City Hall construction of sewerage system

Město Radnice | Published February 17, 2015
cpvs

The subject of the tender is diversion of sewage from the outskirts of the town Hall on the existing WWTP. The total length of the proposed gravity sewer is about 8 km and the length of discharge pipelines is about 2 km. The construction is also the realization of three pumping stations and construction of sewer systems located in public places in the length of about 1.2 km.

Construction of a flood warning and warning system for the City Hall

Město Radnice | Published May 26, 2017
Winner
EMPEMONT s.r.o.
cpvs
45246400

Sewer and WWTP Chlumy

Obec Chlumy | Published November 4, 2015
cpvs

Construction of WWTP for 100 PE, building drains (sewers dl. 1898 m, DN 250, 70 pieces manholes).

"Vejvanov - GO and water feeder" 3 publication

Obec Vejvanov | Published November 10, 2015
cpvs

Procured the construction of a new water treatment plant, as well as the construction of low-voltage connections and repair of the existing intake structure. For this intake structure will be newly constructed water lines that will be raw water pumped from the intake structure to the new water treatment plant. The interception of the object will now be fitted with a pump for pumping raw water into the Central Committee, and will be built here the raw water storage tank. For water treatment, drinking water will be transported through a new supply line, which will be connected to the existing water supply. The subject of the public tender is also operating a water treatment plant for a period of trial operation.

Vejvanov - GO and water feeder

Obec Vejvanov | Published August 27, 2015
cpvs

Procured the construction of a new water treatment plant, as well as the construction of low-voltage connections and repair of the existing intake structure. For this intake structure will be newly constructed water lines that will be raw water pumped from the intake structure to the new water treatment plant. The interception of the object will now be fitted with a pump for pumping raw water into the Central Committee, and will be built here the raw water storage tank. For water treatment, drinking water will be transported through a new supply line, which will be connected to the existing water supply. The subject of the public tender is also operating a water treatment plant for a period of trial operation.

Radenice - sewerage and sewage treatment plant

Obec Radenice | Published February 4, 2016
cpvs

The deliverable is the construction of sewerage and sewage treatment plant for the community Radenice. Implementation of actions will build a treatment plant for EO 150, approximately 1806 m of gravity and about 110 m of pressure sewers with 3 DCs. The delivery also includes the related connections to wastewater treatment plants, sewers branches for a length of approximately 478 mA repair roads after a crosscut. Further details will be in the project tender documents. Performance contracting activities commissioned by: AP INVESTING, sro, Ing. Stanislav Jelinek, Palackého 12, 612 00 Brno. Tender documents can be ordered by writing to the organization responsible for performance contracting activities or by e-mail at: zuzana.kovarova@apinvesting.cz. The order of tender documentation will contain identification information including the candidate. ID data mailbox and contact person. Price for provision of non-text portion ZD - 3025, - CZK including VAT. Price doběrečného in case of delivery by mail - 250 CZK. The sponsor provides restrictions on subcontracting - through subcontractors may not be in the sense of § 44 para. 6 of fulfilling the functions of the site and construction technologist. Any additional requirements for VZ are set out in the tender documentation.

"Vejvanov - GO and water feeder" 3 publication

Obec Vejvanov | Published August 28, 2015
cpvs

Procured the construction of a new water treatment plant, as well as the construction of low-voltage connections and repair of the existing intake structure. For this intake structure will be newly constructed water lines that will be raw water pumped from the intake structure to the new water treatment plant. The interception of the object will now be fitted with a pump for pumping raw water into the Central Committee, and will be built here the raw water storage tank. For water treatment, drinking water will be transported through a new supply line, which will be connected to the existing water supply. The subject of the public tender is also operating a water treatment plant for a period of trial operation. Tenders may be submitted by mail to the address of the contracting authority. Personally then only during office hours on Mondays from 6:00 p.m. to 7:30 p.m. pm. The last day for submission of bids offers can be submitted in person by 9:00 pm at the contracting authority no later than the deadline specified above in point IV.3.4 ). The first publication of this contract is subject to the same performance as the registration number 509636, dated May 6, 2015, was canceled because the deadline for submission of bids was not served the minimum bids set by the rules of Agriculture to five bids. Second publication of this contract is subject to the same performance as the registration number 515917, dated 12/06/2015, was canceled because the authority is excluded from tendering all suppliers infringement qualifications.

Vejvanov - GO and water feeder

Obec Vejvanov | Published March 13, 2015
cpvs
44161200

The water treatment plant will be transported via the drinking water supply of the new series (of approx 440 meters), where the series will be connected to the existing water supply. 1. Description needs to be the fulfillment of public contracts fulfilled: - ensure the supply of quality drinking water villagers Vejvanov - Construction of a new water treatment plant - raising the living standards of the population of the village - to improve municipal infrastructure and create conditions for further development of the community - the fulfillment of the obligations arising from the directives ES - compliance of the project with the Development strategy document municipality 2. Description of the subject contract: The water treatment plant will be delivered drinking water supply with the new series (of approx 440 meters), where the series will be connected to the existing water supply. 3. Description of the relationship between the subject contract and the client's needs: to the building in the village will increase the comfort of living and ultimately will allow further development of the village. 4. Expected due date for the procurement:

Radenice - sewerage and wastewater treatment plants

Obec Radenice | Published November 13, 2015
cpvs
45232400

The deliverable is the construction of sewerage and sewage treatment plant for the community Radenice. Implementation of actions will build a treatment plant for EO 150, approximately 1806 m of gravity and about 110 m of pressure sewers with 3 DCs. The delivery also includes the related connections to wastewater treatment plants, branches for sewers in the length of 478 mA to repair roads crosscut. Further details will be in the project tender documents. Basic need to be filled with the fulfillment of public contracts, is to provide sewage treatment for residents and producers of wastewater in the village. In describing the relationship between the subject matter and the client's needs, it is necessary to emphasize that the municipality has built public sewerage system or sewage treatment plant and waste water often flows out directly into Meadow Brook. The aim of this investment is to improve the environment and protect surface and groundwater contamination. Non-implementation of the contract could be in danger sanctions for endangering the environment. The deliverable is the construction of sewerage and sewage treatment plant for the community Radenice. Implementation of actions will build a treatment plant for EO 150, approximately 1806 m of gravity and about 110 m of pressure sewers with 3 DCs. The delivery also includes the related connections to wastewater treatment plants, branches for sewers in the length of 478 mA to repair roads crosscut. Further details will be in the project tender documents. Completion of works is expected by the end of 2016, but the terms may change due during the tender procedure for the contractor or in connection with the provision of subsidies. Performance contracting activities commissioned: AP INVESTING, sro, Managing Director - Ing. Stanislav Jelinek, Palackého 12, 612 00 Brno.