Public tenders for construction in Chomutov Czech Republic

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

VD GENOA - CONSTRUCTION MVE

Povodí Ohře, státní podnik | Published August 29, 2016
cpvs

MVE is subject to execution of hydroelectric power potential of the waterworks Genoa. The energy potential of the tank VD Genoa will be used for generating electricity. To this end, the object in the current second bottom outlet installed turbine. Installation of small hydropower plants in the building of the second bottom drain runoff conditions will not deteriorate trough Loupnice in pertinent part flow. According to CSN 75 2601, according to an installed capacity of HPP is a II. Category turbine with a rated output of 125 kW. The total absorption capacity sets small hydropower plants is 0,250 m3.s -1. Breakdown of construction and operational units: SO 01 Engine room and the influx of small hydropower plants (HPP) technology PS 01 turbines with accessories PS 02 Power electrical, instrumentation and control (M & C), data transmission part II - Transfer el. energy from MVE, which will be fitted to the bottom outlet construction is positioned so that the optimum possible extent allowed transmission power. power from HPP. Production technology is irrelevant

VD GENOA - CONSTRUCTION MVE

Povodí Ohře, státní podnik | Published January 12, 2016
cpvs
45251120

MVE is subject to execution of hydroelectric power potential of the waterworks Genoa. Energy potential VD Genoa tanks will be used for electricity production. For this purpose the second object in the current bottom outlet installed turbine. Installation of small hydropower plants in the building of the second bottom drain runoff conditions will not deteriorate trough Loupnice in pertinent part of the flow. According to CSN 75 2601, according to the total installed capacity is about HPP II. Category turbines with a rated power of 125 kW. The total absorption capacity sets small hydropower plants is 0,250 m3.s -1. Breakdown of construction and operational units: SO 01 Engine room and the influx of small hydropower plants (HPP) technology PS 01 turbines with accessories PS 02 Power electrical, instrumentation and control (M & C), data transmission part II - Transfer of power. MVE energy, which will be fitted to the bottom outlet construction is positioned so that the optimum possible extent allowed transmission power. energy from MVE. Production technology is not relevant.

Construction of a protective bulwark Ledvice West - insulating greenery

Severočeské doly a. s. | Published April 8, 2015
cpvs

The subject of the tender is implementation of the project "Construction of a protective bulwark Ledvice West - insulating foliage", ie. Planting protective forest belts and green park west of Ledvice.

Kadan HC - construction of new HPP on the Left Bank - PD DPS

Povodí Ohře, státní podnik | Published January 12, 2016
cpvs
71300000

The contract is the provision of project documentation on the level of building construction. Reason effectiveness VZ: securing PD DPS as a basis for the publication on VZ construction.

Construction work

Statutární město Chomutov | Published May 7, 2015
Winner
Společnost skládka Chomutov – Silnice Group a.s., Klement a.s., DTS Vrbenský, a.s., Pastell spol. s r.o.
cpvs
45000000, 45112320, 77300000

Construction work on the total closure and reclamation of municipal waste landfill Southwest Field located in the land register Chomutov I. The project is solved closure of the landfill, which was originally designed in four phases, the first phase has already been implemented, it is now solved jointly 2nd-4th stage with a total area of ​​10.4 hectares of the area. Closure to be achieved by implementing the buildings SO 02.01 - Stage 2 - landscaping and reclamation and sealing layers, SO 1.3 - Stage 3 - landscaping and reclamation and sealing layers, SO 4.1 - 4th stage - landscaping and reclamation and sealing layer and SO 08 Gas Management 2nd-4th stage - collecting landfill gas wells, drain degassing drains, drain the system of gas, condensate trap, condensate drain foundations for the station for disposal of biogas, electric connection and biogas stations. Landscaping - out of focus imply that lie in dosypání and local creep, which will be carried material recovered odkopávkami made when editing a ditch or other adjustments to the landfill. Final landscaping will be carried perimeter drainage ditch. Reclamation and sealing layers - gaskets landfill will be done by placing bentonite mats with overlapping subsoil and placing topsoil will then be carried out biological reclamation The sowing of grass and planting of shrubs and trees. Gas management - based on the results of the pumping test and opinion CEI has proceeded to implement an active landfill degassing installation of drain system and gas system for disposal of biogas. Disposal system with semi-automatic operation of biogas will integrate measurement and control of the gas station, and high-temperature torch disposal of biogas. The subject matter is implemented within the project "Reclamation landfill KO Chomutov", which is financed from European Union funds (European Regional Development Fund / Cohesion Fund) under the Operational Programme Environment).

