Public tenders for construction in Strakonice Czech Republic

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Field trips Třesovice

Česká republika-Státní pozemkový úřad, KpÚ pro Jihočeský kraj, Pobočka Strakonice | Published August 23, 2016
cpvs

Implementation of the construction of footpaths in k.ú.Třešovice according to project documents prepared in 2012 by Mgr. George Touš. SO 101 Dirt road RCH2 - structurally modifies plot no. 1429 in k. Ú. Třesovice. Dirt road is designed as a single-lane with a connection to the existing local road village Třesovice. The length of the proposed field trips is 1 126.72 meters. The trail dirt track is designed as a single-lane road with reinforced shoulder. Lane width is 3.5 m, the curves, the proposed extension. SO 102 Dirt road RCV6 - structurally modifies plot no. 1418 on. Dirt road is designed as a single-lane connected to a dirt road RCH2 a dirt road in the cadastral Jinín. Route dirt track is designed as a single-lane road with reinforced shoulder. Length designed dirt track is 1042.94 meters. The width of the lane is 4.0 meters, the curves, the proposed extension. SO 103 Dirt road RCV7 - structurally modifies plot no. 1265 k. Ú. Třesovice. Dirt road is designed as a single-lane. Length designed dirt track is 507.30 m. Route dirt track is designed as a single-lane paved road without verges. Lane width is 3.5 m, the curves, the proposed extension. SO 104 Dirt road RCV8, NCV5, RCV9, RCV1 Building object contains the proposal for a total of 4 dirt roads marked RCV8, NCV5, RCV9 in the cadastral Třesovice and RCV1 in the cadastral Paračov - construction and regulates land no. 1431, 1295, 1288, in cadastral Třesovice and land no. 2203, 2205 in the cadastral Paračov. The length of the proposed field trips is 1070.76 m. The trail dirt track is designed as a single-lane paved road without verges. Lane width is 3.5 m, the curves, the proposed extension.

Modernization of the premises ČSAD Strakonice STTRANS Part A - Construction of heat exchanger stations

ČSAD STTRANS a.s. | Published August 15, 2016
cpvs

construction of a new steam pipe connections and exchange stations for heating the building and the establishment of automatic control operation exchanger station in the project scope Tues. The new water-steam pipe will be connected to the existing steam line for a new heat exchanger station, which is adjacent with a connection object. Furthermore, the establishment of automatic control operation exchanger station in the project scope CH (Providing data transmission to a central control room - Extending the existing supervisory control centers). It is a small-scale public contract that is awarded to the Public Procurement Act. According to § 2 e) of the Act no. 320/2001 Coll., On financial control in public administration, as amended, the selected contractor is obliged to cooperate in the performance of financial control.

Field trips Klínovice

Česká republika-Státní pozemkový úřad | Published April 26, 2016
cpvs

Implementation of the construction of rural roads in the cadastral Klínovice according to project documents prepared in 2012 by ATELIER Dopi Ltd. Dirt road C8 - reconstruction of field trips C8 category P4,0 / dl 30. 1 073,69m in the cadastral Klínovice, north of the local area Klínovice. Dirt road is a single-lane, two-way width of 3.5 m + 0.5 m 1x unpaved shoulder (roadway on the dam is narrowed to 3.0 meters). Field trips C12 in the cadastral Klínovice. It is a new single-lane, dirt roads obousměrnoé category P4,0 / 30th dl. 203 m in the cadastral Klínovice, north of the village ponds Klínovice between Small and Great Lake. Road construction purpose roads (dirt track) is designed in the structure: a two-layer coating N DV 20 mm penetration macadam rough PMH 100 mm crushed gravel crusher SDB SDB 150 mm 150 mm

