Public tenders for construction in Strakonice Czech Republic

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

The revitalization of public spaces - parking Podskalská, Strakonice

Město Strakonice | Published October 10, 2014
cpvs

The subject of the public contract is to select a building contractor to implement the project "Revitalisation of public spaces - parking Podskalská, Strakonice." Implementation includes in particular the construction of a paved parking area construction, drainage areas, permanent traffic signs and landscaping.

Field trips Třesovice

Česká republika-Státní pozemkový úřad, KPÚ pro Jihočeský kraj, Pobočka Strakonice | Published January 29, 2016
cpvs
45233000

Realization of the construction of rural roads in k.ú.Třešovice according to project documents prepared in 2012 by Mgr. George Touš. SO 101 Dirt road RCH2 - construction and regulates land no. 1429 in k. U. Třesovice. The length of the proposed rural roads is 1 126.72 meters. SO 102 Dirt road RCV6 - construction and regulates land no. 1418 in the cadastral Třesovice. Length designed dirt track is 1042.94 meters. SO 103 Dirt road RCV7 - construction and regulates land no. 1265 k. Ú. Třesovice. Length designed dirt track is 507.30 meters. SO 104 Dirt road RCV8, NCV5, RCV9, RCV1 Building object contains a total of 4 in the draft dirt roads marked RCV8, NCV5, RCV9 in the cadastral Třesovice and RCV1 in the cadastral Paračov - construction and regulates land no. 1431, 1295, 1288 in the cadastral Třesovice and land no. 2203, 2205 in the cadastral Paračov. The length of the proposed rural roads is 1070.76 meters.

Field trips Měkynec

Česká republika-Státní pozemkový úřad, KPÚ pro Jihočeský kraj, Pobočka Strakonice | Published July 29, 2015
cpvs

The construction of rural roads under the project documentation developed in 2012 by Ing. Jan Touš. The construction includes a building object - Field trips HPC13, HPC15. Construction will be carried out on the land no. 1728, 1023, 1631, 1025 which are intended for the construction of rural roads in the administrative area Měkynec and Krajníčko. Land is located southwest of the village Měkynec. Dirt road is designed as a single-lane connection to the existing asphalt road that connects the village Měkynec. Vertical alignment vertical alignment dirt track is designed with respect to the terrain and surrounding land. The newly designed state follows to a large extent the existing vertical solutions. The whole section is designed base 2.5% unilateral cross slope, which is variable according to the directional arches in the route. Road structure is designed in the following composition: asphalt coating of the 20 mm penetration macadam PM 100 mm gravel vibrated ŠV 200 mm crushed gravel SD 200 mm.

Construction work for multi-dwelling buildings No. 204, 205 and 206 in the street Stavbařů in Strakonice - Phase I (replacement of windows and insulation interwindow inserts)

Město Strakonice | Published September 9, 2015
cpvs

Replacement of windows and insulation inserts interwindow

Rekonatrukce background of a swimming pool - the pool technologies - sand filtration

město Strakonice | Published July 30, 2015
cpvs
42912330

Delivery and installation of new plastic sand filtration and connection to the existing technological distribution, including the dismantling of existing oc. filters. They supplied with further construction work dismantling, supply and installation of filters.

Edit hockey stadium STARZ II, Strakonice

město Strakonice | Published June 25, 2015
cpvs

The delivery will include removal of the existing air-conditioning (HVAC) distribution and installation of new HVAC ventilation for escape routes, air handling units, etc. will also be supplied with a replacement power supply for HVAC and new wiring PA and Emergency Sound. They supplied with further construction work and finishing with penetration of new passages for duct etc.

Vehicles for refuse

Technické služby Strakonice s.r.o. | Published June 3, 2015
Winner
Zoeller Systems s.r.o.
cpvs
34144510

The intention of the contracting authority is a contract under which the successful tenderer on its responsibility and deliver cost by contracting authorities after the conclusion of the subject of performance of this contract (goods), which is the vehicle for municipal waste collection. Its construction and the possibility of using it is a modern and effective technology.

