Call +44 800 9755 164

Public tenders for construction in Olomouc Czech Republic

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work for highways, roads

Olomoucký kraj | Published February 16, 2017  -  Deadline March 17, 2017
cpvs
45233100, 45233120, 45221100, 71250000

The contract is construction work road no. II / 433 in urban areas and etravilánech between the town of Prostejov and municipalities Maurice. Solved stretch begins at the intersection butt in the street Wolkerova in Prostejov and ends at the village Moritz at the connecting branches flyover before the bridge over the highway D1. The route is not solved continuous piece, but is divided into four unrelated forms of sections, said sections comprise more buildings. The total length together all four sections dealt with the repair of the road II / 433 is 11,569 km.

Detailed scope of construction and assembly work, which requires the sponsor to realize, is further specified in the Project, the list of works and bills of quantities. The subject of the public contract includes:

1) Conduct of construction by building permits and projects;

2) Development of geodetic surveying surveyor responsible, including the plat confirmed cadastre and title of surveyor on site;

3) completion of related works, supplies and activities.

Works for complete or part construction and civil engineering work

Univerzita Palackého v Olomouci | Published February 7, 2017  -  Deadline March 13, 2017
cpvs
45200000, 45233100, 45213312, 45231000, 45232000, 45233160

This is the first stage of the overall revitalization of roads, paved areas, green spaces and technical infrastructure that campus. 

This is the first stage of the overall revitalization of roads, paved areas, green spaces and technical infrastructure that campus.

Furthermore, the panel will be reconstructed road south of greenhouses RC2 and RD2, which will also be linked with a pedestrian zone, between objects, 52-53 and 52-51.

Also includes land preparation and eliminate all unneeded underground lines.

The subject of the tender is also complete and perfect execution of all activities related to the implementation of the contract, such as. The construction site facilities, disposal of generated waste, performing all related testing and inspection, disposal site facility after work completion and commissioning of all surfaces affected by construction and assembly operations in original state.

499/2006 Coll., On construction documentation, as amended, including geodetic survey of the actual execution of all construction and engineering buildings and separating geometric plan for parcels with a different way of using and ensure all inspection approval.

Construction Training Centre

Stavitelství Pospíšil s.r.o. | Published February 15, 2017  -  Deadline March 13, 2017
cpvs
45000000

Stand construction company OLTIS Group as at fair Transport Logistic 2017 in Munich

OLTIS Group a.s. | Published February 16, 2017
cpvs
79340000

Stand construction company OLTIS Group as at fair Transport Logistic 2017 in Munich

OLTIS Group a.s. | Published February 23, 2017  -  Deadline March 15, 2017
cpvs
79340000

Road-repair works

Správa silnic Olomouckého kraje, příspěvková organizace | Published January 27, 2017  -  Deadline February 28, 2017
cpvs
45233142, 45221119, 71250000

The contract is the execution of construction works under the project. Project documentation (project) is processed in the degree of documentation for construction (DPS), which was necessary for the tender documents is regulated in accordance with the law in the form in which they are components, materials and products generally specified by technical parameters.

Details of the description of the subject contract will be provided in the tender documentation for submission of bids.

Center for Kinanthropology Research FTK UP Olomouc - Neředín (SO.01 Renovation - Building a)

Univerzita Palackého v Olomouci-Fakulta tělesné kultury | Published October 16, 2015  -  Deadline June 30, 2017
cpvs
45214420

Subject to limit public works contracts is the realization of a building "SO.01 Renovation - Building a" Faculty of Physical Culture Palacky University in Olomouc. This is the renovation and extension of the former laundry into the building, which will primarily act as a teaching space and office space for teachers and students of the faculty. Built-up area is 854.13 square meters, total building height above the surrounding terrain is 12.1 to 15.73 m. 1st floor main space is a biomechanical lab and adjoining office. 2nd floor also includes a soundproof kabina.V this floor is the central server room. 3rd floor in the central block are then proposed three seminar rooms with shared operational facilities. 4th floor around the perimeter of floors are common workroom for teachers. Construction of the project documentation is divided into the following construction and engineering buildings: Building objects: SO.01 Reconstruction - building and engineering objects: SO.05 HTU, land preparation SO.07 Communications, paved areas, walkways SO.08.1 Campus storm sewer SO.12 Outdoor lighting SO.16 Areal Landscaping Grounds effectiveness of public Contracting Authority is currently undertaking the construction of three buildings application centralization Balu Faculty of Physical Culture, Palacky University in Olomouc, and it SO.02 Balu - building b - connecting corridor, SO.03 testing hall - building ca SO.04 test pool - building d. To complement the newly built campus into a functional unit is to be strictly implemented object SO.01 Reconstruction - a building, the Center for Kinanthropology Research. Without the realization of this object would be another building and the whole area were unable to properly fulfill its function. • Description of the public procurement This is a total of three floors above ground building with a partial basement that arises construction reconstruction and rebuilding of the former laundry. Further specification of works, services and supplies is stated in the previous paragraph "A brief description of the subject and scope of works." • A description of the relationship between the subject of public procurement and construction of the client's needs SO.01 Reconstruction - building and, Kinanthropology Research Centre will be a necessary complement of the entire complex into its final form and to ensure its design function. Given that the authority does not have the necessary technology nor sufficient number of professional staff to ensure the objectives of its own resources, will form the tender procedure provided by an external contractor of construction works.

Pension for pensioners Loštice - Reconstruction of sanitary units

Olomoucký kraj | Published September 21, 2015  -  Deadline August 31, 2017
cpvs
45454100

The subject of the public contract, the construction work on the reconstruction of 41 cores (demolition of existing nuclear incl. Installation and risers, divorce HVAC is the asbestos removal spreading layers of flooring, lining new walls, concreting new floors, new installations, wall and floor surfaces of PVC , supply of sanitary ware and joinery) and corridors (remove existing wallcoverings, delivery of new handrails and protective bands, reconstruction of high-voltage wiring throughout the building, reconstruction of water distribution on the 1st floor and part 1.NP solutions adjustments according to the fire report ( backup power lift local detakce fire, strengthening hydrants, exchange of fire doors escape routes etc.). Throughout the pension for retired Loštice. In addition, relocation of the power of the camera system and the relocation amplifiers STA. Reason effectiveness of public procurement: Description of the public contract: The subject of the public orders the construction work on the reconstruction of 41 cores (demolition of existing nuclear incl. installation and risers, divorce HVAC is the asbestos removal spreading layers of flooring, lining new walls, concreting new floors, new installations, wall and floor surfaces PVC supply sanitary ceramics and woodwork) and corridors (remove existing wallcoverings, delivery of new handrails and protective bands, reconstruction of high-voltage wiring throughout the building, reconstruction of water distribution on the 1st floor and part 1.NP solutions for adjustments under fire reports (uninterruptible power lift , local detakce fire hydrants strengthening, exchange of fire doors and escape routes.) Throughout the pension for retired Loštice. Furthermore, the relocation of the camera system and power amplifiers STA relocation. Description of the relationship of the public contract and the client's needs: Implementation of the contract will increase the quality of living of users of social services with direct impact on the quality of social services, which is in line with the needs of the client.
  • 1