Public tenders for construction in Strakonice Czech Republic

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction, foundation and surface works for highways, roads

Česká republika – Státní pozemkový úřad, KPÚ pro Jihočeský kraj, Pobočka Strakonice | Published July 31, 2015
Winner
Lesostavby Třeboň a.s.
cpvs
45233000, 71250000

The construction of rural roads under the project documentation developed in 2012 by Ing. Jan Touš. The construction includes a building object - Field trips HPC13, HPC15. Construction will be carried out on the land no. 1728, 1023, 1631, 1025 which are intended for the construction of rural roads in the administrative area Měkynec and Krajníčko. Land is located southwest of the village Měkynec. Dirt road is designed as a single-lane connection to the existing asphalt road that connects the village Měkynec. Vertical alignment vertical alignment dirt track is designed with respect to the terrain and surrounding land. The newly designed state follows to a large extent the existing vertical solutions. The whole section is designed base 2.5% unilateral cross slope, which is variable according to the directional arches in the route. Road structure is designed in the following composition: asphalt coating of the 20 mm penetration macadam PM 100 mm gravel vibrated ŠV 200 mm crushed gravel SD 200 mm.

Construction work No. 4 - apartment house

Městys Štěkeň | Published September 2, 2015
cpvs
45454000

Reconstruction of the building of former warehouses and parking technology for residential building and building adjacent parking Reason effectiveness of public contracts pursuant to § 86 par. 2 of Act no. 137/2006 Coll., On Public Procurement, as amended: a) the description needs to be fulfillment of public contracts achieved: improvement of civic amenities in the village and expand housing options in the community; b) a description of the subject of public contract works, respectively. supplies or services relating to the construction work, the subject of the reconstruction of the building of former warehouses and parking on the residential building techniques and construction of an adjacent parking lot; c) a description of the relationship of the public contract and the client's needs: improving civic amenities in the village and expand housing options in the community are urgent needs of the client, and these needs will be met through the implementation of the public contract; d) the expected date of fulfillment of public contracts: III. Q 2016

Construction of sewerage and sewage treatment plant in the village Sousedovice

Obec Sousedovice | Published April 23, 2015
cpvs

Build a central sewer PP plastic pipes, construction of wastewater treatment plants and repair of local roads in the necessary belt road excavations concerned.

Construction of sewerage and sewage treatment plant in the village Sousedovice

Obec Sousedovice | Published March 5, 2015  -  Deadline September 30, 2016
cpvs
45232400

Construction of a central point of wastewater treatment in the community (WWTP) together with the construction of catchment stem sewers. Reason effectiveness of public contracts pursuant to § 86 par. 2 of the Public Procurement Act: There is no way centralized wastewater treatment, the existing catchment drains into the river outfall is Smiradického stream. There is a considerable burden on the environment, especially the interest outfall sewers in the stream. It is necessary to build tribal sewer, connect the existing sewerage connections, build a wastewater treatment plant with a comprehensive wastewater treatment.

Construction, foundation and surface works for highways, roads

Česká republika – Státní pozemkový úřad | Published April 28, 2016
Winner
Lesostavby Třeboň a.s.
cpvs
45233000

Implementation of the construction of rural roads in the cadastral Klínovice according to project documents prepared in 2012 by Atelier Dopi Ltd. Dirt road C8 - reconstruction of field trips C8 category P4,0 / dl 30. 1 073,69 m k.ú. Klínovice, north of the local area Klínovice. Dirt road is a single-lane, two-way width of 3.5 m + 1 x 0.5 m unpaved shoulder (roadway on the dam is narrowed to 3 m). Field trips C12 in the cadastral Klínovice. It is a new single-lane, dirt roads obousměrnoé category P4,0 / 30th dl. 203 m k.ú. Klínovice, north of the village ponds Klínovice between Small and Great Lake. Road construction purpose roads (dirt track) is designed in the structure: a two-layer coating N DV 20 mm penetration macadam rough PMH 100 mm 150 mm crushed gravel crusher SDB SDB 150 mm.

