Toxic waste disposal services except radioactive waste and contaminated soil

Gmina Miasto Pionki | Published June 24, 2015
Winner
Wojskowy Instytut Techniczny Uzbrojenia
cpvs
90523000

1. The contract is for liquidation of ecological bomb in the former Plant Plastics "Pronit" SA in Pionkach. 2. The liquidation of ecological bomb consists of: 1) complete removal and transfer off-site of the former Plant Plastics "Pronit" SA Pionkach for disposal of explosive waste code 04.16.03 *, including nitrocellulose waste and other hazardous waste 2) the elimination (removal) of objects and devices, where there were explosive and hazardous waste. This applies to situations where, despite diligent extraction and removal (by any method) wastes or other wastes nitrocellulose explosives and dangerous objects or devices they may create further any threat. 3. The total quantity of explosives and hazardous waste, including waste nitrocellulose in particular, to remove and transfer for disposal, according to estimates Employer, up to 230 Mg.

Street-cleaning and sweeping services

Generalna Dyrekcja Dróg Krajowych i Autostrad, Oddział w Opolu | Published September 20, 2016
Winner
Zakład Usług Drogowych i Komunalnych „DROMAR” Marian Kaliściak
cpvs
90610000, 45233141, 90722200

In case of necessity of exchange services contaminated soil Purchaser will issue such a task separate order at the time the agreed with the Contractor).

Street-cleaning and sweeping services

Generalna Dyrekcja Dróg Krajowych i Autostrad Oddział w Opolu | Published September 20, 2016
Winner
REMOST Z. Mrozek, H. Mrozek, K. Mrozek Spółka jawna
cpvs
90610000, 45233141, 90722200

In case of necessity of exchange services contaminated soil Purchaser will issue such a task separate order at the time the agreed with the Contractor).

Street-cleaning and sweeping services

Generalna Dyrekcja Dróg Krajowych i Autostrad Oddział w Opolu | Published July 13, 2016  -  Deadline August 18, 2016
cpvs
90610000, 45233141, 90722200

In case of necessity of exchange services contaminated soil Purchaser will issue such a task separate order at the time the agreed with the Contractor).

Street-cleaning and sweeping services

Generalna Dyrekcja Dróg Krajowych i Autostrad, Oddział w Opolu | Published July 9, 2016  -  Deadline August 19, 2016
cpvs
90610000, 45233141, 90722200

In case of necessity of exchange services contaminated soil Purchaser will issue such a task separate order at the time the agreed with the Contractor).

Street-cleaning and sweeping services

Generalna Dyrekcja Dróg Krajowych i Autostrad, Oddział w Opolu | Published April 13, 2016  -  Deadline May 23, 2016
cpvs
90610000, 45233141, 90722200

In case of necessity of exchange services contaminated soil Purchaser will issue such a task separate order at the time the agreed with the Contractor).

Street-cleaning and sweeping services

Generalna Dyrekcja Dróg Krajowych i Autostrad Oddział w Opolu | Published March 17, 2016  -  Deadline April 25, 2016
cpvs
90610000, 45233141, 90722200

In case of necessity of exchange services contaminated soil Purchaser will issue such a task separate order at the time the agreed with the Contractor).

Industrial site rehabilitation

Gmina Solec Kujawski | Published October 21, 2015
Winner
Konsorcjum PROTE Technologie dla Środowiska Sp. z o.o. Członek: Roboty Ziemne Budowlane i Drogowe z Własnym Transportem oraz Naprawa Sprzętu Tadeusz Szczepański
cpvs
90722100

Reclamation works including treatments reclamation involving the cleaning of contaminated soil by in situ on the side, ie. Using technology remediation used in contaminated with minimum waste disposal including: 1) the mining and carrying out the washing process additional batch of the strongest contaminated soil from the area covered by the work reclamation of about 4 000 cubic meters; 2) build into a pile scrubbed the ground in an amount of about 4 000 cubic meters; 3) applying biopreparation in the amount of 4 000 dcm³ (1 dcm³ for every 1 m³ of soil treated biopreparation) to w / in the ground; 4) sampling and performance testing of soil - planned to carry out one series of measurements at a rate of 10 soil samples.

