Public tenders for construction in Strakonice Czech Republic

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

The revitalization of public spaces - parking Podskalská, Strakonice

Město Strakonice | Published October 10, 2014
cpvs

The subject of the public contract is to select a building contractor to implement the project "Revitalisation of public spaces - parking Podskalská, Strakonice." Implementation includes in particular the construction of a paved parking area construction, drainage areas, permanent traffic signs and landscaping.

The revitalization of public spaces - parking Podskalská, Strakonice.

Město Strakonice | Published October 15, 2014
Winner
Swietelsky stavební s.r.o.Pražská tř. 495/58České Budějovice 370 04
cpvs
45223300

The subject of the public contract is to select a building contractor to implement the project "Revitalisation of public spaces - parking Podskalská, Strakonice." Implementation includes in particular the construction of a paved parking area construction, drainage areas, permanent traffic signs and landscaping.

Edit winter stadium STARZ II, Strakonice

město Strakonice | Published February 4, 2015
cpvs
45310000

The delivery is dismantling the existing air conditioning (HVAC) distribution and installation of new HVAC ventilation for escape routes, air handling units, etc. In addition, it will be shipped a replacement power supply for air-conditioning and new wiring PA and Emergency Sound. Supplied with further construction work associated with the penetration and finishing new passages for duct etc.

"Warmth Colleges, Technical High School and Secondary School of Crafts and services, Strakonice"

Vyšší odborná škola, Střední průmyslová škola a Střední odborná škola řemesel a služeb, Strakonice, Zvolenská 934 | Published February 19, 2015
cpvs

The subject of procurement is complex construction projects: "Warmth Colleges, Technical High School and Secondary School of Crafts and services, Strakonice" the extent specified in the project documentation titled "RENOVATION Colleges, Technical High School and Secondary School of Crafts and Services Zvolenska CP. 934 IN STRAKONICE - overall insulation BUILDING ENVELOPE ", including a list of works, supplies and services, compiled by Jiri Urbanek, Frontier 70, Strakonice, date: 10/2014

Construction of sewerage and sewage treatment plant in the village Sousedovice

Obec Sousedovice | Published February 27, 2015  -  Deadline September 30, 2016
cpvs
45232400

Construction of a central point of wastewater treatment in the community (WWTP) together with the construction of catchment stem sewers. Reason effectiveness of public contracts pursuant to § 86 par. 2 of the Public Procurement Act: There is no way centralized wastewater treatment, the existing catchment drains into the river outfall is Smiradického stream. There is a considerable burden on the environment, especially the interest outfall sewers in the stream. It is necessary to build tribal sewer, connect the existing sewerage connections, build a wastewater treatment plant with a comprehensive wastewater treatment.

Sewer and water treatment plant in Hlupín

Obec Hlupín | Published March 12, 2015
cpvs
45000000

Procured the construction of sewerage in the municipality Hlupín a total length of 1,457 m of plastic PP pipes, including about 49 pieces of public parts of the sewage sewer connections for objects existing buildings of the village, biological wastewater treatment plant production schedules for EO 100, which will be built on the plot. no. 602/2 to Hlupín including utility paved areas and the building operator WWTP facilities. Reason effectiveness of public procurement in accordance with § 1 of Decree 1) description needs to be fulfilling procurement goal of the project is to reduce water pollution from municipal sources, in this case, in the village Hlupín. Sewer network will have such an extent that tap into all the buildings of the area, but also allow for further development. 2) a description of the subject contract This is the construction of a new sewerage system, the total length of 1,457 m sewer. 3) A description of the relationship between the subject contract and the client's needs. Implementation of the construction will completely meet the needs of the contracting authority. 4) the expected due date for the procurement Expected date of fulfillment of public contracts: April 2016