Construction, foundation and surface works for highways, roads

Česká republika – Státní pozemkový úřad | Published January 14, 2016
Winner
Štolka – Stavko s.r.o.
cpvs
45233000, 71250000

The construction of rural roads under the project documentation drawn up in September 2013 by Ing. George Koplík. The construction includes three buildings: Dirt road RCV6: ​​This is a reconstruction of the existing road, which, together with other major transport routes solved axis east - west on this side of the village. Solved path leads along the edge of the pond Paračovského on one side and the edge of the village on the other side. Editing begins at 0.01091 km connecting local roads repaired under her starting off the road III / 1,423th The width of the entrance road is 4.0 m along the journey route. Dirt road ends at 0,400 km, which goes straight dirt road NCV7. Dirt road NCV7: Editing starts at 0.00 km dirt road connecting RCV6 and is its direct continuation. This is according to the plan of joint facilities free kick on the implementation of a new road, but the beginning of the treatment is conducted at the site of the old road up to 0.430 km. Furthermore, until the end of the treatment it is a new dirt road. The width of the road the entire length of 4.0 m. Dirt road ends at 1.06651 km at the end of the village Paračov. Here, it connects to a dirt road in the cadastral NCV11 Kurimany. NCV11 dirt road in the cadastral Kurimany: This is the construction of a new road that starts at 0.00 km free building on a dirt road in the cadastral NCV7 Paračov and forms with it a coherent, operational unit. The width of the road the entire length of 4.0 m. Dirt road ends at 0.25343 km connection has already implemented the first phase of construction of this road.

Construction, foundation and surface works for highways, roads

Česká republika – Státní pozemkový úřad, KPÚ pro jihočeský kraj, Pobočka Strakonice | Published October 10, 2015  -  Deadline November 3, 2015
cpvs
45233000, 71250000

The construction of rural roads under the project documentation drawn up in September 2013 by Ing. George Koplík. The construction includes three buildings: - Dirt road RCV6: ​​This is a reconstruction of the existing road, which, together with other major traffic routes solved east-west axis on this side of the village. Solved path leads along the edge of the pond Paračovského on one side and the edge of the village on the other side. Editing begins at 0.01091 km connecting local roads repaired under her starting off the road III / 1,423th The width of the entrance road is 4 m wide along the route path. Dirt road ends at 0,400 km, which goes straight dirt road NCV7 - dirt road NCV7: Editing starts at 0.00 km dirt road connecting RCV6 and is its direct continuation. This is according to the plan of joint facilities free kick on the implementation of a new road, but the beginning of the treatment is conducted at the site of the old road up to 0.430 km. Furthermore, until the end of the treatment it is a new dirt road. The width of the road along the entire length of 4 m. Dirt road ends at 1.06651 km at the end of the village Paračov. Here, it connects to a dirt road in the cadastral NCV11 Kurimany - Dirt road NCV11 in the cadastral Kurimany: This is the construction of a new road that starts at 0.00 km free building on a dirt road in the cadastral NCV7 Paračov and forms with it a coherent, operational unit. The width of the road along the entire length of 4 m. Dirt road ends at 0.25343 km connection has already implemented the first phase of construction of this road.

Construction, foundation and surface works for highways, roads

Česká republika – Státní pozemkový úřad, KpÚ pro Jihočeský kraj, Pobočka Strakonice | Published August 27, 2016
Winner
Lesostavby Třeboň a.s.
cpvs

Implementation of the construction of footpaths in k. Ú. Třesovice according to project documents prepared in 2012 by Mgr. George Touš. SO 101 Dirt road RCH2 - structurally modifies plot no. 1429 in k. Ú. Třesovice. Dirt road is designed as a single-lane with a connection to the existing local road village Třesovice. The length of the proposed field trips is 1 126.72 meters. The trail dirt track is designed as a single-lane road with reinforced shoulder. Lane width is 3.5 m, the curves, the proposed extension. SO 102 Dirt road RCV6 - structurally modifies plot no. 1418 v. Dirt track is designed as a single-lane connected to a dirt road RCH2 a dirt road in k. Ú. Jinín. Route dirt track is designed as a single-lane road with reinforced shoulder. Length designed dirt track is 1042.94 meters. The width of the lane is 4.0 meters, the curves, the proposed extension. SO 103 Dirt road RCV7 - structurally modifies plot no. 1265 k. Ú. Třesovice. Dirt road is designed as a single-lane. Length designed dirt track is 507.30 m. Route dirt track is designed as a single-lane paved road without verges. Lane width is 3.5 m, the curves, the proposed extension. SO 104 Dirt road RCV8, NCV5, RCV9, RCV1 Building object contains the proposal for a total of 4 dirt roads marked RCV8, NCV5, RCV9 in k. Ú. Třesovice and RCV1 in k. Ú. Paračov - construction and regulates land no. 1431, 1295 1288 in k. ú. Třesovice and land no. 2203, 2205 in k. ú. Paračov. The length of the proposed field trips is 1070.76 m. The trail dirt track is designed as a single-lane paved road without verges. Lane width is 3.5 m, the curves, the proposed extension.

