dirt road NCV7: Editing starts at 0.00 km dirt road connecting RCV6 and is its direct continuation. This is according to the plan of joint facilities free kick on the implementation of a new road, but the beginning of the treatment is conducted at the site of the old road up to 0.430 km. Furthermore, until the end of the treatment it is a new dirt road. The width of the road the entire length of 4.0 m. Dirt road ends at 1.06651 km at the end of the village Paračov. Here, it connects to a dirt road in the cadastral NCV11 Kurimany. NCV11 dirt road in the cadastral Kurimany: This is the construction of a new road that starts at 0.00 km free building on a dirt road in the cadastral NCV7 Paračov and forms with it a coherent, operational unit. The width of the road the entire length of 4.0 m. Dirt road ends at 0.25343 km connection has already implemented the first phase of construction of this road.

Construction, foundation and surface works for highways, roads

Česká republika – Státní pozemkový úřad | Published April 28, 2016
Winner
Lesostavby Třeboň a.s.
cpvs
45233000

Implementation of the construction of rural roads in the cadastral Klínovice according to project documents prepared in 2012 by Atelier Dopi Ltd. Dirt road C8 - reconstruction of field trips C8 category P4,0 / dl 30. 1 073,69 m k.ú. Klínovice, north of the local area Klínovice. Dirt road is a single-lane, two-way width of 3.5 m + 1 x 0.5 m unpaved shoulder (roadway on the dam is narrowed to 3 m). Field trips C12 in the cadastral Klínovice. It is a new single-lane, dirt roads obousměrnoé category P4,0 / 30th dl. 203 m k.ú. Klínovice, north of the village ponds Klínovice between Small and Great Lake. Road construction purpose roads (dirt track) is designed in the structure: a two-layer coating N DV 20 mm penetration macadam rough PMH 100 mm 150 mm crushed gravel crusher SDB SDB 150 mm.

Reconstruction of the swimming pool facilities - swimming pool technology - sand filtration.

Město Strakonice | Published March 22, 2016
Winner
Bazenservis, s.r.o.
cpvs
42912330, 42912350

The subject of the public contract is the selection of the contractor supplies to the implementation of the "Reconstruction of the swimming pool facilities - swimming pool technology - sand filtration". Transaction involves the supply and installation of new sand filters and connection to the existing technological distribution, including the dismantling of existing oc. filters. Supplied with further construction work dismantling, supply and installation of filters.

Modernization of the premises ČSAD Strakonice STTRANS Part A - Construction of heat exchanger stations

ČSAD STTRANS a.s. | Published August 15, 2016
cpvs

construction of a new steam pipe connections and exchange stations for heating the building and the establishment of automatic control operation exchanger station in the project scope Tues. The new water-steam pipe will be connected to the existing steam line for a new heat exchanger station, which is adjacent with a connection object. Furthermore, the establishment of automatic control operation exchanger station in the project scope CH (Providing data transmission to a central control room - Extending the existing supervisory control centers). It is a small-scale public contract that is awarded to the Public Procurement Act. According to § 2 e) of the Act no. 320/2001 Coll., On financial control in public administration, as amended, the selected contractor is obliged to cooperate in the performance of financial control.

Field trips Třesovice

Česká republika-Státní pozemkový úřad | Published April 19, 2016
cpvs

Implementation of the construction of footpaths in k.ú.Třešovice according to project documents prepared in 2012 by Mgr. George Touš. SO 101 Dirt road RCH2 - structurally modifies plot no. 1429 in k. Ú. Třesovice. Dirt road is designed as a single-lane with a connection to the existing local road village Třesovice. The length of the proposed field trips is 1 126.72 meters. The trail dirt track is designed as a single-lane road with reinforced shoulder. Lane width is 3.5 m, the curves, the proposed extension. SO 102 Dirt road RCV6 - structurally modifies plot no. 1418 on. Dirt road is designed as a single-lane connected to a dirt road RCH2 a dirt road in the cadastral Jinín. Route dirt track is designed as a single-lane road with reinforced shoulder. Length designed dirt track is 1042.94 meters. The width of the lane is 4.0 meters, the curves, the proposed extension. SO 103 Dirt road RCV7 - structurally modifies plot no. 1265 k. Ú. Třesovice. Dirt road is designed as a single-lane. Length designed dirt track is 507.30 m. Route dirt track is designed as a single-lane paved road without verges. Lane width is 3.5 m, the curves, the proposed extension. SO 104 Dirt road RCV8, NCV5, RCV9, RCV1 Building object contains the proposal for a total of 4 dirt roads marked RCV8, NCV5, RCV9 in the cadastral Třesovice and RCV1 in the cadastral Paračov - construction and regulates land no. 1431, 1295, 1288, in cadastral Třesovice and land no. 2203, 2205 in the cadastral Paračov. The length of the proposed field trips is 1070.76 m. The trail dirt track is designed as a single-lane paved road without verges. Lane width is 3.5 m, the curves, the proposed extension.

