Public tenders for construction in Cesky-krumlov Czech Republic

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

Město Český Krumlov | Published August 29, 2015
Winner
POHL cz, a.s.
cpvs
45000000, 45400000, 45300000

Additional works, which consist of: Rehabilitation of vaults and relief embankment above the top of the arch, in the case of Baroque tiled stove, according imprint apparently placed in the furnace room K1-2-006, but also other biedermaierových stove, it is possible to carry out the genuine reconstruction Furthermore ceiling rehabilitation and preventive protection of wooden structures and a new track construction of the ceiling and floor due to lightweight construction and provision of better thermal engineering and humidity conditions,

Construction of a new multipurpose pavilion Hospital Czech Krumlov.

Nemocnice Český Krumlov, a.s. | Published March 15, 2016
cpvs
45000000

Construction of a new multipurpose pavilion Hospital Czech Krumlov.

Works for complete or part construction and civil engineering work

Retex a.s | Published April 12, 2017  -  Deadline May 22, 2017
cpvs
45200000

Construction of the production hall.

Works for complete or part construction and civil engineering work

Retex a.s. | Published May 23, 2017  -  Deadline May 23, 2017
cpvs
45200000

Construction of a production hall.

Construction of a new multipurpose pavilion Hospital Czech Krumlov

Nemocnice Český Krumlov, a.s. | Published March 10, 2016
cpvs
45000000

The subject of the tender is construction of a new multipurpose pavilion Hospital Czech Krumlov. Justification of expediency: a) A description needs to be the fulfillment of public contracts achieved: The project aims to build the hospital premises Czech Krumlov separate, operationally simple and clear building a functional connection with existing buildings and the creation of adequate space for staff and patients, which will replace the current inadequate workplace. Construction will also bring significant improvements in patient care and facilities for staff. b) A description of the subject contract: The subject of the contract is the construction of a new multipurpose pavilion Hospital Czech Krumlov. c) A description of the relationship between the subject contract and the client's needs: The completion of the public tender will fulfill the planned targets and will extend and improve patient care and improve the working conditions of the employees of the hospital. d) Expected date of fulfillment of public contracts: 12/2017

Construction of new multifunctional pavilion Hospital Czech Krumlov, as

Nemocnice Český Krumlov, a.s. | Published March 2, 2015
cpvs

Building contracts was to provide design and engineering activities for the purpose of preparation of project documentation for land management (DUR), preparation of project documentation for building permission (DSP), preparation of project documentation for construction (DPS) in accordance with Decree no. 499/2006 Sb ., Decree no. 230/2012 Sb. and Act no. 137/2006 Coll., on Public Procurement, as amended, developing a plan and safety at work on the site (OSH plan), the performance of the health and safety coordinator during the preparation of construction including design engineering activities associated with arranging the necessary permits to event titled Construction of new multifunctional pavilion Hospital Czech Krumlov, as

Construction work

Město Český Krumlov | Published September 15, 2015
Winner
POHL cz, a.s.
cpvs
45000000, 45400000, 45260000, 92522000

Additional works, which consist of: PP changes within PD - ceilings and stucco elements 2_NP - Corrective ceilings, replacement of tamping and rákosování, performing rehabilitation and reconstruction stucco - Changes and VCP- stucco ceilings 1_NP - Transfer stucco removed from the demolished ceilings under the Gothic ceilings - Change staircase K1-1-013 - Implementation of the new staircase structure in accordance with the change of PD - 1 layout adjustments and 2_NP - Need for layout editing solution induced exposure in 1.NP and dopřesněným way to use the space 2.NP - Restoration of the facade sacristy - Implementation of restoration work, restoration of the original gothic stone, stucco and blacksmith elements - restoration sedille and found stone portals - Rehabilitation and presentations sedile, portals and other original elements lining, etc., transfer pavings court area and courtyard incl. renovation and additions stone elements - dehumidification church wall - measures for dehumidifying, which must be done by the neighboring buildings - links ventilation channels - changes in carpentry and metalwork elements - Amendments and changes in joinery, carpentry and locksmith elements and related construction work according to changes in PD - Building K3 - Former cloister building - adding locksmith and stone elements - Need to supplement locksmith and stone elements in the building K3 - findings and needs arising during construction,

Construction work

Město Český Krumlov | Published April 28, 2015
Winner
Společnost pro revitalizaci areálu klášterů Český Krumlov
cpvs
45000000, 45100000, 45200000, 45300000, 45400000

