Public tenders for contaminated-soil in Hungary

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Azbesztpalával removing contaminated soil

VÁRVAG Városfejlesztési és Vagyongazdálkodási Nonprofit Közhasznú Korlátolt Felelősségű Társaság | Published June 3, 2015
Winner
DESIGN Kft. a DESIGN Kft. és a MAJOROS Kft. közös ajánlattevők képviseletében
cpvs
90522100

Removal of contaminated soil Azbesztpalával Cegled, downtown 5739/8 u. under the premise behind the concrete plant 200 m2 L-shaped area of ​​the Central Tisza Region Environmental and Nature Protection Inspectorate 5098-20 / 2014th Based on Resolution No.. The total amount of soil containing asbestos, construction waste 100 m3, which + 100% tolerance

Services relating to contaminated soil

Magyar Közút Nonprofit Zrt. | Published November 26, 2016  -  Deadline December 29, 2016
cpvs
90522000

The Hungarian Roads NZrt. full completion of environmental remediation works following road sections for accidents that occurred in the operation of business framework contract.

The object of the acquisition of the Hungarian Road NZrt. full completion of environmental remediation works after accidents have occurred in the operation covered roadway.

Contractual allocation: net HUF 50 million.

The contractor during the accident contaminated material (soil and water) extraction, removal and disposal (Transfer of disposal / recovery), sampling of contaminated material (pollution characterization) and the trench bottom (the extraction efficiency to justify), laboratory testing of samples, Charging the location of the extracted material, compressing the original terrain, compactness, rézsűhajlás restoration, grass, preparing damage control closing documentation, preparation of annual statements of shipped quantities of waste.

The Bidder should start the remediation work within 2 business days after written notification to the Contracting Authority (e-mail). If the weather conditions allow it, within 10 working days after it starts to the Offeror will be completed necessary and sufficient environmental damage in full warding off-site work (except for grassing), unless the schedule approved by the Contracting Authority and the contractor will, both sides are different timetable agree.

The Bidder agrees to prepare a damage control closing documentation within 30 days after completion of the work site and forward it to the contracting authority.

The Offeror will start grassing (regardless of the final documentation of delivery), when weather conditions permit.

The total volume of detailed technical requirements included in the technical specifications as part of the procurement documents.

Construction Contract "(.. 08/2 lot number) of the Hajdúsági Solid Waste Landfill and Recovery Association Member of town, abandoned Görbeháza Township municipal solid waste landfill remediation of complete liquidation under FIDIC Red Book".

Hajdúsági Szilárd Hulladéklerakó és Hasznosító Társulás | Published September 25, 2013
Winner
KEVIÉP Építőipari és Kereskedelmi Kft. és Geohidroterv Kft.Széchenyi u. 46.Debrecen 4025 center@keviep.hu +36 52513700 +36 52513723
cpvs
45000000, 45100000, 45111213, 45111250, 45112700, 77314100, 71320000, 90510000, 90512000

The work required to implement assessment and updating the facility to prepare the necessary plans. The design work consists of the following sub-tasks: 1 Making other tasks required to carry out remediation plans; 2 Preparation of quality assurance plan; 3 environmental, analytical testing, sampling plans; 4 providing engineering technical management; 5 Preparation of technical work is handed over to the as-built documentation, and acceptance of authority. The approved reclamation plans available. The main technical volumes: Volume Településrekultiváció way / deposited waste (m3) / Contaminated soil (m3) / Landfill area (m2) / Rekultiválandó area (m2) building / drilling (x) Görbeháza complete liquidation / 8000 m3 / 800 m3 / 8000 m2 / 8000 m2 / 10 1 "B" billboard placement - with supporting structure - the project site, prior to the start of construction work. 1 "D" reminder signs at project - together with supporting structure - the site of the project, after completion of the construction work.

