Public tenders for construction in Cesky-brod Czech Republic

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Drinking-water treatment plant construction work

Vodovody a kanalizace Havlíčkův Brod, a.s. | Published October 8, 2016  -  Deadline October 26, 2016
cpvs
45252126

Construction of drinking water treatment plants

Construction work for water and sewage pipelines

Vodovody a kanalizace Havlíčkův Brod, a.s. | Published October 7, 2016  -  Deadline November 3, 2016
cpvs
45231300, 45232150, 44161200

Construction work for water and sewage pipelines

Construction work

Psychiatrická nemocnice Havlíčkův Brod | Published May 17, 2017
Winner
Stavointerier s.r.o.
cpvs
45000000

Complete repair and modernization of the therapeutic pavilion - building repairs, replacement of internal installations, windows, floor coverings, repainting of plaster, extension of the lift, outdoor modifications. The purpose of the VZ is to bring the technical state of the object into line with the applicable standards for the operation of health care.

During the construction, the floor was uncovered in 100% of the room. After the uncovered, it was found that the existing ceiling beams are in good condition and, for static and fire-safety reasons, the original ceiling can be maintained. The new ceiling is only above rooms 2.28 .- 2.29 where the original ceiling was irreversibly damaged. When the wall part of the room wall is broken, 1.43. It has been found that the existing ceiling structure will need to be demolished and replaced by a new steel-concrete ceiling.

In the designer's budget there is no item on the grooving cutout line for ascending central heating and the item is a charge for moving the mass.

Czech Brod - Construction work č.p.1100 for elementary school

Město Český Brod | Published July 18, 2016
cpvs

The subject of the work is the reconstruction of the building No. 1100 in the Czech Brod for elementary school. Part of the work and outdoor work - construction field, fencing and road construction work.

Czech Brod - Construction work č.p.1100 for elementary school

Město Český Brod | Published April 13, 2016
cpvs

The subject of the work is the reconstruction of the building No. 1100 in the Czech Brod for elementary school. Part of the work and outdoor work - construction field, fencing and road construction work.

Czech Brod - Construction work č.p.1100 for elementary school

Město Český Brod | Published February 24, 2016
cpvs
45214200

The subject of the work is the reconstruction of the building No. 1100 in the Czech Brod for elementary school. Part of the work and outdoor work - construction field, fencing and road construction work. Reason effectiveness of public procurement in accordance with § 1 - advance notice in the Gazette VZ justification under §1 point. a) to d). Prior notification in the Gazette VZ description needs to be filled with the fulfillment of public contracts (the planned target). The realization of this project will expand the capacity of primary school. This project will fulfill one of the goals of the Strategic Plan Czech Brod goal 8.2.1 To ensure adequate space and capacity for pre-school, school and recreational education, this project solves a school education. A description of the subject contract. The subject of public procurement is a total renovation of the building No. In 1100, this reconstruction will provide 8 new classrooms for primary schools, one class for the young men and adequate facilities (lockers, cabinets, toilets, outdoor playground), the school will be built as a barrier. Description of the relationship between the subject contract and the client's needs. Without implementation of public procurement is not possible to meet the planned target and fulfill the needs of the client, this is a project where you applied for a grant from the Ministry of Education program. Only the implementation of public procurement can meet the planned target. Expected date of fulfillment of public contracts: 10/2016 (according to the planned schedule of the project)

Waste-treatment plant construction work

Město Havlíčkův Brod | Published July 24, 2015
cpvs
45222100

Výstavba zařízení na zpracování odpadu

Construction work

Obec Rozsochatec | Published September 22, 2015
Winner
PWB stavby s.r.o.
cpvs
45000000

Newly built apartment building with so-called. Customizable apartments. It is a two-storey building on a rectangular plan with a gabled roof gentle slope. The building is based in steep terrain, vertical structures are made of ceramic blocks, ceiling above the 1st pp is a hollow core slabs, roof trusses nailed the drywall ceiling and the metal covering. The project includes retaining walls up to 3 m, landscaping, paved areas, parking and exit from public roads. The building will be connected to the mains, gas, water and equipped with a septic tank. The land will be fenced.

Construction work for water and sewage pipelines

Obec Doubravčice | Published October 29, 2016
Winner
Zepris s.r.o.
cpvs
45231300

The subject of the public contract is the execution of the work, "Sanitation and water supply Doubravčice - II. phase". Work will be performed in accordance with the conditions specified in the tender documents and project documentation.

"SPŠ and OA Uherský Brod - construction of a school playground"

Střední průmyslová škola a Obchodní akademie Uherský Brod | Published September 2, 2016
cpvs

The subject of the public contract is to build an outdoor sports complex enabling the fulfillment of particular curricula. The proposed building will fulfill the essential function of teaching sports in physical education high school. Additional functions engineered equipment is an extracurricular activity for students and professors, or occasional commercial use. The outdoor sports complex will be an athletic oval and related buildings, dressing rooms, landscaping and landscaping and fencing the area. A detailed description of the subject of the public contract is provided in Annex no. 1 of tender documentation - the project documentation and inventory work, see Section 6.1 of the tender dossier. Sponsor in accordance with § 99 of the PCA has reserved the right of option to the maximum legal amount in excess of the performance of this contract. In accordance with § 99 para. 5 of the PPA contracting pre-determined period of utilization of option rights for a maximum in accordance with the Public Procurement Act (eg. § 23 para. 7 point. B) PPA). Furthermore, by defining the basic subject matter of the contract relating to option rights on construction work in the framework of implementation II. stage works, a detailed description is specified in the summary report of the technical project documentation (PD) B.2. - SO 02 building dressing rooms, and the procedure and in accordance with the PPA, especially under § 34 of the PPA and § 23 par. 7 point. b) the PPA to the procedure according to § 34 of the PPA contracting for additional services admits (§ 23 par. 7 point. b) Section 3 PPA).