During the execution of a public contract in question was detected necessity to implement additional works, which consist of: - restoration and additions valuable artistic elements in the object M7 - Monastery Church. The reason of this extra work is rescue, renewal and valuable artistic elements - see Appendix. 1 - ZL 08 - opening holes in the original dimensions including additions and repairs vaulting hole in the building M1 - 1st Floor - Extension of the hole and repair and restoration of the vault between m. no. 1.16 and 1.17. The reason of this extra work is to preserve the authentic structure and its presentation - see Appendix. 1 - ZL 09 - adding piping and increase the diameter of the eaves leakage in the building M1 and M7 - an amendment and supplement of sheet metal components. The reason of this extra work is to protect structures against leakage and destruction due to leaks - see Appendix. 1 - ZL 10 - supplementing and supporting structures supporting static security in the building M1 - structure modification of the static security of the vault of the refectory at ground level, 2nd floor. The reason of this extra work is to change based on the facts found during construction work - see Appendix. 1 - ZL 11 - gradually treatment including cleaning, inspection, design and paint in the building M7 - Restoration work - altars, pulpit and the Vestry cabinet. The reason of this extra work is to preserve important and valuable artistic elements of the interior, restoration of wood-destroying insects, change based on the facts found during construction work. These additional works build on the previous surface treatment gassing - see Appendix. 1 - ZL 12 - restoration work and associated construction works in the building M1 - tracery windows cloister - the addition of stone elements and reconstruction glazing. The reason of this extra work is to preserve important and valuable artistic elements and their professional supplement - see Appendix. 1 - ZL 13th

Construction work

Město Český Krumlov | Published September 15, 2015
Winner
Společnost pro revitalizaci areálu klášterů Český Krumlov, VIDOX s.r.o. jako vedoucí člen
cpvs
45000000, 45310000, 92522000

Additional works, which consist of: - Object M7 - Monastery Church - art-craft repair furniture - Version craft repair the furniture of the church according processed PD on the draft National Heritage Institute - territorial workplaces in Czech Budejovice - Building M1 - room no. 1.03 - coffin on the remains - from the pious and ethical reasons it has been proposed to store the skeletal remains of the oak chests (coffin) and after the construction of the ventilation duct bury back in space cloister garden - Objects M1-M7 - Heavy - Adjustments routing high-voltage wiring, the location of terminal elements distribution and related adjustments.

Construction work

Město Český Krumlov | Published July 17, 2015
Winner
Společnost pro revitalizaci areálu klášterů Český Krumlov, Vidox s.r.o. jako vedoucí člen
cpvs
45000000, 45400000, 45260000, 44212310, 92522000

Additional works, which consist of: - Object M5 - The wall between the garden and brewery M5 - Complete change of the convex roof, covering the crown of the enclosure wall. Making new entrance gate in accordance with the original copy of the preservation and use of back repasovatelných forged elements of the existing structure - Object M7 - Monastery Church - Replacement of components or whole panels in accordance with the original copy of the preservation and use of back repasovatelných forged elements of the existing structure and fills - Property M7 - Monastery Church - Performing a recovery paintings of the church according processed PD ie. the restoration of damaged decorative stucco and repairing cracks in masonry, moisture remediation, restoration of artisan elements of the interior, the overall repainting the church - building M1 - Fošnová floor leaving paving only in areas of wet processes - building M1 - painting restoration - Gothic window 2.NP - Clearing, fixing and painting restoration - building M1 - walkable platform for HVAC in 3_NP - walkable platform for carrying around loads of HVAC. Department of truss construction of facilities for HVAC system, improving access to divorce for their HVAC inspection and maintenance.

Construction, foundation and surface works for highways, roads

Česká republika – Státní pozemkový úřad | Published July 7, 2016  -  Deadline July 27, 2016
cpvs
45233000, 71250000, 77211400

The subject of the public contract is the realization of the plan of common facilities (CSR) in accordance with the approved design comprehensive landscaping (kicks) in the cadastral Rájov. This construction field paths C4, C5 and C8. Each path has a length of 823 m = C4, C5, C8 = 1008 mA = 512 m. The routes are designed for design category P4 / 30, which corresponds to the width of the lane 3 mA pair of roadside with a width of 0.5 m. A detailed definition of the public contract and The specifications define the project documentation developed by CityPlan al. s ro Jindřišská 17, 110 00 Prague 1, ID: 47307218, under custom number 12-2-134, as well as an inventory of supplies, services and works and technical specifications (conditions).