Result of environmental remediation subject field MÁV Zrt., Outside the train station Salgótarján procurement process

MÁV Magyar Államvasutak Zrt. | Published July 17, 2015
Winner
Profes Környezetbiztonsági Programiroda Kft.
cpvs
90722200, 90732300, 90732600, 90733700, 90733900

The contractor (Contractor) all obligations specified incurred during the procurement procedure documents (invitation to tender, tender documentation, technical specifications, draft contract, any additional information) should fulfill, all the tasks you must complete the required result must be at or complies with all applicable legal requirements, guaranteeing the official acceptance document (s) must be representative of MÁV Zrt. hand over. The conclusion of a contract will be fulfilled by achieving the following results: the work of the legal requirements, regulatory requirements in all appropriate documentation (k) acceptance by customers and authorities (final decision) ends. The required services under the Contaminated soil and groundwater extraction (indicative amounts) monitoring: - (D) target rate of remediation of contaminated above the limit geological bioprizmákba extraction and deposition, and the required overburden extraction, deposition. - (D) over the treatment of contaminated soil pollution limit values ​​(on site), restore. - Vízkitermelő and installation of water treatment / purification system, operational, licensing, operation and liquidation. - (D) above the remediation target limit of contaminated cleaning groundwater in munkagödörből groundwater yield (úszózsomppal), spot (on site) mobile water treatment equipment (oil separation, (D) remediation target above the limit of contaminated water multiple (four) cranking (extraction of groundwater and treatment). - formed by the action of waste classification, transfer, receiving it officially licensed environment has to producers under the Act Act CLXXXVI 2012 on waste, waste of MÁV Zrt. -. When transporting recording and reporting of hazardous waste related to all waste in ADR consignor by the obligations borne by the Offeror. - Kármentesítési- and utómonitoring (build in and in the water right permit (s) of the water rights permit plan (s), in accordance, operating authorization, operations (sampling, maintenance, water level measurement), termination). - Recultivation (elimination of water facilities licensed after reloading landscaping, grass). - Required water rights management, provisioning licensing documentations, FAVI data sheets, monitoring reports and preparation of final documentation. Offeror's offer of technical-professional and RTD: 3616-11 / 2014th c. it has to be given time to achieve remediation target laid down in Decision (D) limit its offer includes full profit responsibility. The amounts and details of the accepted concept of intervention in the tender dossier annexed plans, documentation found. A detailed job description, the contracting requirements, background information on the project as part of the technical documentation, tender documentation for details. Performance dates: - Begin installing vízkitermelő and water treatment / purification system, completing remediation monitoring remediation work: within 90 days after the water rights permit receipt day after - contracting, or - if at the time the contract is concluded in the water right permit is not yet contracting disposal . - The duration of the trial run Intervention (+ remediation monitoring): 9 months, which is not included in the duration of the official authorization procedure. - Remediation utómonitoring time: monitoring orders

Underground car park construction work

Millenáris Széllkapu Beruházó, Fejlesztő és Üzemeltető Nonprofit Kft. | Published October 19, 2016
cpvs
45223310

Garage 500 Area: 17 755 m²; Level 2; manual car wash, electric car charger, supporting office. Reinforced concrete frame construction, watertight concrete slab foundation. Gépészeti-, high-voltage and low-voltage systems, utilities, buildings: 2 030,56 m²; 2 cafés; Park: 33 184 m²; utilities, rough terrain, land filling, landscaping -dísztavak approx. 651 m², paved areas or buildings covered surface. approx. 8184 m²; roads around the park renovation and construction of public lighting, térbútorozás; Fountain approx. 174 m². Installation texture mixed steel / concrete structures useful (net) floor area: 2 063,7 m²; steel-framed structure, overall size approx. 228.5 * 6.5 m; The maximum height of 18.60 m; Work: Light Street: 100.61 m long, reinforced concrete underpass road, roadway reconstruction; Working area limitation, drainage systems and slurry wall zagyfal; built baseplate under the blanket drainage, drainage network; Breakdown: below the current ground level is still potentially existing structures / construction remains. A part of the contaminated soil.

