Call +44 800 9755 164

Public tenders for construction in Karlovy-vary Czech...

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Motorway construction works

Ředitelství silnic a dálnic ČR | Published November 9, 2016  -  Deadline January 12, 2017
Construction of the new R6 (D6) in the length of 4,910 km. The main route, flyover, realignment of roads, dirt roads, six bridges, site preparation, road signs, measures during the construction, modification roads, retaining walls, drainage, relocation of sewerage, water treatment irrigation, overhead and underground lines of electrical, low voltage wiring , railway cables, SOS system, pipelines, PHS, fencing, landscaping and land reclamation.

Motorway construction works

Ředitelství silnic a dálnic ČR | Published November 9, 2016  -  Deadline January 11, 2017
The road is designed in the category category R25,5 / 100th A large part of the route goes along agricultural land, only a very small part of the forest on the land. Segment length is 4.2 km. In the area of ​​38,3 main route R6 (D6) is designed interchange with road I / 16th The construction includes the construction of seven bridges, noise walls, relocation of the creek, water, and sediment retention basins, central sewerage, irrigation, treatment EHV, HV and LV, relocation of existing utilities. Part of the SOS system with the information system, fencing and landscaping. Relaying I / 16: Also includes construction of an extensive realignment of the current road no. 16, which is designed in the category with 11.5 / 80. The spatial resolution will satisfy even the standard speed of 90 km / h. The entire route runs along farmland. Segment length is 1,462 km. The 0,130 km at the crossing of the current road I / 6 designed roundabout, which is partially modifying the road I / 6 part of this realignment, as well as the connection of the current I / 16 road into the village Řevničov at the end of realignment.

Motorway construction works

Ředitelství silnic a dálnic ČR | Published November 9, 2016  -  Deadline January 10, 2017
Construction of a new road I / 21 Trstěnice - Drmoul a length of 5,012 km. It is a new two-lane road category S11,5 / 80 with bituminous pavement, nine road bridge structures, drainage into the sewer and caused relocation of affected engineering of roads and utilities.

Motorway construction works

Ředitelství silnic a dálnic ČR | Published November 9, 2016  -  Deadline January 9, 2017
The total length of the main route modification is 5,550 km. The foregoing section of the highway D6 has long been in operation and is finished in New Strašecí interchange with the road II / 237th The current operation is connected to the I / 6th She was previously a length of approximately 1.8 kilometers realized as a half speedway, but the category R 24.5 / 100th Highway D6 is designed as a four-lane - in the category of R25,5 / 100th Existing road I / 6 will be converted into Class II. class labeled II / 606th The area of ​​interest is the construction of the entire length of silica bound to the current I / 6th The first section - from 32.00 to 33.32 km is the right half of the road in the length of 1,320 km conducted in the area of ​​the existing road I / 6th In this section will be made new complete reconstruction of the road, including the hard shoulder for a wider category of R25,5 / 100th The right side of the road will be enhanced by a long stretch spooler according to CSN 73 6102. In the next segment up to 33,340 km is already keeping highway D6 designed with height adjustments from the current I / 6th In both sections, the following left half of the future highway D6. From 33,340 km it is already designed a complete, brand new four-lane road until the end of the building. Its spatial management is most adapted to parallel the existing road I / 6 with high voltage power lines along it. It is designed with respect to the current terrain conditions and ensures perfect drainage design. The construction design is friendly to the surrounding countryside. Motorways in close parallel with the current road only extends the minimum width of the corridor, which is divided into forest. End of construction of 37 km, 550 is the area where the trail leaves the forested area.

Home for the Elderly in Cheb, Skalka, US 52 Reconstruction and modernization of the facility - Phase

Karlovarský kraj | Published July 16, 2015  -  Deadline June 30, 2017
Floor area of ​​2.235 m2. Description of needs: VZ main objective is to improve the user's climate and environmental clients homes for the elderly, improve traffic safety and increasing the technical efficiency of the entire technical operation of the complex. It is the construction work - the reconstruction of the interior of existing buildings, single-storey dining room extension and extension of communication access ramps. The interrelationship of the course and the needs of the contracting authority VZ: VZ realization will fulfill the priorities in social services in developing relevant documents - Action Plan development program Karlovy Vary Region for 2014-2020 and the medium-term plan for the development of social services Karlovy Vary region. VZ Due Date: June 30, 2017 137/2006 on public procurement. The Contracting Authority reserves the right to modify the specified deadlines. During the reconstruction of the gastronomic side home for the elderly to ensure a replacement delivery of meals for clients. Relevant cooperation and coordination is also the subject of the VZ.

Home for the Elderly in Cheb, Skalka, US 52 Reconstruction and modernization of the building

Karlovarský kraj | Published May 14, 2015  -  Deadline December 15, 2019
Built-up area 1.310 m2, enclosed space, 24.210 m3. Description of needs: VZ main objective is to improve the user's climate and environmental clients homes for the elderly, improve traffic safety and increasing the technical efficiency of the entire technical operation of the complex. It is the construction work - the reconstruction of the interior of existing buildings, single-storey dining room extension and extension of communication access ramps. The interrelationship of the course and the needs of the contracting authority VZ: VZ realization will fulfill the priorities in social services in developing relevant documents - Action Plan development program Karlovy Vary Region for 2014-2020 and the medium-term plan for the development of social services Karlovy Vary region. VZ Due Date: December 15, 2019 137/2006 on public procurement. Contracting authority's decision to launch work on II. stage will be selected contractors communicated no later than April 30, 2016, decision of the contracting authority to initiate work on the III. stage will be notified no later than April 30, 2017.
  • 1