Remediation of soil contaminated with petroleum substances on the premises of the Central Street. Czerniakowska 124, Municipal Water and Sewage in the Capital City of Warsaw: Phase I: Development of the design - the executive for the works related to the rehabilitation of land Stage II: Execution of works, reclamation so as to achieve the environmental effect according to the documentation prepared in part of the Phase

Miejskie Przedsiębiorstwo Wodociągów i Kanalizacji w m.st. Warszawie S. A. zarejestrowane w Krajowym Rejestrze Sądowym w Sądzie Rejonowym dla m.st. Warszawy w Warszawie, XII Wydział Gospodarczy Krajowego Rejestru Sądowego pod numerem KRS 0000146138 | Published April 29, 2014  -  Deadline June 4, 2014
cpvs
45112320

The contract is for remediation of contaminated soil with petroleum substances on the premises of the Central Street. Czerniakowska 124, Municipal Water and Sewage in the Capital City of Warsaw: Phase I: Development of the design - the executive for the works related to the rehabilitation of the land. Stage II: Execution of works, reclamation so as to achieve the environmental effect in accordance with the documentation developed during Phase I.

Industrial site rehabilitation

Gmina Solec Kujawski | Published October 20, 2015
Winner
Konsorcjum: Prote Technologie dla Środowiska Sp. z o.o. z Partner: Roboty Ziemne Budowlane i Drogowe z Własnym Transportem oraz Naprawa Sprzętu
cpvs
90722100

The scope of the contract includes the execution of reclamation work involving: In terms of reclamation treatments involving the purification of contaminated soil by in situ on the side, ie. Using technology remediation used in contaminated with minimum waste disposal costs: a) mining and carrying out a flushing process additional batch of the strongest contaminated soil from the area covered by the work of reclamation of about 1 440 m3 of embedding in a pile; b) biopreparation be administered in an amount of 1 440 dm3 (1 dm3 per 1 m3 of soil treated biopreparation) to w / w of the soil; c) the collection of samples and carry out tests of ground - planned to carry out three series of measurements, each collection of 20 soil samples; d) to intensify the process of flushing the ground for the most contaminated land in the amount of approximately 2 087 m3; e) export and disposal of waste produced in the process of flushing the soil in the amount of 3 000 Mg In terms of environmental monitoring of soil and water costs to extend the research network of groundwater due to some contaminants found in piezometers on the inflow of groundwater outside the railway tracks (from the south ) - perform additional 6 piezometers.

Construction work

Miasto Stołeczne Warszawa, reprezentowane przez Zarząd Transport Miejskiego w Warszawie, w imieniu i narzecz, którego działa Metro Warszawskie Sp. z o.o., z siedzibą w Warszawie, ul. Wilczy Dół 5 na podstawie pełnomocnictwa z 10.1.2014 o znakach ZTM-NPZ-O | Published April 4, 2017
Winner
Astaldi S.p.A.
cpvs
45000000

Execution of works and design work necessary to comply with:

Tasks 2:

a) Construction of the second underground line in Warsaw - stage implementation section of the east-north - the pathway for C15 station "Vilnius Train" to a station for holding tracks C18;

b) Project of Executive Plan for Safety and Health, as-built documentation, Operation and Maintenance Manual to the extent specified in the PFU together

with attachments; Traffic Plan complements the Department of Mining and its application for approval submitted to the Contractor by the Employer, as well as getting the approval of the Plan by the above competent mining supervision authority.

Additional contract covers the disposal of contaminated soil from the excavation ventilation V17.

Entrusting an additional order of the Contractor the construction of the North-East the second metro line in Warsaw not included in the basic contract.