Lahóca elimination of environmental damage associated with mountain színesfémbányászathoz II. schedule - Surface jobs - No. 3 contract modification

Nitrokémia Környezetvédelmi Tanácsadó és Szolgáltató Zrt. | Published August 12, 2016
Winner
Vértesi Környezetgazdálkodási Kft.
cpvs
90722200, 45254100, 45110000, 71356400

Contaminated with hazardous waste (soil, chemicals, reactive materials, demolition debris) in an amount of about 20,000 and about 20,000 t of contaminated letermelése amount, collection and transport of non-hazardous waste (soil, spoil, demolition debris).
Streams, reservoirs remediation within the framework of the Interim bypass channel construction of about 1,700 m long, waterways dredging and waste disposal 600 m3.
The tailings from the H-1 and H-2 design of water collection network, 132 m3 / day capacity of active water treatment plant (treatment of acidic waters containing dissolved metals precipitation, lime milk pH adjustment) design, three-month trial operation to conduct leak contaminated.
Three types of different sized load bearing capacity for road construction a total of 2,500 linear meters in length.
Other, smaller amounts of important items and technical specifications of the tender documents can be found.
Quantity:
# 1130 m from 2.5 to 8.5 m deep slurry wall construction waterproofing
# 1000 m 1-3 m high building temporary gabiondobozos támasztótöltés
# Surface treatment adverb 1.6 t CaCO3 stabilizer consumption in 1600
Rate # 130,000 tonnes of flotation tailings, preparation, transportation (H1 tailings pond)
# 8000 m2 landscaping dump (top layer design, storm water drainage system design)
# 8000 m2 surface dump enhance plant
# 165,000 tons of tailings material sorting, classification, treatment, átdeponálása
# dump developing area of ​​15,000 m2 impermeable slot
# 200 m long támasztótöltés construction, drainage
# 11,000 tons of demolition debris, contaminated soil letermelése, disposal
# 20,000 tons of hazardous waste ground letermelése, collection, transportation,
# 20,000 tons of non-hazardous waste ground letermelése, collection, transportation,
# 1,700 m channel construction
# 600 m3 waterways dredging and waste disposal
# 1 design of water treatment plant
# 2500 linear meters of road construction

Lahóca elimination of environmental damage associated with mountain színesfémbányászathoz II. schedule - Surface jobs - No. 2 contract modification

Nitrokémia Környezetvédelmi Tanácsadó és Szolgáltató Zrt. | Published August 5, 2016
Winner
Vértesi Környezetgazdálkodási Kft.
cpvs
90722200, 45254100, 45110000, 71356400

Contaminated with hazardous waste (soil, chemicals, reactive materials, demolition debris) in an amount of about 20,000 and about 20,000 t of contaminated letermelése amount, collection and transport of non-hazardous waste (soil, spoil, demolition debris).
Streams, reservoirs remediation within the framework of the Interim bypass channel construction of about 1,700 m long, waterways dredging and waste disposal 600 m3.
The tailings from the H-1 and H-2 design of water collection network, 132 m3 / day capacity of active water treatment plant (treatment of acidic waters containing dissolved metals precipitation, lime milk pH adjustment) design, three-month trial operation to conduct leak contaminated.
Three types of different sized load bearing capacity for road construction a total of 2,500 linear meters in length.
Other, smaller amounts of important items and technical specifications of the tender documents can be found.
Quantity:
# 1130 m from 2.5 to 8.5 m deep slurry wall construction waterproofing
# 1000 m 1-3 m high building temporary gabiondobozos támasztótöltés
# Surface treatment adverb 1.6 t CaCO3 stabilizer consumption in 1600
Rate # 130,000 tonnes of flotation tailings, preparation, transportation (H1 tailings pond)
# 8000 m2 landscaping dump (top layer design, storm water drainage system design)
# 8000 m2 surface dump enhance plant
# 165,000 tons of tailings material sorting, classification, treatment, átdeponálása
# dump developing area of ​​15,000 m2 impermeable slot
# 200 m long támasztótöltés construction, drainage
# 11,000 tons of demolition debris, contaminated soil letermelése, disposal
# 20,000 tons of hazardous waste ground letermelése, collection, transportation,
# 20,000 tons of non-hazardous waste ground letermelése, collection, transportation,
# 1,700 m channel construction
# 600 m3 waterways dredging and waste disposal
# 1 design of water treatment plant
# 2500 linear meters of road construction