Field trips Paračov for pond

Česká republika-Státní pozemkový úřad | Published January 11, 2016
cpvs

The construction of rural roads under the project documentation drawn up in September 2013 by Ing. George Koplík. The construction includes three buildings: Dirt road RCV6: ​​This is a reconstruction of the existing road, which, together with other major transport routes solved axis east - west on this side of the village. Solved path leads along the edge of the pond Paračovského on one side and the edge of the village on the other side. Editing begins at 0.01091 km connecting local roads repaired under her starting off the road III / 1,423th The width of the entrance road is 4.0 meters along the entire length of the route path. Dirt road ends at 0,400 km, which goes straight dirt road NCV7. Dirt road NCV7: Editing starts at 0.00 km dirt road connecting RCV6 and is its direct continuation. This is according to the plan of joint facilities free kick on the implementation of a new road, but the beginning of the treatment is conducted at the site of the old road up to 0.430 km. Furthermore, until the end of the treatment it is a new dirt road. The width of the communication is in the entire length of 4.0 m. Dirt road ends at 1.06651 km at the end of the village Paračov. Here, it connects to a dirt road in k.ú.Kuřimany NCV11. NCV11 dirt road in k.ú.Kuřimany: This is the construction of a new road that starts at 0.00 km free building on a dirt road in NCV7 k.ú.Paračov and make up with her continuous, operational whole. The width of the communication is in the entire length of 4.0 m. Dirt road ends at 0.25343 km connection has already implemented the first phase of construction of this road.

IV.etapa - Water, sewer - Čejetice

Obec Čejetice | Published January 18, 2016
cpvs

The contract is IV.etapy completion of sewerage and water supply in the village Cejetice. The village has Čejetice-built central wastewater treatment plant, including a new sewage collectors (I-III. Stage). The newly designed IV.etapy area in the southern part of the village's wastewater disposal dealt with in a small compact WWTP with floor Zorkovického stream. In connection with the planned development is the capacity of the wastewater treatment plant has been unsatisfactory. Construction IV. Stage ensure drainage of wastewater from the southern part of the village to the central plant. Existing cleaning the realization sewer canceled. Route sewer pipe is processed according to Investor. The new collector captures the newly established building plots in the south-eastern part of the area. It is also proposed interconnection with existing pipelines in the area of ​​new residential buildings. Over the confluence shaft new collectors with connections, is calculated with the relief chamber. Runoff from OK will be restricted to existing ditch that zaúsťuje to Zorkovického stream. Waste water will be further guided by the new collector along local roads and corridors lead into an existing manhole near the municipal office. The shaft will be reconstructed. On the route is crossing the railway tracks, which will be dealt with puree. In parallel with the sewer lines laid new water lines.

Field trips Třesovice

Česká republika-Státní pozemkový úřad, KPÚ pro Jihočeský kraj, Pobočka Strakonice | Published January 29, 2016
cpvs
45233000

Realization of the construction of rural roads in k.ú.Třešovice according to project documents prepared in 2012 by Mgr. George Touš. SO 101 Dirt road RCH2 - construction and regulates land no. 1429 in k. U. Třesovice. The length of the proposed rural roads is 1 126.72 meters. SO 102 Dirt road RCV6 - construction and regulates land no. 1418 in the cadastral Třesovice. Length designed dirt track is 1042.94 meters. SO 103 Dirt road RCV7 - construction and regulates land no. 1265 k. Ú. Třesovice. Length designed dirt track is 507.30 meters. SO 104 Dirt road RCV8, NCV5, RCV9, RCV1 Building object contains a total of 4 in the draft dirt roads marked RCV8, NCV5, RCV9 in the cadastral Třesovice and RCV1 in the cadastral Paračov - construction and regulates land no. 1431, 1295, 1288 in the cadastral Třesovice and land no. 2203, 2205 in the cadastral Paračov. The length of the proposed rural roads is 1070.76 meters.