Construction work for water and sewage pipelines

Vodovody a kanalizace Havlíčkův Brod, a.s. | Published June 24, 2016
cpvs
45231300, 45232150, 44161200

Increasing the capacity of water supply "Želivka Water Treatment Plant - Ledeč nad Sázavou - Brod" - II. phase.

SOU Uherský Brod - construction of a connecting neck

Střední odborné učiliště Uherský Brod | Published March 13, 2017
Winner
3V & H, s.r.o.
cpvs

Drinking-water treatment plant construction work

Vodovody a kanalizace Havlíčkův Brod, a.s. | Published June 24, 2016
cpvs
45252126

Optimization of the process water treatment with UV light of the town.

Czech Brod - Construction work No. 1099 - the school cafeteria

Město Český Brod | Published August 10, 2016
cpvs

Reconstruction of the building č.p.1099 for the school canteen.

Pressure sewer system and wastewater treatment plant Hradešín

Obec Hradešín | Published September 25, 2015
cpvs

Procured the construction work related to the construction of pressure sewer system and wastewater treatment plant in the village Hradešín in the Central Region.

Water supply Květinov - 3rd stage, sewerage and sewage treatment plant Květinov - 3rd and 4th stage

Obec Květinov | Published August 7, 2015
cpvs

The subject of the works is the construction of new water and sewer mains, and construction of the wastewater treatment plant (WWTP), including plumbing fixtures, electrical connections and transportation links wastewater treatment plant in the village Květinov.

Sewer and water Bylany

Obec Chrášťany | Published May 20, 2016
cpvs
45231300

The subject of the tender is the construction of sewerage and water supply. Reason effectiveness of public contracts pursuant to § 86 par. 2 of Act no. 137/2006 Coll., On Public Procurement, as amended: a) the description needs to be the fulfillment of public contracts achieved: support for the construction and technical improvement of infrastructure water supply and sanitation in the village for public use; b) a description of the subject of public contract works, respectively. supplies or services relating to the construction work, whose subject is the construction of sewerage and water supply in the village; c) a description of the relationship between the subject contract and the client's needs: The purchaser needs to implement a technical assessment of infrastructure, water supply and sewerage in the village for public use, and building on it to raise the living standard of local residents, while this goal is achieved in the construction of sewerage and water supply, which is the subject of this procurement; d) the envisaged deadline for fulfilling the public contract within 400 days from its submission site.

Pressure sewer system and wastewater treatment plant Hradešín

Obec Hradešín | Published June 2, 2015
cpvs
45232400

Procured the construction work related to the construction of sewerage and wastewater treatment plant in the village. Reason effectiveness of public contracts pursuant to § 86 par. 2 of Act no. 137/2006 Coll., On Public Procurement, as amended: a) a description needs to be the fulfillment of public contracts achieved: wastewater disposal, reducing water pollution from municipal resources, support construction and technical improvements sewerage infrastructure in the municipality for public use; b) a description of the subject of public contract works, respectively. supplies or services relating to the construction works associated with the construction of sewers and sewage treatment plants for public use is associated with the disposal of wastewater; c) a description of the relationship between the subject contract and the client's needs: village sewer system, reducing water pollution from municipal sources and disposal of sewage (waste) water in the area is an urgent need for the contracting authority, and this need will be met through the implementation of the public contract; d) the anticipated date of the fulfillment of public contracts: IV. Q. 2016

WWTP and sewerage Přistoupim

Obec Přistoupim | Published June 2, 2015
cpvs
45232400

Procured the construction work related to the construction of sewerage and wastewater treatment plant in the village. Reason effectiveness of public contracts pursuant to § 86 par. 2 of Act no. 137/2006 Coll., On Public Procurement, as amended: a) a description needs to be the fulfillment of public contracts achieved: wastewater disposal, reducing water pollution from municipal resources, support construction and technical improvements sewerage infrastructure in the municipality for public use; b) a description of the subject of public contract works, respectively. supplies or services relating to the construction works associated with the construction of sewers and sewage treatment plants for public use is associated with the disposal of wastewater; c) a description of the relationship between the subject contract and the client's needs: village sewer system, reducing water pollution from municipal sources and disposal of sewage (waste) water in the area is an urgent need for the contracting authority, and this need will be met through the implementation of the public contract; d) the anticipated date of the fulfillment of public contracts: IQ 2017

The bicycle path Losích, Brod

Město Havlíčkův Brod | Published December 4, 2014
cpvs

The subject is the construction of trails for hikers and cyclists along the river Sazava with an asphalt surface in the range of 3 meters. The total length of roads is about 637 m. The construction of the retaining wall in the length of 22.85 meters, relaxation areas with benches and a playground. The space will be illuminated by the newly built public lighting with 13 bezpaticovými masts.