Public tenders for construction in Kopidlno Czech Republic

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Storm sewer and surface reconstruction in the streets of camshafts and Hilmarovo in Kopidlno

Město Kopidlno | Published September 14, 2016
cpvs

The subject of the tender is the construction of sewage and storm sewers in the street Vackova and construction of sewerage in the street Hilmarovo. In both of these streets will also surface reconstruction. Closer is the subject of a public contract described in the documentation "storm sewer in the streets of camshafts and Hilmarovo in Kopidlno," compiled by Vodohospodářsko-engineering services spol. s ro, ID 48153362, and project documentation for "Reconstruction ul. Vackova and Hilmarovo in Kopidlno" developed by Ing. Joseph Zima, identification number 16,236,351th Both project documents are attached to the tender documentation. The delivery is the focus of actual construction and development of documentation of actual construction. Construction work will be carried out for two different sponsor, under two different contracts for work. List of works, supplies and services with a statement of measurements (blind budget) with this division counts. It is not a public contract is divided into parts, but only one contract, assuming a general contractor.

Water supply Cholenice

OBEC CHOLENICE | Published May 7, 2015  -  Deadline October 30, 2016
cpvs
44161200

Construction of water supply system is designed to land in the cadastral Cholenice and will serve to supply the population of the municipality Cholenice quality drinking water. The construction includes the construction of a major water meter pits, water pipes, water meter shafts before the main overground hydrant, connection to the main plant. shaft. The proposed water supply will be connected to group water Kopidlno. From an existing reservoir into the pit beneath the reservoir fed pipes terminating cap. At this point, create a new armature shaft with water meter and starts the supply lines and the municipality. The entire building is designed in communications, either directly or within their reach. Description needs to be the fulfillment of public contracts achieved: The purpose of the construction is to ensure the supply of drinking water. Implementation of this contract will also solve supply the village with water Cholenice fire. The assumption that the project "Water Cholenice" will be implemented under the Ministry of Agriculture 129 250 Construction and technical evaluation of water supply and sewerage infrastructure, the program 129 252 - Support for the construction of infrastructure and technical improvements of public water supply.

Sewer and WWTP Jičíněves

Obec Jičíněves | Published July 12, 2016
cpvs

The subject of the public contract, the construction work associated with the construction of a new wastewater treatment plant (WWTP) with a capacity of 400 EO on the southern outskirts Jičíněves, construction of a gravity sewer in the length of 2 676.42 m, water connection to the sewage treatment plant in the length of 168.85 meters, water lines to the treatment plant in the length of 87.72 meters, pumping stations and sewer discharge in the area of ​​wastewater treatment plants, runoff and bypass WWTP WWTP site, access road to the WWTP length of 232 mA NN connections to the WWTP length of 305 m. the subject of the public contract are further building work associated with construction of the sewer connections for each property in the village Jičíněves. In the context of the public tender will be selected bidder to implement only part of the connections, ie. After the connections of the public sewer system, completed approximately 1 m beyond the land in question and the connected real estate. Total will be the subject of public contract 52 m of pressure sewers, 258 m of gravity sewers DN 150 and 154 m of gravity sewers DN 200. Public procurement is funded by the Ministry of Agriculture under the program 129 250 "Construction and technical evaluation of infrastructure, water supply and sewerage, by the Hradec Kralove region and also from its own resources outsourcer.

Storm sewer and surface reconstruction in the streets of camshafts and Hilmarovo in Kopidlno

Město Kopidlno | Published May 11, 2016
cpvs
45231300

The subject of the tender is the construction of sewage and storm sewers in the street Vackova and construction of sewerage in the street Hilmarovo. In both of these streets will also surface reconstruction. a) the description needs to be the fulfillment of public contracts achieved: By meeting the public contract will solve sewage and rainwater drains in these city streets Kopidlno. It will also be dealt with also do not meet the condition of roads in this area. Construction of sewerage and surface reconstruction of streets will meet the client's needs. b) a description of the subject contract: The subject of the tender is the construction of sewage and storm sewers in the street Vackova and construction of sewerage in the street Hilmarovo. In both of these streets will also reconstruction of road surfaces and pavements. c) a description of the relationship between the subject contract and the client's needs: New drainage of the streets will fulfill the requirements for collection and discharge of sewage and rainwater, and thus improve the overall condition of the site. Reconstruction of roads and pavements will improve transport accessibility and improve living conditions of the affected area. d) the anticipated date of the fulfillment of public contracts: Sponsor assumes deadline for fulfilling the first part of the public contract to December 31, 2016 and the expected deadline for fulfilling the remaining portions of public contracts until 31 December 2017.