Construction work

Nemocnice Český Krumlov, a.s. | Published April 23, 2016  -  Deadline June 14, 2016
cpvs
45000000, 71250000

Details about the fulfillment of the public contract is contained in the documentation of the building, which at the time of announcement of the award procedure being completed. Project documentation is received by all candidates for a public contract who present to present the award procedure his request, resp., Demonstrating compliance with the qualification requirements set out in the Qualification documentation.

Qualification is part of the documentation accompanying technical report and summary, which are the basic parameters of the building, which serves contractors to get a general idea of ​​the performance. Cover and Summary technical report will also be included in the project documentation.

Construction of the T

RETEX a.s. | Published May 22, 2017
cpvs
45200000

Construction production halyT

RETEX a.s | Published April 10, 2017  -  Deadline May 22, 2017
cpvs
45200000

Construction work

Město Český Krumlov | Published August 29, 2015
Winner
Společnost pro revitalizaci areálu klášterů Český Krumlov, Vidox s.r.o. jako vedoucí člen
cpvs
45000000, 45400000, 92522000

Additional works, which consist of: - Object M7 - Monastery Church - Restoration work - Implementation of restoration work in accordance with the proposals of restorers and recommendations of the professional staff of state monument care - Building M1 - treatment of the floor in the room no. 2.02 - static security - Execution select inhomogeneous powders hooded arches, new homogeneous powders, design of reinforced concrete roznášecího threshold and floor boards - building M1 - Restoration work - connecting corridor to the Church of 1.22, 1.23 - Implementation of restoration work in accordance with the proposals of restorers and recommendations of expert employees of the state of conservation, - Object M1 - change painting and stone threshold - Following the recommendations of professionals nationwide implementation of NHI removing layers of painting full restoration of the ceiling, carry out minor repairs of local surface and fixation of fragments of decorative paintings from different historical periods. These professional work will be followed craftsmanship restoration mural, which was recommended by the same process as in the case of the monastery church - the unification of space and design lime colors to technically adjusted basis. Implementation of new sanitation plaster in the lower part and complement the stone threshold between columns - Property M4 - dehumidification boundary wall between the gardens M4 and M6 - design air channel for dehumidifying.

Construction of a new multipurpose pavilion Hospital Czech Krumlov

Nemocnice Český Krumlov, a.s. | Published February 23, 2017
Winner
OHL ŽS, a.s.
cpvs
45000000

Construction, foundation and surface works for highways, roads

Česká republika – Státní pozemkový úřad, Krajský pozemkový úřad pro Jihočeský kraj, Pobočka Český Krumlov | Published September 9, 2016
cpvs

Implementation of CSR in k. Ú. Chvalsiny.

Construction of a new multipurpose pavilion Hospital Czech Krumlov

Nemocnice Český Krumlov, a.s. | Published April 19, 2016
cpvs

Details about the fulfillment of the public contract is contained in the documentation of the building, which at the time of announcement of the award procedure being completed. Project documentation is received by all candidates for a public contract who present to present the award procedure his request, resp., Demonstrating compliance with the qualification requirements set out in the Qualification documentation. Qualification is part of the documentation accompanying technical report and summary, which are the basic parameters of the building, which serves contractors to get a general idea of ​​the performance. Cover and Summary technical report will also be included in the project documentation. Prior notification of public procurement was published in the Bulletin of public procurement on 10. 3. 2016 under registration number 633,986th

Construction, foundation and surface works for highways, roads

Česká republika – Státní pozemkový úřad, Krajský pozemkový úřad pro Jihočeský kraj, Pobočka Český Krumlov | Published April 27, 2016
cpvs
45233000, 71250000, 77211400

Implementation of CSR in the cadastral Rájov.

Construction of warning and alarm system of flood protection for the city of Czech Krumlov

Město Český Krumlov | Published November 11, 2014
cpvs

Building a warning and alert systems, flood protection, including the watchers profiles and level. Delivery and installation of a new wireless local information and warning system in order to obtain immediate information eg. The heavy precipitation, the flood situation with the possibility to predict their occurrence and warn vulnerable population at the time of emergencies and reduce the risk of high material damage and increase protection of human health and the lives of its inhabitants. The system will be connected to LVS (Flood and level), and serve to transmit verbal messages and warning signals.