Construction work

Statutární město Chomutov | Published February 25, 2015  -  Deadline March 16, 2015
cpvs
45000000, 45112320, 77300000

Construction work on the overall closure and reclamation of municipal waste landfill Southwest field located in the land Chomutov I. The project is solved closure of the landfill, which was originally designed in four phases, the first phase was implemented already, now is solved together 2 to 4 stage with a total area of ​​10.4 hectares of the area. The closure is to be achieved by implementing the buildings SO 1.2 - Stage 2 - landscaping and sealing and capping layer, SO 1.3 - Phase 3 - landscaping and sealing and capping layer, SO 4.1 - 4th stage - landscaping and sealing and capping layer and SO 08 Gas Management 2nd to 4th stage - collecting landfill gas wells, drains convergent degassing, FREE gas system, condensate trap, condensate, foundations for biogas station for disposal, cables are out of the station and biogas. Landscaping - out of focus imply that lie in dosypání and local creep that will be made of material derived odkopávkami made when editing a ditch or other adjustments to the landfill. The final landscaping will be carried perimeter drainage ditch. Sealing and capping layer - seal landfill will be done by placing bentonite mats with overlapping subsoil and placing topsoil will be followed by biological reclamation The sowing grass and planting shrubs and trees. Gas economy - based on the results of the pumping test and opinion CEI is approached to implement an active landfill degassing installation of drain system and gas system for disposal of biogas. Disposal system with semi-automatic biogas will integrate the measurement and control of the gas station, and high-temperature torch disposal of biogas. The subject matter is realized within the project "Reclamation landfill KO Chomutov", which is financed from EU funds (European Regional Development Fund / Cohesion Fund) under the Operational Programme Environment).

Construction work

Statutární město Chomutov | Published February 3, 2015
cpvs
45112320, 45000000, 77300000

Stavební práce

VD Genoa - construction of the second bottom outlet

Povodí Ohře, státní podnik | Published June 17, 2015
cpvs

The contract is the construction of the pipeline right bottom drain facility closure bottom drain, drain channel and landscaping and operational systems. The building is divided into the following buildings: SO 01 - Pipes bottom outlet subsidy SO 02 - Object cap the bottom outlet of the subsidy SO 03 - Drainage trough subsidy SO 04 - landscaping endowment building is divided into the following operating systems: PS 01 - Closures bottom outlet subsidy PS 02 - Building Supply cap the bottom outlet subsidy PS 03 - Control system of subsidy PS 1.1 - Fixed spool caps-subsidy

VD JANOV - Construction of the second bottom outlet

Povodí Ohře, státní podnik | Published March 2, 2015
cpvs

The contract is the construction of the pipeline right-bottom drain facility closure bottom outlet, drain troughs and landscaping and operational systems. The building is divided into the following buildings: SO 01 - Pipes bottom outlet subsidy SO 02 - Object closure bottom outlet subsidy SO 03 - Drain trough subsidy SO 04 - Landscaping subsidy structure is divided into the following operating systems: PS 01 - Closures bottom outlet subsidy PS 02 - Building Supply closure bottom outlet subsidy PS 03 - Control system of subsidy PS 01.1 - Fixed spool caps non-subsidy

Kadan HC - construction of new HPP on the left bank - PD DPS

Povodí Ohře, státní podnik | Published June 17, 2016
cpvs

The subject of the public contract is the preparation of project documentation for construction (hereinafter PD DPS), in accordance with Decree 499/2006 Coll., (On construction documentation) as amended, the contents of the file will correspond to the Annex no. 6 of the Decree and in accordance the specification, including all related procedures. The project will include a proposal for the supply and installation of a complete new technology MVE on the left bank VD maximum absorption capacity of 25 m3 machines, including complex solution not only wiping screenings from screens MVE, but also individual spillways VD. Within this construction there is a considerable interference in the individual concrete blocks of the dam. MVE will use hydropower potential VD Kadan, the power plant will function as automatic with occasional supervision. Part of PD will be an extension of the dividing pillars 1, 2, 3, and part of the right bank with rails for reimbursement. Pillars bottom outlets will be the current state extended to the edge of the broth.

Kadan HC - construction of new HPP on the left bank - PD DPS

Povodí Ohře, státní podnik | Published April 12, 2016
cpvs

The subject of the public contract is the preparation of project documentation for construction (hereinafter PD DPS), in accordance with Decree 499/2006 Coll., (On construction documentation) as amended, the contents of the file will correspond to the Annex no. 6 of the Decree and in accordance the specification, including all related procedures. The project includes the delivery and installation of complex technology, new small hydropower plant on the left bank VD maximum absorption capacity of 25 m3 machines, including complex solution not only wiping screenings from screens MVE, but also individual spillways VD. Within this construction there is a considerable interference in the individual concrete blocks of the dam. MVE will use hydropower potential VD Kadan, the power plant will function as automatic with occasional supervision. Part of PD will be an extension of the dividing pillars 1, 2, 3, and part of the right bank with rails for reimbursement. Pillars bottom outlets will be the current state extended to the edge of the broth.