Construction, foundation and surface works for highways, roads

Česká republika – Státní pozemkový úřad | Published April 23, 2016  -  Deadline May 16, 2016
cpvs
45233000, 71250000

Implementation of the construction of footpaths in k.ú.Třešovice according to project documents prepared in 2012 by Mgr. George Touš. SO 101 Dirt road RCH2 - structurally modifies plot no. 1429 in k. Ú. Třesovice. Dirt road is designed as a single-lane with a connection to the existing local road village Třesovice. The length of the proposed field trips is 1 126.72 meters. The trail dirt track is designed as a single-lane road with reinforced shoulder. Lane width is 3.5 m, the curves, the proposed extension. SO 102 Dirt road RCV6 - structurally modifies plot no. 1418 v. Dirt track is designed as a single-lane connected to a dirt road RCH2 a dirt road in the cadastral Jinín. Route dirt track is designed as a single-lane road with reinforced shoulder. Length designed dirt track is 1042.94 meters. The width of the lane is 4.0 meters, the curves, the proposed extension. SO 103 Dirt road RCV7 - structurally modifies plot no. 1265 k. Ú. Třesovice. Dirt road is designed as a single-lane. Length designed dirt track is 507.30 m. Route dirt track is designed as a single-lane paved road without verges. Lane width is 3.5 m, the curves, the proposed extension. SO 104 Dirt road RCV8, NCV5, RCV9, RCV1 Building object contains the proposal for a total of 4 dirt roads marked RCV8, NCV5, RCV9 in the cadastral Třesovice and RCV1 in the cadastral Paračov - construction and regulates land no. 1431, 1295, 1288, in cadastral Třesovice and land no. 2203, 2205 in the cadastral Paračov. The length of the proposed field trips is 1070.76 m. The trail dirt track is designed as a single-lane paved road without verges. Lane width is 3.5 m, the curves, the proposed extension.

Construction work No. 4 - apartment house

Městys Štěkeň | Published November 9, 2015
cpvs

The subject of public procurement is the reconstruction of the building, which will be used partly for housing, in part, will retain the current operation of parking mobile equipment and warehouse. The newly established the residential building and the rest occasional automobile parking facility will serve the park. The original building with a gable roof has a rectangular, oblong shape with dimensions of 15.39 x 59.55 m, ± 0.0000 = 404,335 m and its ground plan footprint or height of the ridge rebuilding changed. The west side of the building before the entry level 1.NP be parked rectangular shed with dimensions of 6.5 x 5 m, to wheelchair access to 2.NP will be from the north side connected three arms ramp with a slope of 1:16. Building on the new saddle roof with a slope of 20 degrees, entrance canopy will cover flat roofs with a slope of 7 degrees. The proposed building has two floors, located in steep terrain. The slope of the terrain runs from the northwest to the southeast corner of the building. Gable height is 9,145 m relative to floor level 1.NP = 0.0000 = 404.96 m, ridge height of about 8,980 m. Plot designed for construction of parking currently used for occasional parking cars or as a dumping ground. The proposed parking area layout is structured to maximize and according to the investor. Using a gray area will be paved with interlocking tiles, lined with curbs, including connection to the existing road parking. Other parking areas will be backfilled visible stone factions.

Construction of Street Poděbradova, Strakonice

Město Strakonice | Published May 16, 2017
cpvs

Construction of Street Poděbradova, Strakonice

Město Strakonice | Published June 28, 2017
Winner
ROBSTAV stavby k.s.
cpvs

Modernization of the premises ČSAD Strakonice STTRANS Part A - Construction of heat exchanger stations

ČSAD STTRANS a.s. | Published August 15, 2016
cpvs

construction of a new steam pipe connections and exchange stations for heating the building and the establishment of automatic control operation exchanger station in the project scope Tues. The new water-steam pipe will be connected to the existing steam line for a new heat exchanger station, which is adjacent with a connection object. Furthermore, the establishment of automatic control operation exchanger station in the project scope CH (Providing data transmission to a central control room - Extending the existing supervisory control centers). It is a small-scale public contract that is awarded to the Public Procurement Act. According to § 2 e) of the Act no. 320/2001 Coll., On financial control in public administration, as amended, the selected contractor is obliged to cooperate in the performance of financial control.