Field trips Třesovice

Česká republika-Státní pozemkový úřad | Published April 19, 2016
cpvs

Implementation of the construction of footpaths in k.ú.Třešovice according to project documents prepared in 2012 by Mgr. George Touš. SO 101 Dirt road RCH2 - structurally modifies plot no. 1429 in k. Ú. Třesovice. Dirt road is designed as a single-lane with a connection to the existing local road village Třesovice. The length of the proposed field trips is 1 126.72 meters. The trail dirt track is designed as a single-lane road with reinforced shoulder. Lane width is 3.5 m, the curves, the proposed extension. SO 102 Dirt road RCV6 - structurally modifies plot no. 1418 on. Dirt road is designed as a single-lane connected to a dirt road RCH2 a dirt road in the cadastral Jinín. Route dirt track is designed as a single-lane road with reinforced shoulder. Length designed dirt track is 1042.94 meters. The width of the lane is 4.0 meters, the curves, the proposed extension. SO 103 Dirt road RCV7 - structurally modifies plot no. 1265 k. Ú. Třesovice. Dirt road is designed as a single-lane. Length designed dirt track is 507.30 m. Route dirt track is designed as a single-lane paved road without verges. Lane width is 3.5 m, the curves, the proposed extension. SO 104 Dirt road RCV8, NCV5, RCV9, RCV1 Building object contains the proposal for a total of 4 dirt roads marked RCV8, NCV5, RCV9 in the cadastral Třesovice and RCV1 in the cadastral Paračov - construction and regulates land no. 1431, 1295, 1288, in cadastral Třesovice and land no. 2203, 2205 in the cadastral Paračov. The length of the proposed field trips is 1070.76 m. The trail dirt track is designed as a single-lane paved road without verges. Lane width is 3.5 m, the curves, the proposed extension.

Field trips Paračov for pond

Česká republika-Státní pozemkový úřad | Published January 11, 2016
cpvs

The construction of rural roads under the project documentation drawn up in September 2013 by Ing. George Koplík. The construction includes three buildings: Dirt road RCV6: ​​This is a reconstruction of the existing road, which, together with other major transport routes solved axis east - west on this side of the village. Solved path leads along the edge of the pond Paračovského on one side and the edge of the village on the other side. Editing begins at 0.01091 km connecting local roads repaired under her starting off the road III / 1,423th The width of the entrance road is 4.0 meters along the entire length of the route path. Dirt road ends at 0,400 km, which goes straight dirt road NCV7. Dirt road NCV7: Editing starts at 0.00 km dirt road connecting RCV6 and is its direct continuation. This is according to the plan of joint facilities free kick on the implementation of a new road, but the beginning of the treatment is conducted at the site of the old road up to 0.430 km. Furthermore, until the end of the treatment it is a new dirt road. The width of the communication is in the entire length of 4.0 m. Dirt road ends at 1.06651 km at the end of the village Paračov. Here, it connects to a dirt road in k.ú.Kuřimany NCV11. NCV11 dirt road in k.ú.Kuřimany: This is the construction of a new road that starts at 0.00 km free building on a dirt road in NCV7 k.ú.Paračov and make up with her continuous, operational whole. The width of the communication is in the entire length of 4.0 m. Dirt road ends at 0.25343 km connection has already implemented the first phase of construction of this road.

Construction, foundation and surface works for highways, roads

Česká republika – Státní pozemkový úřad | Published January 14, 2016
Winner
Štolka – Stavko s.r.o.
cpvs
45233000, 71250000

The construction of rural roads under the project documentation drawn up in September 2013 by Ing. George Koplík. The construction includes three buildings: Dirt road RCV6: ​​This is a reconstruction of the existing road, which, together with other major transport routes solved axis east - west on this side of the village. Solved path leads along the edge of the pond Paračovského on one side and the edge of the village on the other side. Editing begins at 0.01091 km connecting local roads repaired under her starting off the road III / 1,423th The width of the entrance road is 4.0 m along the journey route. Dirt road ends at 0,400 km, which goes straight dirt road NCV7. Dirt road NCV7: Editing starts at 0.00 km dirt road connecting RCV6 and is its direct continuation. This is according to the plan of joint facilities free kick on the implementation of a new road, but the beginning of the treatment is conducted at the site of the old road up to 0.430 km. Furthermore, until the end of the treatment it is a new dirt road. The width of the road the entire length of 4.0 m. Dirt road ends at 1.06651 km at the end of the village Paračov. Here, it connects to a dirt road in the cadastral NCV11 Kurimany. NCV11 dirt road in the cadastral Kurimany: This is the construction of a new road that starts at 0.00 km free building on a dirt road in the cadastral NCV7 Paračov and forms with it a coherent, operational unit. The width of the road the entire length of 4.0 m. Dirt road ends at 0.25343 km connection has already implemented the first phase of construction of this road.