Construction of the VALU Ledvice WEST - Insulation GREEN

Severočeské doly a. s. | Published October 21, 2014  -  Deadline November 3, 2014
cpvs

The subject of the contract is the implementation of the project "Construction of a protective bulwark Ledvice West - insulating green", ie. Planting protective forest green belts and parks west of Ledvice. The representative of the SEF. Terms and conditions for opening the tenders will be set out in the notice that candidates receive. According to § 84 par. 5 of Law no. 137/2006 Coll., On Public Procurement, as amended, the Contracting Authority reserves the right to cancel the tender in its entirety. For detailed information on requirements for processing requests for participation are stated in the qualification documentation, which is published on the profile of the client. The period referred to in IV.3.4 with the deadline for submission of an application. In section IV.3.4. said authority in proper form notice - utilities deadline for submission of requests to participate June 9, 2014. The sponsor subsequently published correction due form related to the modification of the contact person stated previously estimated deadline for submission of tenders on 15 September 2014, but with regard to the length of assessing the qualifications of candidates provided authority following the date of dispatch of invitations to tender, deadline for submission of bids in October 20, 2014 11:00 am., which now due to the provision of additional information on the tender dossier extended until November 3, 2014 11:00 pm.

VD Genoa - construction of MVE

Povodí Ohře,státní podnik | Published November 9, 2016
Winner
Strojírny Brno, a.s.
cpvs

Construction work

Statutární město Chomutov | Published May 3, 2016
Winner
Gardenline s.r.o.
cpvs
45000000

Additional works whose need arose after the discovery of the state of the site and existing buildings in the covered areas where it was not possible to predict in advance the full breadth of the overall condition of the structures and underlying layers. This is an additional work within buildings: SO 101. Roads - CH3 branch structures change, the final surface-fold UPC cable, replacing the core of primary schools (redevelopment of the ground plane underneath sidewalks), adding traffic signs SO 202.2 - Subway Sandy - garden (MHD) - reinforced concrete retaining wall 703. SO - Terrace heat - contact heat exchanger and roof slabs object KASS SO 001. site preparation and SO 101. the road - the demolition of the concrete area between fountain and a future No. 5213th

Construction work

Severočeské doly a.s. | Published July 8, 2015
cpvs
45000000, 45111291, 45112600, 45112700, 45315400

Realizace dodatečných víceprací v rámci zakázky „Zlepšení kvality ovzduší v okolí lomu DNT realizací izolační zeleně Březno“.

VD Genoa - construction of the second bottom outlet

Povodí Ohře, státní podnik | Published March 9, 2017
Winner
AVE – servis, spol. s r.o.
cpvs
45240000

Construction work for social center of Kassem - demolitions

Statutární město Chomutov | Published December 17, 2015
cpvs

It is the removal of the building that served as a cinema, wine bar, sportsbook and other small spaces. In total there are 1.439 m2 of built area. As part of the removal of the building will be relocated existing lines heat pipeline located in the 1st PP object. This relocation will be carried out using vertical siphon in an existing route. It will also be canceled and existing gas connection will be made makeshift zapláštění exposed parts of the facade. Removing part of the building provides a new communication corridor. Demolition work will be carried out progressive dismantling of the buildings so as to allow the use of conserved parts of the building.

Construction work for social center of Kassem - demolitions

Statutární město Chomutov | Published September 15, 2015
cpvs

It is the removal of the building that served as a cinema, wine bar, sportsbook and other small spaces. In total there are 1.439 m2 of built area. As part of the removal of the building will be relocated existing lines heat pipeline located in the 1st PP object. This relocation will be carried out using vertical siphon in an existing route. It will also be canceled and existing gas connection will be made makeshift zapláštění exposed parts of the facade. Removing part of the building provides a new communication corridor. Demolition work will be carried out progressive dismantling of the buildings so as to allow the use of conserved parts of the building.

Project-supervision services other than for construction work

Povodí Ohře státní podnik | Published November 20, 2015
Winner
Vodní díla – TBD a.s.
cpvs
79421100

The contract's implementation of technical and safety Supervision (TBD) of water works (hereinafter referred to as VD) administered by the Ohře River in the years 2016-2018. Technical Safety oversight is defined in § 61 and § 62 of the Act no. 254/2001 Coll., On waters, as amended, and is further elaborated and specified in Decree no. 471/2001 Coll., On technical and safety supervision of water parts, as amended.

Project-supervision services other than for construction work

Povodí Ohře, státní podnik | Published August 21, 2015  -  Deadline October 12, 2015
cpvs
79421100

The contract's implementation of technical and safety Supervision (TBD) of water works (hereinafter referred to as VD) administered by the Ohře River in the years 2016 to 2018. Technical Safety oversight is defined in § 61 and § 62 of the Act no. 254/2001 ., on waters, as amended, and is further elaborated and specified in Decree no. 471/2001 Coll., on technical and safety supervision of waterworks, as amended, and applicable programs of technical and safety supervision for individual water works.