Landscape architectural services

Bányavagyon-hasznosító Nonprofit Közhasznú Kft. | Published April 27, 2017
Winner
HKB Konzorcium
cpvs
71420000, 90722200, 90711500

During construction the following work should be carried out (the specified amounts are estimates):

- improve, strengthen (3970 m²) Crawler road

- beside Excavation pit (160 m³)

- Concrete map, sub-base, breaking wells (830 m³ solid)

- concrete rubble loading (up and down) (1430 m³ loose)

- Delivery of concrete fragments (loose m³ * 28 520 km)

- placing concrete fragments (1,430 m³)

- Sand, green waste, subsoil, waste loading (up and down) (80 m³)

- Sand, green waste, subsoil, waste transport (1500 km * m³)

- Sand, green waste, subsoil, positioning eye (80 m³),

- classified as hazardous waste drilling mud yield (100 m³ solid)

- classified as hazardous waste drilling mud removal site license (2700 km * loose m³)

- classified as hazardous waste disposal of drilling mud (200 m³ loose)

- Soil material supply rate (930 m³ solid)

- Soil loading (up and down) (1286 m³ loose)

- Soil transport (28 130 km * loose m³)

- Deposited land leveling, landscaping (1,620 m²)

- Agrotechnikai recultivation, spatial resolution (8,060 m);

- Non-contaminated soil extraction and Restore (100 m³)

- Cut wood, felling (0.4 ha)

- header conversion (csőelvágás, tubular cap being manufactured, pressure gauge, needle valve equipment) ( "0"),

- Control laboratory test sample (28 pieces)

- Restore the approach path to its original state (3970 m²)

- impairment of vegetation (7,380 m²)

- Soil Conservation Plan (land has been transferred into) 8,

- replacement or conversion (csőelvágás, pipe caps manufactured, pressure gauge, needle valve equipment) The head tube is recognized based on the actual amount.

During construction the following work should be carried out (the specified amounts based on estimates 2 kútkörzet recultivation)

- Improving access roads, reinforcement (860 m²)

- beside Excavation pit (30 m³),

- Concrete map, sub-base, breaking wells (305 m³ solid)

- Concrete debris loading (up and down) (610 m³ loose)

- Delivery of concrete fragments (loose m³ * 18 300 km)

- placing concrete fragments (610 m³)

- Sand, green waste, subsoil, waste loading (up and down) (15 m³)

- Sand, green waste, subsoil, waste transport (275 km * m³)

- Sand, green waste, subsoil, positioning eye (15 m³),

- classified as hazardous waste drilling mud yield (176 m³ solid)

- classified as hazardous waste transportation of drilling mud site permit (13 200 km * loose m³)

- classified as hazardous waste disposal of drilling mud (264 m³ loose)

- Soil material supply rate (481 m³ solid)

- Soil loading (up and down) (681 m³ loose)

- Soil transport (16 370 km * loose m³)

- Deposited land leveling, landscaping (920 m²)

- Agrotechnikai recultivation, spatial resolution (2,220 m²)

- No extraction of contaminated soil and restore (17 m³)

- Cut wood, felling (0.02 ha),

- header conversion (csőelvágás, tubular cap being manufactured, pressure gauge, needle valve equipment) ( "0"),

- Control laboratory test sample (13 pieces)

- Restore the approach path to its original state (860 m²)

- impairment of vegetation (1,260 m²)

- Soil Conservation Plan (has been transferred into the soil) 2,

- replacement or conversion (csőelvágás, pipe caps manufactured, pressure gauge, needle valve equipment) The head tube is recognized based on the actual amount.

During construction the following work should be carried out (the specified amounts are estimates):

- improve, strengthen (3970 m²) Crawler road

- beside Excavation pit (160 m³)

- Concrete map, sub-base, breaking wells (830 m³ solid)

- concrete rubble loading (up and down) (1430 m³ loose)

- Delivery of concrete fragments (loose m³ * 28 520 km)

- placing concrete fragments (1,430 m³)

- Sand, green waste, subsoil, waste loading (up and down) (80 m³)

- Sand, green waste, subsoil, waste transport (1500 km * m³)

- Sand, green waste, subsoil, positioning eye (80 m³),

- classified as hazardous waste drilling mud yield (100 m³ solid)