IV.etapa - Water, sewer - Čejetice

Obec Čejetice | Published January 18, 2016
cpvs

The contract is IV.etapy completion of sewerage and water supply in the village Cejetice. The village has Čejetice-built central wastewater treatment plant, including a new sewage collectors (I-III. Stage). The newly designed IV.etapy area in the southern part of the village's wastewater disposal dealt with in a small compact WWTP with floor Zorkovického stream. In connection with the planned development is the capacity of the wastewater treatment plant has been unsatisfactory. Construction IV. Stage ensure drainage of wastewater from the southern part of the village to the central plant. Existing cleaning the realization sewer canceled. Route sewer pipe is processed according to Investor. The new collector captures the newly established building plots in the south-eastern part of the area. It is also proposed interconnection with existing pipelines in the area of ​​new residential buildings. Over the confluence shaft new collectors with connections, is calculated with the relief chamber. Runoff from OK will be restricted to existing ditch that zaúsťuje to Zorkovického stream. Waste water will be further guided by the new collector along local roads and corridors lead into an existing manhole near the municipal office. The shaft will be reconstructed. On the route is crossing the railway tracks, which will be dealt with puree. In parallel with the sewer lines laid new water lines.

Field trips Třesovice

Česká republika-Státní pozemkový úřad, KPÚ pro Jihočeský kraj, Pobočka Strakonice | Published January 29, 2016
cpvs
45233000

Realization of the construction of rural roads in k.ú.Třešovice according to project documents prepared in 2012 by Mgr. George Touš. SO 101 Dirt road RCH2 - construction and regulates land no. 1429 in k. U. Třesovice. The length of the proposed rural roads is 1 126.72 meters. SO 102 Dirt road RCV6 - construction and regulates land no. 1418 in the cadastral Třesovice. Length designed dirt track is 1042.94 meters. SO 103 Dirt road RCV7 - construction and regulates land no. 1265 k. Ú. Třesovice. Length designed dirt track is 507.30 meters. SO 104 Dirt road RCV8, NCV5, RCV9, RCV1 Building object contains a total of 4 in the draft dirt roads marked RCV8, NCV5, RCV9 in the cadastral Třesovice and RCV1 in the cadastral Paračov - construction and regulates land no. 1431, 1295, 1288 in the cadastral Třesovice and land no. 2203, 2205 in the cadastral Paračov. The length of the proposed rural roads is 1070.76 meters.

Reconstruction of the swimming pool facilities - swimming pool technology - sand filtration

Město Strakonice | Published January 25, 2016
cpvs

The subject of the public contract is the choice of supplier deliveries to implement the project "Reconstruction of the swimming pool facilities - swimming pool technology - sand filtration." Transaction involves the supply and installation of a new sand filtration and connection to the existing technological distribution including demotnáže existing oc. filters. They supplied with further construction work dismantling, supply and installation of filters. The contracting authority with regard to the change of the terms of increaseing deadline for submission nabídek.článek contract 5.3 The agreed price for the work will be paid by the client based on the final invoice issued by the Contractor within 10 days after the completion and acceptance of the works free of defects and backlogs, referred to in the Protocol on handover and takeover . Part of the final invoice, the total inventory of the final statement.

Construction, foundation and surface works for highways, roads

Česká republika – Státní pozemkový úřad, KPÚ pro Jihočeský kraj, Pobočka Strakonice | Published February 3, 2016
cpvs
45233000, 71250000

Field trips Třesovice.

Reconstruction of the swimming pool facilities - swimming pool technology - sand filtration

Město Strakonice | Published March 17, 2016
cpvs

The subject of the public contract is the selection of the contractor supplies to the implementation of the "Reconstruction of the swimming pool facilities - swimming pool technology - sand filtration". Transaction involves the supply and installation of new sand filters and connection to the existing technological distribution including demotnáže existing oc. filters. Supplied with further construction work dismantling, supply and installation of filters.