Edit winter stadium STARZ II, Strakonice

město Strakonice | Published February 4, 2015
cpvs
45310000

The delivery is dismantling the existing air conditioning (HVAC) distribution and installation of new HVAC ventilation for escape routes, air handling units, etc. In addition, it will be shipped a replacement power supply for air-conditioning and new wiring PA and Emergency Sound. Supplied with further construction work associated with the penetration and finishing new passages for duct etc.

Edit hockey stadium STARZ II, Strakonice

město Strakonice | Published May 7, 2015
cpvs

The delivery will include removal of the existing air-conditioning (HVAC) distribution and installation of new HVAC ventilation for escape routes, air handling units, etc. will also be supplied with a replacement power supply for HVAC and new wiring PA and Emergency Sound. They supplied with further construction work and finishing with penetration of new passages for duct etc.

Sewer and water treatment plant in Hlupín

Obec Hlupín | Published March 12, 2015
cpvs
45000000

Procured the construction of sewerage in the municipality Hlupín a total length of 1,457 m of plastic PP pipes, including about 49 pieces of public parts of the sewage sewer connections for objects existing buildings of the village, biological wastewater treatment plant production schedules for EO 100, which will be built on the plot. no. 602/2 to Hlupín including utility paved areas and the building operator WWTP facilities. Reason effectiveness of public procurement in accordance with § 1 of Decree 1) description needs to be fulfilling procurement goal of the project is to reduce water pollution from municipal sources, in this case, in the village Hlupín. Sewer network will have such an extent that tap into all the buildings of the area, but also allow for further development. 2) a description of the subject contract This is the construction of a new sewerage system, the total length of 1,457 m sewer. 3) A description of the relationship between the subject contract and the client's needs. Implementation of the construction will completely meet the needs of the contracting authority. 4) the expected due date for the procurement Expected date of fulfillment of public contracts: April 2016

Field trips Paračov for pond

Česká republika-Státní pozemkový úřad | Published January 11, 2016
cpvs

The construction of rural roads under the project documentation drawn up in September 2013 by Ing. George Koplík. The construction includes three buildings: Dirt road RCV6: ​​This is a reconstruction of the existing road, which, together with other major transport routes solved axis east - west on this side of the village. Solved path leads along the edge of the pond Paračovského on one side and the edge of the village on the other side. Editing begins at 0.01091 km connecting local roads repaired under her starting off the road III / 1,423th The width of the entrance road is 4.0 meters along the entire length of the route path. Dirt road ends at 0,400 km, which goes straight dirt road NCV7. Dirt road NCV7: Editing starts at 0.00 km dirt road connecting RCV6 and is its direct continuation. This is according to the plan of joint facilities free kick on the implementation of a new road, but the beginning of the treatment is conducted at the site of the old road up to 0.430 km. Furthermore, until the end of the treatment it is a new dirt road. The width of the communication is in the entire length of 4.0 m. Dirt road ends at 1.06651 km at the end of the village Paračov. Here, it connects to a dirt road in k.ú.Kuřimany NCV11. NCV11 dirt road in k.ú.Kuřimany: This is the construction of a new road that starts at 0.00 km free building on a dirt road in NCV7 k.ú.Paračov and make up with her continuous, operational whole. The width of the communication is in the entire length of 4.0 m. Dirt road ends at 0.25343 km connection has already implemented the first phase of construction of this road.

Field trips Paračov for pond

Česká republika-Státní pozemkový úřad, KPÚ pro jihočeský kraj, Pobočka Strakonice | Published October 7, 2015
cpvs