Construction of sewerage and sewage treatment plant in the village Sousedovice

Obec Sousedovice | Published April 2, 2015
cpvs

The subject of the public contract is to build a central sewer system that runs through the center of the village along through traffic Libětice - Mutěnice parc.č. 1030-1020 in the cadastral Sousedovice; ie. a new sewerage system from PP plastic pipes, sewage treatment plant construction and repair local roads in parts necessary belt road excavations concerned. Sanitation will be made from plastic ribbed PP pipe, in the route of individual sections of the proposed ordinary sewer manholes will be set up from precast concrete. Existing local sewers will be connected to the proposed sewer. Wastewater treatment will be done type of biological treatment technologies commonly available manufacturers in the Czech Republic, which is based on biological treatment uniform heterogeneous biological sludge maintained in suspension, with simultaneous denitrification. WWTP operation will be controlled by a computer unit, run the blower will be controlled by the signal from the oxygen sensor so that the operating mode instantly adjusts WWTP load. The project aims to prevent environmental pollution waste water and allow further development of the municipality in accordance with the master plan community. The proposed WWTP parameters - total capacity of 45.90 m3 / day, the total capacity of the WWTP EO 251, the average annual load WWTP 16,753.5 m3 / day, runoff in m3 / day 45.90. Suggested values ​​of treated water (in units according NV 61/2003 Coll.) - 118 COD, BOD5 39, N-NH4 + 36. Do sewer lines are connected and discharge the individual sewers from adjacent parts of the village. The invitation to tender and to demonstrate qualification will be published on the official board sponsor. The invitation to tender and to demonstrate skills and complete tender documentation will be available on the contracting entity profile. Additional information on the tender conditions will be together with sending information to the tenderer which a request for additional information has the procedure laid down in the tender dossier, published on the profile of the submitter. The sponsor provides unlimited and direct remote access to tender documents on the contracting entity profile.

Edit winter stadium STARZ II, Strakonice

město Strakonice | Published April 17, 2015
cpvs

The delivery is dismantling the existing air conditioning (HVAC) distribution and installation of new HVAC ventilation for escape routes, air handling units, etc. In addition, it will be shipped a replacement power supply for air-conditioning and new wiring PA and Emergency Sound. Supplied with further construction work associated with the penetration and finishing new passages for duct etc.

Field trips Paračov behind the villa

Česká republika-Státní pozemkový úřad, Krajský pozemkový úřad pro Jihočeský kraj, Pobočka Strakonice | Published April 24, 2015  -  Deadline November 30, 2016
cpvs
45233000

The construction of rural roads according to project documentation drawn up in September 2013 by Ing. George Koplík. The structure includes four buildings: Dirt road RCH1: This is a reconstruction of the existing road, which is the main transport axis east - west on this side of the village. Currently used way beyond the crossing with Cehnickým creek. Editing starts at 0.00 km connecting road III / 1424 Head of Cehnice to Paračov. The width of the entrance road is 5.0 meters up to 0,035 km where will jump to 4.0 meters width from 0,060 km. This width is then valid for the rest of the route. Dirt road ends at 1,200 km. The left 0.54810 km dirt road connects RCV12 and then 0.54910 km dirt road RCV11. Dirt road NCH1: Editing starts at 0.00 km connecting road III / 1424 Head of Cehnice to Paračov. This is the implementation of new communication with a new connection to said road. Width communication from the entrance is 5.0 m up to 0.04395 km where will move to the width of 4.0 meters from 0.06895 km. This width is then valid for the rest of the route. Dirt road ends in 0.50501 km at the crossing with Paračovským stream in place of the existing culvert, where after overcoming progressed steadily along the path already existing unused as a way RCV12. Dirt road RCV12: This is a reconstruction of the original dirt roads. The process begins in 0.50501 km free building on a dirt road NCH1 and forms with it a coherent, operational unit. Width communication is the entire length of 4.0 m. Dirt road ends in connection to 0.74718 km dirt road RCH1. Dirt road RCV11: This is a reconstruction of the original dirt track, which is currently used only partially. Editing starts at 0.00 km connection to the dirt road RCH1. Width of communication is the entire length 4.0 m. Dirt road ends in 0.34736 km connecting local roads in the cadastral Kváskovice.