- classified as hazardous waste drilling mud removal site license (2700 km * loose m³)

- classified as hazardous waste disposal of drilling mud (200 m³ loose)

- Soil material supply rate (930 m³ solid)

- Soil loading (up and down) (1286 m³ loose)

- Soil transport (28 130 km * loose m³)

- Deposited land leveling, landscaping (1,620 m²)

- Agrotechnikai recultivation, spatial resolution (8,060 m);

- Non-contaminated soil extraction and Restore (100 m³)

- Cut wood, felling (0.4 ha)

-

Landscape architectural services

Bányavagyon-hasznosító Nonprofit Közhasznú Kft. | Published December 23, 2016  -  Deadline February 8, 2017
cpvs
71420000, 90722200, 90711500

Disused mine deep drilling for full reclamation of mining 2017th

A detailed description of the tasks found in the tender documents.

8 pieces kútkörzet reclamation. During the execution should be carried out (given the estimated quantities of data) in the following works:

- Improving access roads, reinforcement (3970 m²)

- Excavation beside mine (160 m³)

- Space Concrete, deep base, breaking the wells (830 solid m³)

- Concrete debris loading (up and down) (1430 loose m³)

- Delivery of concrete fragments (loose m³ * 28 520 km)

- Placing Concrete Debris (1430 m³)

- Sand, green waste, subsoil, waste loading (up and down) (80 m³)

- Sand, green waste, subsoil, transportation garbage (1500 km * m³)

- Sand, green waste, subsoil, waste disposal (80 m³)

- Hazardous-waste extraction drilling mud (100 m³ of solid)

- Premises licensed hazardous-waste drilling mud removal (2700 km * loose m³)

- Hazardous-waste disposal of drilling mud (200 m³ loose)

- Sol Price material supply (930 solid m³)

- Sol loading (up and down) (1286 loose m³)

- Sol transport (28 130 km * loose m³)

- Deposited land leveling, landscaping (1620 m²)

- Agro Technical reclamation, land-use planning (8060 m);

- No extraction of contaminated soil and restore (100 m³)

- Felling, felling (0.4 ha)

- Head Pipe transformation (csőelvágás, pipe caps manufactured, pressure gauge, needle valve equipment) ( "0")

- Control laboratory test sample (28 pieces)

- Restoring the original condition of the approach route (3970 m²)

- Zöldkár (7380 m²)

- Soil Conservation Plan (to be laying, ground) 8,

- Replacement or conversion (csőelvágás, pipe caps manufactured, pressure gauge, needle valve equipment) The head tube is recognized based on the actual amount.

Elimination of environmental damage associated with Lahóca mountain színesfémbányászathoz II. rate - surface problems.

Mecsek-Öko Környezetvédelmi Zrt. | Published July 30, 2013
Winner
Vértesi Környezetgazdálkodási Kft.Ipartelep hrsz. 0210Oroszlány 2840 csaba.attila@vkg.hu +36 209374448 +36 72535388
cpvs
90722200, 45254100, 45110000, 71356400

Necessary to take into account the context of the project objective is to protect surface and ground water remediation, completion of remediation activities, the possibility of a future recyclability. The south central dump (now H-1 flotation tailings) initial rate of urban planning in which the framework is carried out: about 1130 M 2,5 - 8,5 m deep impermeable slurry wall, 1000 m 1-3 m high temporary gabiondobozos támasztótöltés, the reservoir surface preparation for receiving material to be delivered (vegetation clearing, landscaping, morphology develop 7.4 hectares), the management of reservoir surface area of ​​about 1.6 ha in 1600 was the use of CaCO3-containing stabilizer area. Classification of H-2 dump material, pre-treatment of the flotation tailings (about 130 000 t) transfer of the H-1 tailings pond, the residual waste dump landscape architectural overlay structure design approximately 20 000 sqm area, plants Certified (tree planting, grassing) development of about 8,000 sq ft - of area, development of storm water drainage system already. Completion of the first phase of the north central dump landscapers, within this framework, the H-7 total, H-8 tailings material partial separation, sorting, handling, átdeponálása about 165 000 t of one subsequent recycling into account, the preparation of the dump waterproof substrate of 15 000 m² area , other related works for a landscaping: Interim támasztótöltés construction, drainage 200 m. Mine was operating in areas contaminated demolition debris and contaminated soil letermelése and disposal in an amount of about 11 000. Contaminated with hazardous waste (soil, chemicals, waste materials and demolition debris) and an amount of about 20 000 t of contaminated non-hazardous waste (soil, waste material and demolition debris) in quantities letermelése, collection and disposal of about 20 000 t. Watercourses, aquifer remediation under: Construction of temporary bypass channel around 1,700 m in length, waterways dredging and waste disposal 600 m³. The tailings from the H-1 and H-2 leaking contaminated water collection network design, 132 m³ / day capacity water treatment plant active (treatment of acidic water containing dissolved metals precipitation, lime milk pH adjustment) design, conduct three-month trial run. Three types of different sized bearing capacity roads total of 2,500 meters of length. Other minor items are important and detailed technical specifications of the tender documents can be found.