The construction of rural roads under the project documentation drawn up in September 2013 by Ing. George Koplík. The construction includes three buildings: Dirt road RCV6: ​​This is a reconstruction of the existing road, which, together with other major transport routes solved axis east - west on this side of the village. Solved path leads along the edge of the pond Paračovského on one side and the edge of the village on the other side. Editing begins at 0.01091 km connecting local roads repaired under her starting off the road III / 1,423th The width of the entrance road is 4.0 meters along the entire length of the route path. Dirt road ends at 0,400 km, which goes straight dirt road NCV7. Dirt road NCV7: Editing starts at 0.00 km dirt road connecting RCV6 and is its direct continuation. This is according to the plan of joint facilities free kick on the implementation of a new road, but the beginning of the treatment is conducted at the site of the old road up to 0.430 km. Furthermore, until the end of the treatment it is a new dirt road. The width of the communication is in the entire length of 4.0 m. Dirt road ends at 1.06651 km at the end of the village Paračov. Here, it connects to a dirt road in k.ú.Kuřimany NCV11. NCV11 dirt road in k.ú.Kuřimany: This is the construction of a new road that starts at 0.00 km free building on a dirt road in NCV7 k.ú.Paračov and make up with her continuous, operational whole. The width of the communication is in the entire length of 4.0 m. Dirt road ends at 0.25343 km connection has already implemented the first phase of construction of this road.

Reconstruction of the swimming pool facilities - swimming pool technology - sand filtration

Město Strakonice | Published March 17, 2016
cpvs

The subject of the public contract is the selection of the contractor supplies to the implementation of the "Reconstruction of the swimming pool facilities - swimming pool technology - sand filtration". Transaction involves the supply and installation of new sand filters and connection to the existing technological distribution including demotnáže existing oc. filters. Supplied with further construction work dismantling, supply and installation of filters.

Reconstruction of the swimming pool facilities - swimming pool technology - sand filtration.

Město Strakonice | Published March 22, 2016
Winner
Bazenservis, s.r.o.
cpvs
42912330, 42912350

The subject of the public contract is the selection of the contractor supplies to the implementation of the "Reconstruction of the swimming pool facilities - swimming pool technology - sand filtration". Transaction involves the supply and installation of new sand filters and connection to the existing technological distribution, including the dismantling of existing oc. filters. Supplied with further construction work dismantling, supply and installation of filters.

Water-purifying apparatus

Město Strakonice | Published December 9, 2015  -  Deadline January 27, 2016
cpvs
42912330, 42912350

The subject of the public contract is the choice of supplier deliveries to implement the project "Reconstruction of the swimming pool facilities - swimming pool technology - sand filtration." Transaction involves the supply and installation of a new sand filtration and connection to the existing technological distribution, including the dismantling of existing oc. filters. They supplied with further construction work dismantling, supply and installation of filters.

"Warmth Colleges, Technical High School and Secondary School of Crafts and services, Strakonice"

Vyšší odborná škola, Střední průmyslová škola a Střední odborná škola řemesel a služeb, Strakonice, Zvolenská 934 | Published February 19, 2015
cpvs

The subject of procurement is complex construction projects: "Warmth Colleges, Technical High School and Secondary School of Crafts and services, Strakonice" the extent specified in the project documentation titled "RENOVATION Colleges, Technical High School and Secondary School of Crafts and Services Zvolenska CP. 934 IN STRAKONICE - overall insulation BUILDING ENVELOPE ", including a list of works, supplies and services, compiled by Jiri Urbanek, Frontier 70, Strakonice, date: 10/2014

Reconstruction of the swimming pool facilities - swimming pool technology - sand filtration

Město Strakonice | Published December 4, 2015
cpvs

The subject of the public contract is the choice of supplier deliveries to implement the project "Reconstruction of the swimming pool facilities - swimming pool technology - sand filtration." Transaction involves the supply and installation of a new sand filtration and connection to the existing technological distribution, including the dismantling of existing oc. filters. They supplied with further construction work dismantling, supply and installation of filters. Article 5.3 of the contract agreed price for the work will be paid by the client based on the final invoice issued by the Contractor within 10 days after the completion and acceptance of the works free of defects and backlogs, referred to in the Protocol on readmission. Part of the final invoice, the total inventory of the final statement.