Water supply Cholenice

OBEC CHOLENICE | Published June 18, 2015
cpvs

The offer addresses the supply of inhabitants Cholenice quality drinking water. The construction includes the construction of a major water meter pits, water pipes, water meter shafts before the main overground hydrant, connection to the main plant. shaft. The proposed water supply will be connected to group water Kopidlno. From an existing reservoir into the pit beneath the reservoir fed pipes terminating cap. At this point, create a new armature shaft with water meter and starts the supply lines and the municipality. The entire building is designed in communications, either directly or within their reach. Description needs to be the fulfillment of public contracts achieved: The purpose of the construction is to ensure the supply of drinking water. Implementation of this contract will also solve supply the village with water Cholenice fire. The assumption that the project "Water Cholenice" will be implemented under the Ministry of Agriculture 129 250 Construction and technical evaluation of water supply and sewerage infrastructure, the program 129 252 - Support for the construction of infrastructure and technical improvements of public water supply. The sponsor will be forced to cancel the tender according to § 84 par. 2 point. e) the PPA if they receive less than 5 bids or bids left after assessing the ratings of less than 5 offers.

"Water Cholenice"

OBEC CHOLENICE | Published October 20, 2015
cpvs

The offer addresses the supply of inhabitants Cholenice quality drinking water. The construction includes the construction of a major water meter pits, water pipes, water meter shafts in front of the main overground hydrant, connection to the main plant. shaft. The proposed water supply will be connected to group water Kopidlno. From an existing reservoir into the pit beneath the reservoir fed pipes terminating cap. At this point, create a new armature shaft with water meter and starts the supply lines and into the village. The entire building is designed in communications, either directly or within their reach.

Water mains

Obec Cholenice | Published October 22, 2015
Winner
Stavoka Kosice, a.s.
cpvs
44161200, 45231300

The offer addresses the supply of inhabitants Cholenice quality drinking water. The construction includes the construction of a major water meter pits, water pipes, water meter shafts in front of the main overground hydrant, connection to the main plant. shaft. The proposed water supply will be connected to group water Kopidlno. From an existing reservoir into the pit beneath the reservoir fed pipes terminating cap. At this point, create a new armature shaft with water meter and starts the supply lines and into the village. The entire building is designed in communications, either directly or within their reach.

Water mains

Obec Cholenice | Published June 20, 2015  -  Deadline July 13, 2015
cpvs
44161200, 45231300

The offer addresses the supply of inhabitants Cholenice quality drinking water. The construction includes the construction of a major water meter pits, water pipes, water meter shafts before the main overground hydrant, connection to the main plant. shaft. The proposed water supply will be connected to group water Kopidlno. From an existing reservoir into the pit beneath the reservoir fed pipes terminating cap. At this point, create a new armature shaft with water meter and starts the supply lines and the municipality. The entire building is designed in communications, either directly or within their reach.

Sewer and WWTP Jičíněves

Obec Jičíněves | Published May 19, 2016
cpvs
45000000

The contract is the construction of a new wastewater treatment plant with a capacity of 400 EO on the southern outskirts Jičíněves, construction of a gravity sewer in the length of 2 676.42 m, water connection to the sewage treatment plant in the length of 168.85 meters, the water lines to the treatment plant in the length of 87.72 m, gas station and the sewage discharge in the area of ​​wastewater treatment plants, runoff and bypass WWTP WWTP site, access road to the WWTP length of 232 mA NN connections to the WWTP length of 305 m. Reason effectiveness of public procurement for the purposes of pre-notification of the contracting authority under § 1 PPA: a) Description of supplies to be the fulfillment of public contracts achieved: the client's needs is the disposal of waste water, reducing water pollution from municipal sources, support construction and technical improvement of infrastructure in the village sewer system for public use; . b) A description of the subject contract: The subject of the public contract works, respectively. supplies or services relating to the construction works associated with the construction of sewerage systems and wastewater treatment plants for public use is associated with sewage disposal. c) A description of the relationship between the subject contract and the client's needs: contractor selection and implementation of public procurement "Sewer and WWTP Jičíněves" will fulfill the needs identified above. d) Expected date of fulfillment of the public contract is 08/2017 - see II.6) this form. The project will be financed by the Ministry of Agriculture.