IV.etapa - Water, sewer - Čejetice

Obec Čejetice | Published March 3, 2016
cpvs

The contract is IV.etapy completion of sewerage and water supply in the village Cejetice. The village has Čejetice-built central wastewater treatment plant, including new sewerage collectors (I-III. Stage). The new solution IV.etapy area in the southern part of the village's wastewater disposal dealt with in a small compact wastewater treatment plant to discharge into the creek Zorkovického. In connection with the planned development is the capacity of the wastewater treatment plant has been unsatisfactory. Construction IV. Stage ensure discharge of sewage from the southern part of the village to the central wastewater. Existing cleaning the realization sewer canceled. Route sewer pipe is processed according to Investor. The new collector captures the newly created building plots in the south-eastern part of the area. It is also proposed interconnection with existing pipelines in the area of ​​new residential buildings. Under the new sorters confluence shaft linking is calculated with the relief chamber. Outflow from OK will be restricted to the existing ditch that zaúsťuje Zorkovického into the creek. Waste water will be further guided by the new collector along local roads and corridors lead to the existing manhole near the municipal office. The shaft will be restored. This route to crossing the railway tracks, which will be solved puree. In concurrence with the sewer lines laid new water lines.

Reconstruction of the swimming pool facilities - swimming pool technology - sand filtration.

Město Strakonice | Published March 22, 2016
Winner
Bazenservis, s.r.o.
cpvs
42912330, 42912350

The subject of the public contract is the selection of the contractor supplies to the implementation of the "Reconstruction of the swimming pool facilities - swimming pool technology - sand filtration". Transaction involves the supply and installation of new sand filters and connection to the existing technological distribution, including the dismantling of existing oc. filters. Supplied with further construction work dismantling, supply and installation of filters.

Construction work No. 4 - apartment house

Městys Štěkeň | Published November 9, 2015
cpvs

The subject of public procurement is the reconstruction of the building, which will be used partly for housing, in part, will retain the current operation of parking mobile equipment and warehouse. The newly established the residential building and the rest occasional automobile parking facility will serve the park. The original building with a gable roof has a rectangular, oblong shape with dimensions of 15.39 x 59.55 m, ± 0.0000 = 404,335 m and its ground plan footprint or height of the ridge rebuilding changed. The west side of the building before the entry level 1.NP be parked rectangular shed with dimensions of 6.5 x 5 m, to wheelchair access to 2.NP will be from the north side connected three arms ramp with a slope of 1:16. Building on the new saddle roof with a slope of 20 degrees, entrance canopy will cover flat roofs with a slope of 7 degrees. The proposed building has two floors, located in steep terrain. The slope of the terrain runs from the northwest to the southeast corner of the building. Gable height is 9,145 m relative to floor level 1.NP = 0.0000 = 404.96 m, ridge height of about 8,980 m. Plot designed for construction of parking currently used for occasional parking cars or as a dumping ground. The proposed parking area layout is structured to maximize and according to the investor. Using a gray area will be paved with interlocking tiles, lined with curbs, including connection to the existing road parking. Other parking areas will be backfilled visible stone factions.

Field trips Paračov for pond

Česká republika-Státní pozemkový úřad, KPÚ pro jihočeský kraj, Pobočka Strakonice | Published October 7, 2015
cpvs

The construction of rural roads under the project documentation drawn up in September 2013 by Ing. George Koplík. The construction includes three buildings: Dirt road RCV6: ​​This is a reconstruction of the existing road, which, together with other major transport routes solved axis east - west on this side of the village. Solved path leads along the edge of the pond Paračovského on one side and the edge of the village on the other side. Editing begins at 0.01091 km connecting local roads repaired under her starting off the road III / 1,423th The width of the entrance road is 4.0 meters along the entire length of the route path. Dirt road ends at 0,400 km, which goes straight dirt road NCV7. Dirt road NCV7: Editing starts at 0.00 km dirt road connecting RCV6 and is its direct continuation. This is according to the plan of joint facilities free kick on the implementation of a new road, but the beginning of the treatment is conducted at the site of the old road up to 0.430 km. Furthermore, until the end of the treatment it is a new dirt road. The width of the communication is in the entire length of 4.0 m. Dirt road ends at 1.06651 km at the end of the village Paračov. Here, it connects to a dirt road in k.ú.Kuřimany NCV11. NCV11 dirt road in k.ú.Kuřimany: This is the construction of a new road that starts at 0.00 km free building on a dirt road in NCV7 k.ú.Paračov and make up with her continuous, operational whole. The width of the communication is in the entire length of 4.0 m. Dirt road ends at 0.25343 km connection has already implemented the first phase of construction of this road.

