Public tenders for construction in Police Czech Republic

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work for fire-fighting police Police nad Metují

Město Police nad Metují | Published August 28, 2017
Winner
MOVIS Hronov, s.r.o.
cpvs

Construction and extension of Art School in Policka nad Metují No. 108 - 3rd stage

Město Police nad Metují | Published November 9, 2017
Winner
MATEX HK s.r.o.
cpvs

Completion of sewers - Police nad Metují - local part Záměstí

Město Police nad Metují | Published July 12, 2016
cpvs
45232400

Procured the works and related supplies and services associated with the construction of sewers, where new sewer lines connected to the existing sewerage system in the city and wastewater will be diverted to the local sewage treatment plant. Construction of sewers A.1 and B requires relocation of the water main, which lies on the route of the newly designed sewer system. Furthermore sewer construction includes AA, A, A1.1, A1.2.

Sewerage and sewage treatment plant municipality Police - II. phase

Obec Police | Published April 20, 2015
cpvs

The subject of procurement is "Sewerage and sewage treatment plant municipality Police - II. Stage," according to project documentation, which is attached to no. 2 of the tender documentation. The subject of the tender is further specified in clause 3.1.2. tender documentation. The scope of the subject contract is specified in clause 3.2.1. and 3.2.2. tender documentation. Other rights and obligations of the implementation of public procurement stemming from the compulsory draft contract for work, which is attached to no. 3 of the tender documentation. Public contract will be co-financed by the Ministry of Agriculture under the program 129 250 - Construction and technical evaluation of water supply and sewerage infrastructure, subroutine 129 253 - Supporting the construction of infrastructure and technical improvements of public sewerage. Implementation of procurement is subject to the grant of subsidies by the grant (see the provisions of Section 5.3.3. Tender documentation). An applicant submitting a bid agrees that if the subsidy is not granted, it will not implement a public contract, without the right to compensation for any costs. The sponsor does not pay the applicants costs arising from participation in the proceedings. Sponsor canceled without delay the procedure if the events in accordance with § 84 par. 1 PPA. The contracting authority may, without undue delay, cancel the tender in accordance with § 84 par. 2 of the PPA and the provisions of § 84 para. 3 point. b) the PPA.

Sewerage and sewage treatment plant municipality Police - II. phase

Obec Police | Published April 7, 2015
cpvs
45232400

Police at the Wallachian Meziříčí. Part of the Public Procurement these buildings: SO 01 Sewerage A - gatherer A, A1, A2, A3, A5 SO 02 Sewerage B - collector B, B2, B3 SO 03 Sewerage C - C4 collector, preposition F 04 SO Wastewater sewer D, CS1 - collector D, D1, CS1 and discharge lines V1 SO 06 Connection NN to CS1 SO 09 Extrusions under state roads description needs to be the fulfillment of public contracts fulfilled: In II. stage will be completed and the sewers with a total length of 1859.0 meters, sewer branching total length of 251.0 meters, pumping stations CS1 connection with NN and the Council in the discharge length of 268.0 mA pushing the two state roads. Description of the subject of the tender: Police at the Wallachian Meziříčí. Part of the Public Procurement these buildings: SO 01 Sewerage A - gatherer A, A1, A2, A3, A5 SO 02 Sewerage B - collector B, B2, B3 SO 03 Sewerage C - C4 collector, relaying F 04 SO Wastewater sewer D, CS1 - collector D, D1, CS1 and discharge řadV1 SO 06 Connection NN to CS1 SO 09 Extrusions under state roads 2). Completion justification effectiveness of procurement section II.8): Description of relationship of the public contract and the client's needs: the public contract will be connected to the existing sewer system built in the first stage of construction. At the same time improve the environment in the village where they sewage water from all solved Realty drained and disposed of environmentally friendly way than is presently the case. Expected date of fulfillment of Procurement: Public procurement should be met by the end of 2016.
  • 1