Call +44 800 9755 164

Public tenders for construction in Prague Czech Republic

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

2. lékařská fakulta Univerzity Karlovy | Published November 30, 2016  -  Deadline December 5, 2016

The subject of the tender is the construction of an educational pavilion 2nd Medical School, Charles University, including the demolition of the building, which is located on the site. The third phase builds on the existing building. The pavilion is currently placed in the office, laboratory, workshop and storage space. Pavilion B is used for educational purposes. There are mainly office and classrooms. The cervix is ​​located sanitary facilities and steel staircase, which connects the individual floors Pavilion B. The project envisages the complete demolition, ie. Including foundation structures. After removing pavilions provide more space for the construction of a new building. Part of the public procurement is a free interior building furniture or laboratory technologies. The Contracting Authority warns that construction work will be carried out under full operation of the surrounding area and the selected candidate will be forced to take action. Exact specifications subject of public procurement and technical conditions are given in the documentation of the technical report and the building permit, which is attached to no. 1 of the tender documents and blank inventory of works, supplies and services with a bill of quantities, which forms Annex. 2 this tender documentation. Detailed specification of the contractor's obligations specified in the contract for work (hereinafter the "Agreement"), which is attached to no. 3 of the tender documents. Its quote divorce candidate by filling in the blank list of works, supplies and services with a statement of measurements.

Motorway construction works

Ředitelství silnic a dálnic ČR | Published October 4, 2016  -  Deadline December 8, 2016

The contract works are the realization of highway D55 Otrokovice bypass JV. Execution of the contract the actual construction is necessary for the construction. The contract is the actual implementation of the highway (construction of the main routes and related buildings). Construction work will be carried out in coordination with the construction supervision and on the request and for the needs of the customer.

Construction work

Dopravní podnik hl. m. Prahy, akciová společnost | Published November 29, 2016  -  Deadline January 3, 2017

The subject of the public contract is, inter alia:

a) modernization of the station escalators in Republic Square, Reg. no. 613-1227-613-1-229;

b) reconstruction of the lobby and the subway;

c) preparation of project documentation and implementation discuss reconciliation with the customer;

d) project documentation of actual construction;

e) a copy of the geodetic survey of the actual condition of the buildings and structures PS incl. runway system;

f) the supply of spare parts during the lifetime of PS ie. min. for 25 years;

g) inspections 1 per year for 8 years with delivery of the report to the condition. Content inspection visit is to check the ingredients listed in the extended warranty with respect to wear.

The subject of the public tender is also providing synergies from the selected supplier in procuring the occupancy permit and put into trial operation and test operation.

Details and specifications subject of this contract is included in the project documentation for the execution of the project, which forms Annex 4 of the tender documentation (the "Project Documents").

Construction work

Dopravní podnik hl. m. Prahy, akciová společnost | Published November 10, 2016  -  Deadline December 9, 2016

The subject of the public contract, in particular:

a) modernization of escalators in the station Karlovo náměstí, ev. no. 613-1-256-613-1-258;

b) reconstruction of the lobby;

c) preparation of project implementation documentation, discussion and approval of the customer;

d) project documentation of actual construction, discussion and approval of the customer;

e) a copy of the geodetic survey of the actual condition of the buildings and structures, including PS runway system;

f) the supply of spare parts during the lifetime of PS ie. min. for 25 years;

g) visits 1x per year for 8 years with delivery of the report to the condition. Content inspection visit is to check the ingredients listed in the extended warranty with respect to wear.

The subject of the public tender is also providing synergies from the selected supplier in procuring the occupancy permit and put into trial operation and test operation.

Details and specifications subject of this contract is included in the project documentation for the execution of the project, which forms Annex no. 4 of the specifications (hereinafter referred to as "Project Documents"). Compared Project documentation is changed speeds PS, according to DIN EN 115-1 + A1, Art. 5.4, paragraph 5.4.1.2.2 on the speed of 0.75 m / s, 8200 persons / hour.

Construction work

Dopravní podnik hl. m. Prahy, akciová společnost | Published November 10, 2016  -  Deadline December 12, 2016

The subject of the public contract is, inter alia:

a) modernization of the station escalators in Republic Square, Reg. č.613-1227-613-1-229;

b) reconstruction of the lobby and the subway;

c) preparation of project documentation and implementation discuss reconciliation with the customer;

d) project documentation of actual construction;

e) a copy of the geodetic survey of the actual condition of the buildings and structures PS incl. runway system;

f) the supply of spare parts during the lifetime of PS ie. min. for 25 years;

g) inspections 1 per year for 8 years with delivery of the report to the condition. Content inspection visit is to check the ingredients listed in the extended warranty with respect to wear.

The subject of the public tender is also providing synergies from the selected supplier in procuring the occupancy permit and put into trial operation and test operation.

Details and specifications subject of this contract is included in the project documentation for the execution of the project, which forms Annex 4 of the tender documentation (the "Project Documents").

Road construction works

Ředitelství silnic a dálnic ČR | Published November 4, 2016  -  Deadline December 19, 2016
Construction of the road I / 68 Tranovice - Nebory category S 24.5 / 100 in length of 6.09 km, incl. GSI two, fourteen bridges, retaining walls, noise walls and utility network and local roads caused by construction.