Storm sewer and surface reconstruction in the streets of camshafts and Hilmarovo in Kopidlno

Město Kopidlno | Published June 27, 2016
cpvs

In both of these streets will also surface reconstruction. Joseph Zima, identification number 16,236,351th Both project documents are attached to the tender documentation. The delivery is the focus of actual construction and development of documentation of actual construction. It is not a public contract is divided into parts, but only one contract, assuming a general contractor. Contract is awarded by contracting authorities Association, whose members include City Kopidlno, Kopidlno, square Hilmarovo 13, zip code 507 32, ID 00271705 and Water Management and the company, as on the capsule 428, 506 01 Jicin, identification number 60,109,149th 6 of the right that a substance defined part, as defined below, of the public contract may not be filled subcontractor. The principal determines that the following work should be carried out by a subcontractor: Vackova Vackova - SO_01.2 Relocation tap Vackova rest of the public contract is financed by own resources, the contracting authority.

Water supply Budčeves II. phase

OBEC BUDČEVES | Published November 24, 2015
cpvs

Water supply Budčeves II. Phase builds on the already completed the first part of which was modified water source, the current pressure station has been converted to a water treatment plant with accumulation. From the Central Committee of the displacement of the water is pumped to the new tower reservoir with 60 m 3. Water from the water tower flows through gravity pipeline towards the village Budčeves and fencing spring with the Central Committee and the reservoir is temporarily not connected to pipes that are not public water supply. At this point starts II. Stage tap Budčeves construction of distribution mains (including connections) after the village Budčeves. Submitter according to § 44 paragraph (6) PPA requires that the applicant has specified in its tender of public contracts, which it intends to enter another or more subcontractors, and to give identifying information for each subcontractor. The Contracting Authority reserves the requirement that the construction of water supply system may not be filled subcontractor. The applicant shall submit an affidavit pursuant to § 68 par. 3 of the Act. Other conditions are specified in the tender documents.

Water supply Budčeves II. phase

OBEC BUDČEVES | Published March 2, 2016
cpvs

Water supply Budčeves II. phase builds on the already completed the first part of which was modified water source, the current pressure station has been converted to a water treatment plant with accumulation. From the Central Committee of displacement water is pumped to the new tower tank with a content of 60 m3. Water flows from a water tower gravity pipeline towards the village Budčeves and fencing spring with GO and the reservoir is temporarily not connected to pipelines that are not public water supply. At this point begins II. Phase tap Budčeves construction of distribution lines (including connections) after village Budčeves.

Water supply Budčeves II. phase

OBEC BUDČEVES | Published July 8, 2015  -  Deadline November 30, 2016
cpvs
45200000

Water supply Budčeves II. stage builds on the already completed the first part of which was modified water source, the current pressure station has been converted to a water treatment plant with accumulation. For CC water is pumped to the displacement tank with a new tower of 60 m 3. Water flows from a water tower gravity pipeline towards the village Budčeves and fencing spring with GO and the reservoir is temporarily not connected to pipes that are not public water supply. At this point starts II. Stage tap Budčeves building distribution mains (including connections) the municipality Budčeves. 1. Description of requirements to be fulfilled by meeting the public contract construction of a new aqueduct will meet the needs of residents of the village Budčeves supply quality drinking water. 2. Description of the subject contract Water Budčeves II. stage builds on the already completed the first part of which was modified water source, the current pressure station has been converted to a water treatment plant with accumulation. For CC water is pumped to the displacement tank with a new tower of 60 m 3. Water flows from a water tower gravity pipeline towards the village Budčeves and fencing spring with GO and the reservoir is temporarily not connected to pipes that are not public water supply. At this point starts II. Stage tap Budčeves building distribution mains (including connections) the municipality Budčeves. 3. Description of the relationship between the subject contract and the client's needs using new water main sponsor will be able to satisfy the need obyvavatel village Budčeves quality drinking water 4. Expected deadline for fulfilling the public contract Expected realization is beginning October 1, 2015 and completion is November 30, 2016