Call +44 800 9755 164

Public tenders for construction in Olomouc Czech Republic

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Stand construction company OLTIS Group as at fair Transport Logistic 2017 in Munich

OLTIS Group a.s. | Published March 6, 2017
cpvs
79340000

Machinery for the treatment of sewage

Statutární město Olomouc | Published March 25, 2017  -  Deadline April 18, 2017
cpvs
42996000

Replacement machinery sewage treatment plant (WWTP) in Olomouc, including editing process pipelines and electrical equipment parts, construction work and ventilation. An integral part of the work is to perform individual tests, comprehensive testing work, including completion of all certifications, inspections and measurements before completing the work.

Center for Kinanthropology Research FTK UP Olomouc - Neředín (SO.01 Renovation - Building a)

Univerzita Palackého v Olomouci-Fakulta tělesné kultury | Published October 16, 2015  -  Deadline June 30, 2017
cpvs
45214420

Subject to limit public works contracts is the realization of a building "SO.01 Renovation - Building a" Faculty of Physical Culture Palacky University in Olomouc. This is the renovation and extension of the former laundry into the building, which will primarily act as a teaching space and office space for teachers and students of the faculty. Built-up area is 854.13 square meters, total building height above the surrounding terrain is 12.1 to 15.73 m. 1st floor main space is a biomechanical lab and adjoining office. 2nd floor also includes a soundproof kabina.V this floor is the central server room. 3rd floor in the central block are then proposed three seminar rooms with shared operational facilities. 4th floor around the perimeter of floors are common workroom for teachers. Construction of the project documentation is divided into the following construction and engineering buildings: Building objects: SO.01 Reconstruction - building and engineering objects: SO.05 HTU, land preparation SO.07 Communications, paved areas, walkways SO.08.1 Campus storm sewer SO.12 Outdoor lighting SO.16 Areal Landscaping Grounds effectiveness of public Contracting Authority is currently undertaking the construction of three buildings application centralization Balu Faculty of Physical Culture, Palacky University in Olomouc, and it SO.02 Balu - building b - connecting corridor, SO.03 testing hall - building ca SO.04 test pool - building d. To complement the newly built campus into a functional unit is to be strictly implemented object SO.01 Reconstruction - a building, the Center for Kinanthropology Research. Without the realization of this object would be another building and the whole area were unable to properly fulfill its function. • Description of the public procurement This is a total of three floors above ground building with a partial basement that arises construction reconstruction and rebuilding of the former laundry. Further specification of works, services and supplies is stated in the previous paragraph "A brief description of the subject and scope of works." • A description of the relationship between the subject of public procurement and construction of the client's needs SO.01 Reconstruction - building and, Kinanthropology Research Centre will be a necessary complement of the entire complex into its final form and to ensure its design function. Given that the authority does not have the necessary technology nor sufficient number of professional staff to ensure the objectives of its own resources, will form the tender procedure provided by an external contractor of construction works.

Machinery for the treatment of sewage

statutární město Olomouc | Published March 8, 2017  -  Deadline April 10, 2017
cpvs
42996000

Replacement machinery sewage treatment plant (WWTP) in Olomouc, including editing process pipelines and electrical equipment parts, construction work and ventilation. An integral part of the work is to perform individual tests, comprehensive testing work, including completion of all certifications, inspections and measurements before completing the work.

The scope of works, supplies and services is given in the project documentation and inventory of works, supplies and services with a statement of measurements that are part of the tender documentation.

Pension for pensioners Loštice - Reconstruction of sanitary units

Olomoucký kraj | Published September 21, 2015  -  Deadline August 31, 2017
cpvs
45454100

The subject of the public contract, the construction work on the reconstruction of 41 cores (demolition of existing nuclear incl. Installation and risers, divorce HVAC is the asbestos removal spreading layers of flooring, lining new walls, concreting new floors, new installations, wall and floor surfaces of PVC , supply of sanitary ware and joinery) and corridors (remove existing wallcoverings, delivery of new handrails and protective bands, reconstruction of high-voltage wiring throughout the building, reconstruction of water distribution on the 1st floor and part 1.NP solutions adjustments according to the fire report ( backup power lift local detakce fire, strengthening hydrants, exchange of fire doors escape routes etc.). Throughout the pension for retired Loštice. In addition, relocation of the power of the camera system and the relocation amplifiers STA. Reason effectiveness of public procurement: Description of the public contract: The subject of the public orders the construction work on the reconstruction of 41 cores (demolition of existing nuclear incl. installation and risers, divorce HVAC is the asbestos removal spreading layers of flooring, lining new walls, concreting new floors, new installations, wall and floor surfaces PVC supply sanitary ceramics and woodwork) and corridors (remove existing wallcoverings, delivery of new handrails and protective bands, reconstruction of high-voltage wiring throughout the building, reconstruction of water distribution on the 1st floor and part 1.NP solutions for adjustments under fire reports (uninterruptible power lift , local detakce fire hydrants strengthening, exchange of fire doors and escape routes.) Throughout the pension for retired Loštice. Furthermore, the relocation of the camera system and power amplifiers STA relocation. Description of the relationship of the public contract and the client's needs: Implementation of the contract will increase the quality of living of users of social services with direct impact on the quality of social services, which is in line with the needs of the client.
  • 1