Sewer Řepice - connection to the wastewater treatment plant Strakonice

Obec Řepice | Published September 8, 2015
cpvs

construction of sewerage (DN 300 - gravitational part and PE 90 - Pressure sewerage), 43 manholes, overflows, pumping sump; total length of the proposed new sewerage DN 300 is 1643.5 meters, PE 90 * 8.2 is 116 m

Construction work for multi-dwelling buildings No. 204, 205 and 206 in the street Stavbařů in Strakonice - Phase I (replacement of windows and insulation interwindow inserts)

Město Strakonice | Published September 9, 2015
cpvs

Replacement of windows and insulation inserts interwindow

Modernization of sports facilities TJ Fezko

TJ Fezko Strakonice | Published October 8, 2015
cpvs

The project is implementation of the project of modernization and reconstruction of sports facilities TJ FEZKO. The construction includes: SO 01 Pool: structural modifications of three existing pools of unused created a natural eco-resort with technology continuous water purification biological processes. SO 02 Multipurpose field 36 x 18 m Location: At the site of the existing clay courts will be built modern hard surface playground and sports vodopropustným polyurethane surface for tennis, volleyball and football that will meet current demands and trends. SO 03 Multipurpose field of 30 x 17 m Location: At the site of the existing clay courts will be built modern hard surface playground and sports vodopropustným polyurethane surface for tennis, volleyball and football that will meet current demands and trends. SO 04 Background: After structural modifications will have facilities separate entrance, two separate dressing rooms with separate bathrooms, separate toilet and washing facilities, office and warehouse manager, and a utility room.

Construction of sewerage and sewage treatment plant in the village Sousedovice

Obec Sousedovice | Published August 25, 2015
cpvs

The subject of the public contract is to build a wastewater treatment plant for biological treatment of sewage water quality standard municipal produced within residential whole village Sousedovice. Follow sewer length of about 667.30 meters used for gravity convert wastewater properly tight the pipe system from the site of the existing sewage outfalls in the center of the village, in place of the appropriate cleaning positioned in accordance with the planning documentation village. In parallel with the pipe drains will be constructed water lines' in-1 "plastic HDPE pipes D-110 mm total length of approximately 582.0 meters of which will be the end of a water connection dl. about 15.50 meters for complex waste water treatment plant of plastic PE-HD pipe d-32 mm. It will also be established for complex WWTP connection wiring NN total length of about 530.00 meters to ensure coverage of electricity consumption WWTP site as a whole. Campus WWTP will be fenced, walkable area equipped with concrete interlocking tiles, will be built tarred surface as a service road and exit.

Construction work No. 4 - apartment house

Městys Štěkeň | Published September 2, 2015
cpvs
45454000

Reconstruction of the building of former warehouses and parking technology for residential building and building adjacent parking Reason effectiveness of public contracts pursuant to § 86 par. 2 of Act no. 137/2006 Coll., On Public Procurement, as amended: a) the description needs to be fulfillment of public contracts achieved: improvement of civic amenities in the village and expand housing options in the community; b) a description of the subject of public contract works, respectively. supplies or services relating to the construction work, the subject of the reconstruction of the building of former warehouses and parking on the residential building techniques and construction of an adjacent parking lot; c) a description of the relationship of the public contract and the client's needs: improving civic amenities in the village and expand housing options in the community are urgent needs of the client, and these needs will be met through the implementation of the public contract; d) the expected date of fulfillment of public contracts: III. Q 2016