Construction, foundation and surface works for highways, roads

Česká republika – Státní pozemkový úřad, KPÚ pro Jihočeský kraj, Pobočka Strakonice | Published February 3, 2016
cpvs
45233000, 71250000

Field trips Třesovice.

Construction, foundation and surface works for highways, roads

Česká republika – Státní pozemkový úřad | Published October 13, 2015  -  Deadline November 9, 2015
cpvs
45233000, 71250000

The structure includes four buildings: - Dirt road RCH1: This is a reconstruction of the existing road, which is the main traffic axis east - west on this side of the village. Currently, the road is used only for crossing the creek Cehnickým. Editing starts at 0.00 km connecting road III / 1424 Head of Cehnice to Paračov. The width of the entrance road is 5 m to 0,035 km which will move to a width of 4 m from km 0.060. This width is then valid for the rest of the route. Dirt road ends at 1,200 km. In km 0.54810 left dirt road connects RCV12 and then 0.54910 km dirt road RCV11 - Dirt road NCH1: Editing starts at 0.00 km connecting road III / 1424 Head of Cehnice to Paračov. This is the implementation of new communication with a new connection to said highway. The width of the entrance road is 5 m to 0.04395 km where paces in width 4 meters from 0.06895 km. This width is then valid for the rest of the route. Dirt road ends at 0.50501 km at the junction with Paračovským creek in place of the existing culvert, where after overcoming smoothly continues along the current path has been unused as a way RCV12 - dirt road RCV12: This is a reconstruction of the original dirt roads. Editing begins at 0.50501 km free building on a dirt road NCH1 and forms with it a continuous, operational whole. The width of the road along the entire length of 4 m. Dirt road ends at 0.74718 km connection to the dirt road RCH1 - Dirt road RCV11: This is a reconstruction of the original dirt track, which is currently used only partially. Editing starts at 0.00 km connection to the dirt road RCH1. The width of the road along the entire length of 4 m. Dirt road ends at 0.34736 km connecting local roads in the cadastral Kváskovice.

Construction, foundation and surface works for highways, roads

Česká republika – Státní pozemkový úřad, Krajský prozemkový úřad pro Jihočeský kraj, Pobočka Strakonice | Published April 29, 2015
cpvs
45233000, 71250000

Polní cesty Paračov za rybník.

Construction, foundation and surface works for highways, roads

Česká republika – Státní pozemkový úřad, Krajský pozemkový úřad pro Jihočeský kraj, Pobočka Strakonice | Published April 29, 2015
cpvs
45233000, 71250000

Polní cesty Paračov za vilou.

Construction of sewerage and sewage treatment plant in the village Sousedovice

Obec Sousedovice | Published August 25, 2015
cpvs

The subject of the public contract is to build a wastewater treatment plant for biological treatment of sewage water quality standard municipal produced within residential whole village Sousedovice. Follow sewer length of about 667.30 meters used for gravity convert wastewater properly tight the pipe system from the site of the existing sewage outfalls in the center of the village, in place of the appropriate cleaning positioned in accordance with the planning documentation village. In parallel with the pipe drains will be constructed water lines' in-1 "plastic HDPE pipes D-110 mm total length of approximately 582.0 meters of which will be the end of a water connection dl. about 15.50 meters for complex waste water treatment plant of plastic PE-HD pipe d-32 mm. It will also be established for complex WWTP connection wiring NN total length of about 530.00 meters to ensure coverage of electricity consumption WWTP site as a whole. Campus WWTP will be fenced, walkable area equipped with concrete interlocking tiles, will be built tarred surface as a service road and exit.

Construction work no. 137, street Na Stráži - complete insulation of the building

Město Strakonice | Published May 24, 2017
Winner
ŠVEC s.r.o.
cpvs
45321000

The revitalization of public spaces - parking Podskalská, Strakonice.

Město Strakonice | Published October 15, 2014
Winner
Swietelsky stavební s.r.o.Pražská tř. 495/58České Budějovice 370 04
cpvs
45223300

The subject of the public contract is to select a building contractor to implement the project "Revitalisation of public spaces - parking Podskalská, Strakonice." Implementation includes in particular the construction of a paved parking area construction, drainage areas, permanent traffic signs and landscaping.