Reclamation of industrial land on the PP Nasycalnia sleepers in Solec Kujawski

Gmina Solec Kujawski | Published July 6, 2013
Winner
Konsorcjum Lider: Prote Technologia dla środowiska Partner:Tadeusz Szczepański Roboty Ziemne Budowlane i Drogowe z Własnym Transportem oraz Naprawa Sprzętuul. Nieszawska 1Poznań 61-021 porte@porte.pl +48 616545570 +48 616545579
cpvs
90722100, 90722200, 90722300, 90730000, 45111213, 45111250

Preparation of the site including: Temporary fencing contaminated areas, the construction of a temporary access road from the entrance street. Kujawska to back and the steel tank, construction of other roads necessary for work with recycled material, as adopted by the Contractor orgagnizacją technology and reclamation works, installation of construction site facilities, making connecting waterworks, sewage and electricity supply facilities and equipment installed on-site (with the measurement of electrical cabinet is located at ul. Kujawska), the separation zone, depending on the degree of contamination .. reclamation treatments involving the cleaning of contaminated soil in situ by a side that is the technology used in the remediation of contaminated limited to minimum of waste disposal, including: elimination of sources of pollution - hazardous waste tar creosote deposited in the stainless steel vessel, by selecting the pitch, transportation and disposal, as well as the removal of liquids, tars and organic solid waste separated in the process of cleaning soil and groundwater, elimination of the steel tank by its refinement and scrapping, decommissioning of ground-ground dumps by separating mechanical sieve fractions of coarse debris and other waste, Removal of infrastructure - the foundation of the tank, crane, dump rectangular tank (if not you will need to install flush ground) other foundations of the buildings, as well as debris from the selection and przekruszeniem debris (debris contaminated should be subjected to cleaning in place). structure measuring points consisting of piezometers and wells dredging project in accordance with the geological work referred to in point. 5.3. for the purpose of monitoring before, during and after remedial actions, installation of equipment for soil washing, cleaning appliances installed in the discharge of water from the soil to the flushing of the sewer system, in this case, the Contractor will be required for the daily monitoring of the water quality discharged from the washing place to the sewage system, in order to preserve its limit parameters set by the network Gestora, elimination of existing soil contamination by a side, in particular, site preparation and glands for future heap leaching bioremediation and recognition of piles, mining and perform rinsing the most contaminated soil incorporation podoczyszczonego created a heap of ground technology for bioremediation of assumed dimensions: length of about 400 m, base width 12 m, height 3 m, width 2 m plateau, and if there is more land intended for bioremediation, create large piles of change after consultation with the Employer, fill the resulting trench foundations and strongly contaminated land soil pollution free, meeting the requirements for soil quality grade B according to applicable laws, filling made of layered soil compaction to minimize future settlement, the creation of remediation on separate plots of land areas with an average contamination, after washing soil in situ, the machine crushing and mixing the surface layer of soil, pumping contaminated water in case of inflow to the excavation, transport and cleaning to the level required for water quality class III groundwater (for injection), or the requirements of the Gestora sanitation (if discharged into the sanitary sewer), dosing the surface of each plot and the surface of the prism technology biopreparation, produced on the basis of indigenous soil microorganisms in sufficient concentrations and maintain good conditions for the development of micro-organisms (periodic fertilization and spraying). Cleaning up the area and development including backfilling and leveling of land plots, macrolevelling land surface sodding pile of grass seed or from a roll, after the stabilization of the ground and found the effectiveness of rehabilitation treatments, Landscape architecture by sowing grass, gravel paths performance-clay planting of deciduous and coniferous trees and shrubs fill the area after the completion of treatment and found the effectiveness of rehabilitation treatments, removal facilities and other technical equipment used for land reclamation. Environmental monitoring of soil and water in the area covered by the contract consisting of: collecting and chemical analyzes of soil samples at least once every six months in a laboratory accredited for compliance with ISO 17025 for contaminants found in this area indicated in the restoration project, collecting and chemical analyzes p

Liquidation and reclamation of the land designated for the storage of packaging of plant protection products, ie. Landfill is located in the village Baciuty.