Reconstruction of the swimming pool facilities - swimming pool technology - sand filtration

Město Strakonice | Published January 25, 2016
cpvs

The subject of the public contract is the choice of supplier deliveries to implement the project "Reconstruction of the swimming pool facilities - swimming pool technology - sand filtration." Transaction involves the supply and installation of a new sand filtration and connection to the existing technological distribution including demotnáže existing oc. filters. They supplied with further construction work dismantling, supply and installation of filters. The contracting authority with regard to the change of the terms of increaseing deadline for submission nabídek.článek contract 5.3 The agreed price for the work will be paid by the client based on the final invoice issued by the Contractor within 10 days after the completion and acceptance of the works free of defects and backlogs, referred to in the Protocol on handover and takeover . Part of the final invoice, the total inventory of the final statement.

Reconstruction of the swimming pool facilities - swimming pool technology - sand filtration

Město Strakonice | Published March 17, 2016
cpvs

The subject of the public contract is the selection of the contractor supplies to the implementation of the "Reconstruction of the swimming pool facilities - swimming pool technology - sand filtration". Transaction involves the supply and installation of new sand filters and connection to the existing technological distribution including demotnáže existing oc. filters. Supplied with further construction work dismantling, supply and installation of filters.

IV.etapa - Water, sewer - Čejetice

Obec Čejetice | Published March 3, 2016
cpvs

The contract is IV.etapy completion of sewerage and water supply in the village Cejetice. The village has Čejetice-built central wastewater treatment plant, including new sewerage collectors (I-III. Stage). The new solution IV.etapy area in the southern part of the village's wastewater disposal dealt with in a small compact wastewater treatment plant to discharge into the creek Zorkovického. In connection with the planned development is the capacity of the wastewater treatment plant has been unsatisfactory. Construction IV. Stage ensure discharge of sewage from the southern part of the village to the central wastewater. Existing cleaning the realization sewer canceled. Route sewer pipe is processed according to Investor. The new collector captures the newly created building plots in the south-eastern part of the area. It is also proposed interconnection with existing pipelines in the area of ​​new residential buildings. Under the new sorters confluence shaft linking is calculated with the relief chamber. Outflow from OK will be restricted to the existing ditch that zaúsťuje Zorkovického into the creek. Waste water will be further guided by the new collector along local roads and corridors lead to the existing manhole near the municipal office. The shaft will be restored. This route to crossing the railway tracks, which will be solved puree. In concurrence with the sewer lines laid new water lines.

Construction work No. 4 - apartment house

Městys Štěkeň | Published November 9, 2015
cpvs

The subject of public procurement is the reconstruction of the building, which will be used partly for housing, in part, will retain the current operation of parking mobile equipment and warehouse. The newly established the residential building and the rest occasional automobile parking facility will serve the park. The original building with a gable roof has a rectangular, oblong shape with dimensions of 15.39 x 59.55 m, ± 0.0000 = 404,335 m and its ground plan footprint or height of the ridge rebuilding changed. The west side of the building before the entry level 1.NP be parked rectangular shed with dimensions of 6.5 x 5 m, to wheelchair access to 2.NP will be from the north side connected three arms ramp with a slope of 1:16. Building on the new saddle roof with a slope of 20 degrees, entrance canopy will cover flat roofs with a slope of 7 degrees. The proposed building has two floors, located in steep terrain. The slope of the terrain runs from the northwest to the southeast corner of the building. Gable height is 9,145 m relative to floor level 1.NP = 0.0000 = 404.96 m, ridge height of about 8,980 m. Plot designed for construction of parking currently used for occasional parking cars or as a dumping ground. The proposed parking area layout is structured to maximize and according to the investor. Using a gray area will be paved with interlocking tiles, lined with curbs, including connection to the existing road parking. Other parking areas will be backfilled visible stone factions.