Field trips Paračov for pond

Česká republika-Státní pozemkový úřad, Krajský prozemkový úřad pro Jihočeský kraj, Pobočka Strakonice | Published April 24, 2015  -  Deadline November 30, 2016
cpvs
45233000

The construction of rural roads according to project documentation drawn up in September 2013 by Ing. George Koplík. The structure includes three buildings: Dirt road RCV6: ​​This is a reconstruction of existing roads, which together with other major transport routes solved axis east - west on this side of the village. SOLUTION The path runs along the edge of the pond Paračovského on one side and the edge of the village on the other side. The process begins in 0.01091 km connecting local road repaired, under her starting off the road III / 1423rd The width of the entrance road is 4.0 meters along the entire length of the route path. Dirt road ends at 0,400 km, which continues straight dirt road NCV7. Dirt road NCV7: Editing starts at 0.00 km dirt road connecting RCV6 and is its direct continuation. This is according to the plan of common facilities kick on the implementation of the new road, but the beginning of the treatment is conducted at the site of the old road up to 0.430 km. Furthermore, until the end of treatment is a new dirt road. Width of communication is the entire length 4.0 m. Dirt road ends in 1.06651 km at the end of the village Paračov. Here, it connects to a dirt road in NCV11 k.ú.Kuřimany. Dirt road NCV11 in k.ú. Kurimany: This is the construction of a new road that starts at 0.00 km free building on a dirt road in NCV7 k.ú. Paračov and forms with it a coherent, operational unit. Width of communication is the entire length 4.0 m. Dirt road ends in 0.25343 km connection already completed the first phase of this journey.

Construction, foundation and surface works for highways, roads

Česká republika – Státní pozemkový úřad, Krajský prozemkový úřad pro Jihočeský kraj, Pobočka Strakonice | Published April 29, 2015
cpvs
45233000, 71250000

Polní cesty Paračov za rybník.

Construction, foundation and surface works for highways, roads

Česká republika – Státní pozemkový úřad, Krajský pozemkový úřad pro Jihočeský kraj, Pobočka Strakonice | Published April 29, 2015
cpvs
45233000, 71250000

Polní cesty Paračov za vilou.

The acquisition of vehicles for collection of municipal waste for the Technical Services Ltd. Strakonice

Technické služby Strakonice s.r.o. | Published May 29, 2015
cpvs

The intention of the contracting authority is a contract under which the successful tenderer on its responsibility and deliver cost by contracting authorities after the conclusion of the subject of performance of this contract (goods), which is the vehicle for municipal waste collection. Its construction and the possibility of using it is a modern and effective technology.

Sewer Řepice - connection to the WWTP Řepice

Obec Řepice | Published June 2, 2015  -  Deadline November 30, 2015
cpvs
45232400

construction of sewerage (DN 300 - gravitational part and PE 90 - pressure drainage), 43 manholes, overflows, pumping; total length of the proposed new sewerage DN 300 is 1643.5 m, 90 * PE 8.2 is 116 m justification effectiveness of public procurement: a) a description needs to be the fulfillment of public contracts achieved: The project aims to build a sewer system that will divert sewage Water Treatment Works Strakonice. Sewer will be connected to the existing sewer system, which is currently at the mouth of the few places open to the terrain Individual outlets are connected via overflows into drains and sewage water discharged into the sewage treatment plant in Strakonice. b) a description of the subject of public contract to build sewerage (DN 300 - gravitational part and PE 90 - pressure drainage), 43 manholes, overflows, pumping; total length of the proposed new sewerage DN 300 is 1643.5 meters, PE 90 * 8,2 116 mc) a description of the relationship between the subject contract and the client's needs: Without implementation of the procurement procedure can not achieve the expected goals of the contracting entity's objective of building a sewer system that will drain gray water treatment plant Strakonice. The project will have a positive impact on the environment. The tender procedure will be chosen by the contractor with the lowest bid price, while maintaining the required quality and work parameters according to project documentation and inventory of works, supplies and services. d) the envisaged deadline for fulfilling the public contract completion by 30. 11. 2015

Edit hockey stadium STARZ II, Strakonice

město Strakonice | Published June 25, 2015
cpvs

The delivery will include removal of the existing air-conditioning (HVAC) distribution and installation of new HVAC ventilation for escape routes, air handling units, etc. will also be supplied with a replacement power supply for HVAC and new wiring PA and Emergency Sound. They supplied with further construction work and finishing with penetration of new passages for duct etc.