 | Published October 30, 2013  -  Deadline November 14, 2013
cpvs
90000000

The contract is for Decommissioning and reclamation of the land designated for the storage of packaging of plant protection products ie tomb located in the village Baciuty. Object of the contract and in particular: 1) preparing the ground for the implementation of the work - one set of two) open pit, mining waste, packing transportation and disposal (waste code - 020108 *, 150110 *) - 21.4 Mg 3) elimination of concrete tanks and transport disposal (waste code - 170106 *) - 6.97 Mg 4) extraction of contaminated soil, transport and unieszkoliwianie (waste code - 170503 *) - 97.33 Mg 5) reclamation of land - 132 Mg 6) performance testing and analysis of land - 12 unit 7) perform local monitoring network - 1 set of 8) performance report on the work carried out - one piece Contractor shall obtain all necessary permits. Detailed description of the contract and scope of work includes design documentation Purchaser requires that the Contractor has made calculations based on the attached draft demolition. If design documents or other documents attached hereto describes the subject matter of the contract indicating the terms, signs referred to in Art. 29, paragraph 3 and Article 30 paragraph 1-3 Public Procurement Law, must be assumed that such indication is accompanied by the term: or equivalent, equivalently described. The contractor, who relies on the solution equivalent to those described by the Purchaser is obliged to prove that it is offering supplies, services or works meet the requirements specified by the contracting authority - Art. Paragraph 30. 5 of the Public Procurement Act.

LIQUIDATION AND RECLAMATION OF LAND INTENDED FOR STORAGE AFTER PACKAGING PLANT PROTECTION PRODUCTS TJ. MOGIELNIKA SITUATED IN THE VILLAGE Baciuty.

 | Published January 22, 2014  -  Deadline February 7, 2014
cpvs
90000000

The contract is for liquidation and rehabilitation of the land designated for the storage of packaging of plant protection products ie tomb located in the village Baciuty. Object of the contract and in particular: 1) the preparation of land for carrying out the work - 1 set of 2) opening wells, mining waste, packing transportation and disposal (waste code - 020108 *, 150110 *) - the estimated amount of 21.4 Mg 3) elimination of concrete tanks transportation and disposal (waste code - 170106 *) - the estimated amount of 6.97 Mg 4) extraction of contaminated soil, transportation and disposal (waste code - 170503 *) - the estimated amount of 97.33 Mg 5) reclamation of land - estimated number of 132 Mg 6 ) performance testing and analysis of land - 12 pcs 7) performance of local monitoring network - 1 set of 8) performance report of the work carried out - 1 piece Contractor shall obtain all necessary permits. Detailed description of the contract and scope of work includes design documentation Purchaser requires that the Contractor has made the calculation based on the attached draft demolition. If the project documentation or other documents attached hereto describes the subject matter of the contract indicating the terms, the indications referred to in Art. 29, paragraph 3 and Article 30 paragraph 1-3 Public Procurement Law, must be assumed that such indication is accompanied by the term: or equivalent, equivalently described. The contractor, who shall be appointed for a solution equivalent to those described by the Employer is obliged to prove that offered by the supplies, services or works meet the requirements specified by the contracting authority - art. 30 paragraph. 5 of the Public Procurement Act ..

Partial repairs roads, sidewalks and repair breakthroughs on roads administered by the City of Knurów.

 | Published January 23, 2015  -  Deadline February 10, 2015
cpvs
45233142

Object of the contract includes the execution of partial repairs roads, sidewalks and repair of road breakthroughs administered by the City of Boars. The material scope of the partial repair of roads and pavements. Repair - removal of defects in the road asphalt: cut chainsaw damaged areas around the defect with granting regular shapes, giving back or milled mass at the site of damage and clean the damaged area, lubricate the edge of the renovated space and sprinkling emulsion asphalt paving mixtures of mineral - bitumen in two layers - 5 and 5 cm, mechanical compaction of the individual layers arranged blend using roller or a vibrating plate, lubricate the edge of the renovated space imposition of asphalt emulsion and aggregate, clearing the place of work and transport of debris to the Contractor's own storage space. Repair - removal of bumps, cracked surface and zaniżeń in the road asphalt: making cuts in the road asphalt predetermined places, giving back or milled mass at the site of damage and cleaning the damaged area, 10-ciocentymetrowej loosening the top layer of the foundation is very contaminated soil, cleaning up and execution of its gain, involving the laying of a new layer of crushed stone thickness of 10 cm, or alignment of the losses crushed to the required grade line, paving mix mineral - 5 cm thick bituminous mechanical compaction laid blend using roller or a vibrating plate, lubricate the edge of the renovated space and the imposition of asphalt emulsion aggregate, clearing the place of work and transport of debris to the Contractor's own storage space. Vertical adjustment wells for devices located in the road: regulation of street inlets manhole adjustment sawing and concrete asphalt surface to a depth of 10 cm. The scope of work in normal mode: on the basis of the indications of the Purchaser arising from its requirements contained in the order of / g pattern constituting the attachment No. 1 to the standard contract. 2 of the Agreement: 4.1. accession to the contracted work in normal mode, the date declared by the Contractor in the offer, counting from the date of the order to the Contractor. The maximum time to join the contracted work in normal mode can not be longer than 3 days from the date of the order. The transfer orders will be carried out in each case at the Purchaser, and if this is not possible, send an e-mail or fax; 4.2. accession to the contracted work in safe mode, ie. in the event of damage to the roadway type of deep loss or breach, the collapse of the sewer grates, manhole sewer, threatening the safety of traffic (eligible each Employer): marking a designated location within 2 hours of the telephone notification Repairs to 24 hours of acceptance. Employer provides that during the execution of the agreement this occurs up to 3 times.