Road construction works

Ředitelství silnic a dálnic ČR | Published November 25, 2016  -  Deadline December 29, 2016

Construction of the road I / 68 Tranovice - Nebory category S 24.5 / 100 in length of 6.09 km, incl. GSI two, fourteen bridges, retaining walls, noise walls and utility network and local roads caused by construction.

Road construction works

Ředitelství silnic a dálnic ČR | Published November 17, 2016  -  Deadline January 13, 2017

The contract is the construction of a new road I / 58 in the section between Příbor and Skotnica category S 11,5 / 80's. The beginning portion of the building is in front of cutlery, which follows the flyover road I / 58 and D48. The project includes the construction of the bridge, tunnel, retaining walls and utility network.

Road construction works

Ředitelství silnic a dálnic ČR | Published November 11, 2016  -  Deadline December 22, 2016

Construction of the road I / 68 Tranovice - Nebory category S 24.5 / 100 in length of 6.09 km, incl. GSI two, fourteen bridges, retaining walls, noise walls and utility network and local roads caused by construction.

Road construction works

Ředitelství silnic a dálnic ČR | Published December 3, 2016  -  Deadline January 17, 2017

The contract is the construction of a new road I / 58 in the section between Příbor and Skotnica category S 11,5 / 80's. The beginning portion of the building is in front of cutlery, which follows the flyover road I / 58 and D48. The project includes the construction of the bridge, tunnel, retaining walls and utility network.

Road construction works

Ředitelství silnic a dálnic ČR | Published December 7, 2016  -  Deadline January 3, 2017

Construction of the road I / 68 Tranovice - Nebory category S 24.5 / 100 in length of 6.09 km, incl. GSI two, fourteen bridges, retaining walls, noise walls and utility network and local roads caused by construction.

Road construction works

Ředitelství silnic a dálnic ČR | Published October 4, 2016  -  Deadline January 10, 2017

The contract is the construction of a new road I / 58 in the section between Příbor and Skotnica category S 11,5 / 80's. The beginning portion of the building is in front of cutlery, which follows the flyover road I / 58 and D48. The project includes the construction of the bridge, tunnel, retaining walls and utility network.

Road construction works

Ředitelství silnic a dálnic ČR | Published September 24, 2016  -  Deadline December 12, 2016

Construction of the road I / 68 Tranovice - Nebory category S 24.5 / 100 in length of 6.09 km, incl. GSI two, fourteen bridges, retaining walls, noise walls and utility network and local roads caused by construction.

Bridge construction work

Středočeský kraj | Published November 15, 2016  -  Deadline December 5, 2016

The subject of procurement is rerouting the road II / 331 before the village Sojovice a new bridge over the Jizera. The new bridge is located about 100 meters south of the existing bridge. The old bridge will be demolished after the construction and relocation of the adjacent roadway reclaimed.

Bridge construction work

Středočeský kraj | Published December 6, 2016  -  Deadline December 12, 2016

The subject of procurement is rerouting the road II / 331 before the village Sojovice a new bridge over the Jizera. The new bridge is located about 100 meters south of the existing bridge. The old bridge will be demolished after the construction and relocation of the adjacent roadway reclaimed.

Road construction works

Ředitelství silnic a dálnic ČR | Published October 4, 2016  -  Deadline December 8, 2016

The contract is the construction of II. phase of the ring road Frydek-Mistek. It is a new four-lane divided highway in the direction Cat. R 25.5 / 120 in length of 4,366 km. The construction of roads, and utilities.

Railway construction works

Správa železniční dopravní cesty, státní organizace | Published November 29, 2016  -  Deadline December 15, 2016

The contract is the realization of the project "Optimization of the railway section Prague Hostivař - Prague Main. n., II. part - Prague Hostivař - Prague Main. n. ".

Construction interferes necessary modifications trackside signaling equipment and media networks to other tracks on the Prague-Krc, Praha hl. on Prague Vysehrad.

Further specification of the subject of the public contract is made in other parts of the tender documents.

Railway construction works

Správa železniční dopravní cesty, státní organizace | Published November 15, 2016  -  Deadline December 9, 2016

The contract is the realization of the project "Optimization of the railway section Prague Hostivař - Prague Main. n., II. part - Prague Hostivař - Prague Main. n. ".

Construction interferes necessary modifications trackside signaling equipment and media networks to other tracks on the Prague-Krc, Praha hl. on Prague Vysehrad.

Further specification of the subject of the public contract is made in other parts of the tender documents.

Road construction works

Ředitelství silnic a dálnic ČR | Published November 25, 2016  -  Deadline December 1, 2016

Northeast bypass Krnova the newly proposed roads in the category with 11.5 / 80, which includes the relocation of existing roads I / 57 (Opava-Krnov-Bartultowice) outside the city center Krnova to define the transit traffic from the city center. The length of treatment bypass road I / 57 is 7,764 km, the number of bridges - 10th The construction of the induced relocation of utilities and transport infrastructure.

Road construction works

Česká republika – Ministerstvo financí | Published October 20, 2016  -  Deadline December 8, 2016
The project involves the construction of access roads and utilities infrastructure backbone for providing access to the area emerging Lakes Bridge. Detail is the subject of performance defined in the project documentation, "Lake Most- connection to communication and IS - Part I, II, III" treatment by Mining Projects Teplice as Kollárova 11, 415 36 Teplice and Artech, spol. s ro, Dušní 112/16, 110 00 Praha first