Modernization of sports facilities TJ Fezko

TJ Fezko Strakonice | Published October 8, 2015
cpvs

The project is implementation of the project of modernization and reconstruction of sports facilities TJ FEZKO. The construction includes: SO 01 Pool: structural modifications of three existing pools of unused created a natural eco-resort with technology continuous water purification biological processes. SO 02 Multipurpose field 36 x 18 m Location: At the site of the existing clay courts will be built modern hard surface playground and sports vodopropustným polyurethane surface for tennis, volleyball and football that will meet current demands and trends. SO 03 Multipurpose field of 30 x 17 m Location: At the site of the existing clay courts will be built modern hard surface playground and sports vodopropustným polyurethane surface for tennis, volleyball and football that will meet current demands and trends. SO 04 Background: After structural modifications will have facilities separate entrance, two separate dressing rooms with separate bathrooms, separate toilet and washing facilities, office and warehouse manager, and a utility room.

Field trips Třesovice

Česká republika-Státní pozemkový úřad | Published April 19, 2016
cpvs

Implementation of the construction of footpaths in k.ú.Třešovice according to project documents prepared in 2012 by Mgr. George Touš. SO 101 Dirt road RCH2 - structurally modifies plot no. 1429 in k. Ú. Třesovice. Dirt road is designed as a single-lane with a connection to the existing local road village Třesovice. The length of the proposed field trips is 1 126.72 meters. The trail dirt track is designed as a single-lane road with reinforced shoulder. Lane width is 3.5 m, the curves, the proposed extension. SO 102 Dirt road RCV6 - structurally modifies plot no. 1418 on. Dirt road is designed as a single-lane connected to a dirt road RCH2 a dirt road in the cadastral Jinín. Route dirt track is designed as a single-lane road with reinforced shoulder. Length designed dirt track is 1042.94 meters. The width of the lane is 4.0 meters, the curves, the proposed extension. SO 103 Dirt road RCV7 - structurally modifies plot no. 1265 k. Ú. Třesovice. Dirt road is designed as a single-lane. Length designed dirt track is 507.30 m. Route dirt track is designed as a single-lane paved road without verges. Lane width is 3.5 m, the curves, the proposed extension. SO 104 Dirt road RCV8, NCV5, RCV9, RCV1 Building object contains the proposal for a total of 4 dirt roads marked RCV8, NCV5, RCV9 in the cadastral Třesovice and RCV1 in the cadastral Paračov - construction and regulates land no. 1431, 1295, 1288, in cadastral Třesovice and land no. 2203, 2205 in the cadastral Paračov. The length of the proposed field trips is 1070.76 m. The trail dirt track is designed as a single-lane paved road without verges. Lane width is 3.5 m, the curves, the proposed extension.

Field trips Paračov for pond

Česká republika-Státní pozemkový úřad, Krajský prozemkový úřad pro Jihočeský kraj, Pobočka Strakonice | Published April 24, 2015  -  Deadline November 30, 2016
cpvs
45233000

The construction of rural roads according to project documentation drawn up in September 2013 by Ing. George Koplík. The structure includes three buildings: Dirt road RCV6: ​​This is a reconstruction of existing roads, which together with other major transport routes solved axis east - west on this side of the village. SOLUTION The path runs along the edge of the pond Paračovského on one side and the edge of the village on the other side. The process begins in 0.01091 km connecting local road repaired, under her starting off the road III / 1423rd The width of the entrance road is 4.0 meters along the entire length of the route path. Dirt road ends at 0,400 km, which continues straight dirt road NCV7. Dirt road NCV7: Editing starts at 0.00 km dirt road connecting RCV6 and is its direct continuation. This is according to the plan of common facilities kick on the implementation of the new road, but the beginning of the treatment is conducted at the site of the old road up to 0.430 km. Furthermore, until the end of treatment is a new dirt road. Width of communication is the entire length 4.0 m. Dirt road ends in 1.06651 km at the end of the village Paračov. Here, it connects to a dirt road in NCV11 k.ú.Kuřimany. Dirt road NCV11 in k.ú. Kurimany: This is the construction of a new road that starts at 0.00 km free building on a dirt road in NCV7 k.ú. Paračov and forms with it a coherent, operational unit. Width of communication is the entire length 4.0 m. Dirt road ends in 0.25343 km connection already completed the first phase of this journey.