Liquidation landfill cullet mercury-containing part of the plot No. 11/4 AM-20 precinct Popowice Street. Strzegomska 57 in Wroclaw.

Gmina Wrocław – Urząd Miejski Wrocławia | Published March 27, 2014  -  Deadline May 7, 2014
cpvs
90520000, 90512000, 90533000, 90715000

The contract is for the service to remove the waste cullet mercury lamps mixed with diatomaceous earth and other waste located at ul. Strzegomska 57, part of plot No. 11/4 AM-20 precinct Popowice. Waste provided to remove it: - 190204 - premixed wastes composed of at least one hazardous waste (diatomaceous earth mixed with cullet glass mercury lamp with fragments of films derived from the remains of plastic bags, in which the waste was originally packaged) - 170204 - waste wood, glass and plastics containing or contaminated with dangerous substances (HDPE foil with a thickness of 1.5 mm covering the waste heap of the area. approximately 360 m2) - 170106 - mixed or separate fractions of concrete, bricks, ceramic materials and items of equipment containing hazardous substances (plates and concrete, located in an area of ​​approximately 690 m2, which made waste) - 170503 - soil and stones containing dangerous substances (soil layer located under concrete slabs on which were waste pile on the area. 690 m2). The removal of this waste is dependent on soil test results and will be only in the case when they show exceeded standards in terms of quality of soil mercury content. By removing the waste is meant to collect the waste from the area of ​​real estate, preparing them for transport, transport to places of processing, transfer to processing or processing on your own (if you have appropriate permissions) listed above waste. The Contractor must ensure that the removal of wastes in a manner consistent with the provisions of the Act of 14 December 2012. Waste (Journal of Laws of 2013. No. 21), and specific provisions. The contractor will perform the work sampling soil and earth from the site, which will be removed waste and ensure the execution, by an accredited laboratory having implemented a quality system in accordance with the Act of 30 August 2002. Conformity Assessment System (Journal. Laws of 2010. No. 138, item. 935, as amended), tests made on samples to determine soil quality standard in terms of mercury content. As part of the contract the Contractor shall remove a portion of contaminated soil and ground (pollution confirmed the above. Tests of soil samples) and clean up the area after the work is complete. Territorial scope of work includes the area of ​​the area. 690 m2, the property designated as part of the plot No. 11/4 AM-20 Popowice precinct, located in the city of Wroclaw, ul. Strzegomska 57 Detail the subject of the contract is specified in the Description of Scope of the Order. Conditions for performance of the contract is a draft contract. The contractor is required to designate one person acting in the course of the service function works manager (person who performs supervision over the execution of the work).