Sewer Řepice - connection to the wastewater treatment plant Strakonice

Obec Řepice | Published July 2, 2015  -  Deadline November 30, 2015
cpvs
45232400

construction of sewerage (DN 300 - gravitational part and PE 90 - pressure drainage), 43 manholes, overflows, pumping; total length of the proposed new sewerage DN 300 is 1643.5 m, 90 * PE 8.2 is 116 m justification effectiveness of public procurement: a) a description needs to be the fulfillment of public contracts achieved: The project aims to build a sewer system that will divert sewage Water Treatment Works Strakonice. Sewer will be connected to the existing sewer system, which is currently at the mouth of the few places open to the terrain Individual outlets are connected via overflows into drains and sewage water discharged into the sewage treatment plant in Strakonice. b) a description of the subject of public contract to build sewerage (DN 300 - gravitational part and PE 90 - pressure drainage), 43 manholes, overflows, pumping; total length of the proposed new sewerage DN 300 is 1643.5 meters, PE 90 * 8,2 116 mc) a description of the relationship between the subject contract and the client's needs: Without implementation of the procurement procedure can not achieve the expected goals of the contracting entity's objective of building a sewer system that will drain gray water treatment plant Strakonice. The project will have a positive impact on the environment. The tender procedure will be chosen by the contractor with the lowest bid price, while maintaining the required quality and work parameters according to project documentation and inventory of works, supplies and services. d) the envisaged deadline for fulfilling the public contract completion by 30. 11. 2015

Sewer Řepice - connection to the wastewater treatment plant Strakonice

Obec Řepice | Published July 8, 2015
cpvs

construction of sewerage (DN 300 - gravitational part and PE 90 - pressure drainage), 43 manholes, overflows, pumping; total length of the proposed new sewerage DN 300 is 1643.5 m, 90 * PE 8.2 is 116 m on the profile of the contracting entity in accordance with § 48 of Act no. 137/2006 Coll., on public tenders published only the text of the tender documentation. Reimbursement of the costs of providing the complete tender documentation: CZK 50 excluding VAT, payable in cash at personal pick documentation when sending mail will be charged a handling fee of CZK 50 + postage according to price list of the Czech Post sp + VAT at the time of the taxable event.

Field trips Měkynec

Česká republika-Státní pozemkový úřad, KPÚ pro Jihočeský kraj, Pobočka Strakonice | Published July 29, 2015
cpvs

The construction of rural roads under the project documentation developed in 2012 by Ing. Jan Touš. The construction includes a building object - Field trips HPC13, HPC15. Construction will be carried out on the land no. 1728, 1023, 1631, 1025 which are intended for the construction of rural roads in the administrative area Měkynec and Krajníčko. Land is located southwest of the village Měkynec. Dirt road is designed as a single-lane connection to the existing asphalt road that connects the village Měkynec. Vertical alignment vertical alignment dirt track is designed with respect to the terrain and surrounding land. The newly designed state follows to a large extent the existing vertical solutions. The whole section is designed base 2.5% unilateral cross slope, which is variable according to the directional arches in the route. Road structure is designed in the following composition: asphalt coating of the 20 mm penetration macadam PM 100 mm gravel vibrated ŠV 200 mm crushed gravel SD 200 mm.

Rekonatrukce background of a swimming pool - the pool technologies - sand filtration

město Strakonice | Published July 30, 2015
cpvs
42912330

Delivery and installation of new plastic sand filtration and connection to the existing technological distribution, including the dismantling of existing oc. filters. They supplied with further construction work dismantling, supply and installation of filters.

Construction, foundation and surface works for highways, roads

Česká republika – Státní pozemkový úřad, KPÚ pro Jihočeský kraj, Pobočka Strakonice | Published July 31, 2015
Winner
Lesostavby Třeboň a.s.
cpvs
45233000, 71250000

The construction of rural roads under the project documentation developed in 2012 by Ing. Jan Touš. The construction includes a building object - Field trips HPC13, HPC15. Construction will be carried out on the land no. 1728, 1023, 1631, 1025 which are intended for the construction of rural roads in the administrative area Měkynec and Krajníčko. Land is located southwest of the village Měkynec. Dirt road is designed as a single-lane connection to the existing asphalt road that connects the village Měkynec. Vertical alignment vertical alignment dirt track is designed with respect to the terrain and surrounding land. The newly designed state follows to a large extent the existing vertical solutions. The whole section is designed base 2.5% unilateral cross slope, which is variable according to the directional arches in the route. Road structure is designed in the following composition: asphalt coating of the 20 mm penetration macadam PM 100 mm gravel vibrated ŠV 200 mm crushed gravel SD 200 mm.