Restoration of the proper environment for the area around the old settlers of underground waters Street. Sadowski in Piekary

 | Published October 24, 2013  -  Deadline November 8, 2013
cpvs
90700000, 45112710, 77310000

1 The contract: The contract is to restore the environment to a state of proper land around the ancient settlers of underground waters Street. Piekary Sadowski in accordance with the technical execution of the works project aimed at restoring the environment to a state of proper land around the ancient settlers of underground waters Street. Sadowski in Piekary, made in August 2010 by AGOS-Gémes Sp. z oo with its registered seat in Katowice. Land suitable for reclamation is located in Piekary between ul. Sadowski and River Brynica, which was built seven coal mine Andalusia settlers pit water. Three of the seven settlers rented by a foreign entity and used as objects of regeneration station disintegration. Basin area is limited to the north - west embankment of the river Brynicy and on the south embankment st. Sadowski. The eastern border of the area of ​​the former excavation popiaskowe. The area around the settlers planted with trees - samosiewami. When the inventory was predominantly willow, poplar and birch papillary. Settlers of the area around the landfill site of unknown origin: municipal, repair and construction works, industrial and hazardous. Soils in these ravines and partly in the basin of the former pit popiaskowego are contaminated with heavy metals and mineral oils. The total area of ​​the areas in which it was found exceeding the quality standards of the soil is 2.91 ha. 1.1. The scope of work of reclamation detail the bill of quantities presented in Annex 4 hereto, and includes execution: 1) Preparatory Works for: partial removal of trees that interfere with rational areas of technology and sharing of contaminated soils with shrubs grubbing, removal of defaulting on the subject area of ​​waste ( including hazardous unknown origin). 2) Reclamation technical areas: removal of land which do not meet the quality standards of soil group B and compensate the loss of land created after the removal of contaminated soil. 3) Reclamation facilities in the area: zatrawienia area and spreading of mineral fertilizers. 4) as-built surveys of soil quality control standards. Reclamation works to be carried out in accordance with the technical execution of the works project aimed at restoring the environment to a state of proper land around the ancient settlers of underground waters Street. Sadowski in Piekary, constituting Appendix 5 hereto and decisions Mayor Piekary Ontario: No. 46 dated 14.04.2009 and No 137 of 07.07.2010, Annex No. 6 and 7 hereto ..

Repair of the roof of the pavilion lions. Repair fences runs Koby, Niala and Addaksy. Repair drainage runs along the alley ponies with a well absorbent.

 | Published June 25, 2013  -  Deadline July 10, 2013
cpvs
45000000, 45111240, 45232451, 45232454

Package 1: Repair of the roof pavilion lions. 1.Remont roof. 1.Drobne repair coverage holes zakitowaniu involving the removal brackets lightning protection and other leaks. 2.Drobne repair coverage of inserting the patch with heat seal backing membrane in cracks and protruding membrane patches. 3.Zagruntowanie existing roofing membrane with heat seal, asphalt solution. 4.Pokrycie torching membrane roof with a minimum thickness. 5.4 mm on the base with non-woven polyester. 5.Wykonanie treatments of heat-sealable membrane, fire walls, roof windows, ventilation fans and fireplaces. 2.Wymiana and follow-up of gutters and downpipes. a) Check and clean the gutters. Mounting brackets obruszonych with proper inheritance - it concerns one of the roof. b) Careful removal of gutters and downpipes from the roof of one hand in order to replace damaged gutters and downspouts on the other side of a pitched roof. c) the installation of new gutters and downspouts on one side of a pitched roof. d) Other gutters, downspouts and accessories suitable for use, submit to an investor. Package No. 2: Repair runs Koby, Niala and Addaksy. 1 Purification of the lower frame fence contaminated soil, rubble and asphalt. 2 Laying re osuniętych slabs and stone ditches on slopes over fences. 3 Removal scraped using hammers or thick corroded layer of rust and fencing elements. 4 Thorough cleaning, using power tools. 5 Degree of separation and degreasing fence. 6 Deeply corroded surfaces should be primed (painted White UREKOR S or equivalent). 7 The fence paint primer (White rust or equivalent) in a dark matt green. Package 3: Repair of drainage runs along the alley ponies along with a well absorbent Repair of worn-tech drainage catwalk ponies along the alley with the construction of a new soakaway. The scope of work is defined sketch and Takeoff and is composed of the following works: 1 The drying of the alley as a stream at the curb. 2 Implementation of sewage wells with a diameter of 500 mm. 3 Design soakaway a diameter of 1 500 mm. 4 Laying of PVC pipe channel with a diameter of 200 mm between the wells. 5 Reconstitution of the alley pavement by laying paving stones with a thickness of 8 cm. 6 Removal and disposal of excess soil and bitumen deposits derived from the demolition ..