Landscape architectural services

Bányavagyon-hasznosító Nonprofit Közhasznú Kft. | Published April 22, 2017
Winner
HKB Konzorcium
cpvs
71420000, 90722200, 90711500

Disused mine deep drilling for full reclamation of mining.

8 pieces kútkörzet recultivation. During construction the following work should be carried out (the specified amounts are estimates):

- improve, strengthen (3970 m²) Crawler road

- beside Excavation pit (160 m³)

- Concrete map, sub-base, breaking wells (830 m³ solid)

- concrete rubble loading (up and down) (1430 m³ loose)

- Delivery of concrete fragments (loose m³ * 28 520 km)

- placing concrete fragments (1,430 m³)

- Sand, green waste, subsoil, waste loading (up and down) (80 m³)

- Sand, green waste, subsoil, waste transport (1500 km * m³)

- Sand, green waste, subsoil, positioning eye (80 m³),

- classified as hazardous waste drilling mud yield (100 m³ solid)

- classified as hazardous waste drilling mud removal site license (2700 km * loose m³)

- classified as hazardous waste disposal of drilling mud (200 m³ loose)

- Soil material supply rate (930 m³ solid)

- Soil loading (up and down) (1286 m³ loose)

- Soil transport (28 130 km * loose m³)

- Deposited land leveling, landscaping (1,620 m²)

- Agrotechnikai recultivation, spatial resolution (8,060 m);

- Non-contaminated soil extraction and Restore (100 m³)

- Cut wood, felling (0.4 ha)

- header conversion (csőelvágás, tubular cap being manufactured, pressure gauge, needle valve equipment) ( "0"),

- Control laboratory test sample (28 pieces)

- Restore the approach path to its original state (3970 m²)

- impairment of vegetation (7,380 m²)

- Soil Conservation Plan (land has been transferred into) 8,

- replacement or conversion (csőelvágás, pipe caps manufactured, pressure gauge, needle valve equipment) The head tube is recognized based on the actual amount.

Information treaty amendment - Botanical Garden

Pécsi Tudományegyetem | Published May 6, 2015
Winner
Nexus-CSV Kft.
cpvs
45453100, 77300000

A contract to renovate the UP Botanical Garden of the framework EEOP 3.1.2 / 2F / 09-11-2013-0030 applications. And the quantity # 1.sz built stone retaining wall reconstruction of 83.7 m2 Promenade renovation of 1,600.7 m2 2-3-4.sz # # 5.sz rainwater drainage renovation of 611.76 m # 6.sz stone retaining wall reconstruction of 81 8 m (25 to defend her recording of wood) # 9 No Phytotron house renovation breakdown 11.sz # 169.8 m2 Floor area of ​​the body of an Asian collection of 60 pieces + 2 pieces of # 12 / # a.sz shield fence 103.3 m. 12 No Braided fence reconstruction of 65.7 m # 13.sz Nursery for rainwater collection and building a leading here and the winter heating mains power supply 2 x 10.5 m3 feasibility, engineering and electrical works in accordance with the design documentation # 14.sz built (brick stone) fences renovating renovation of 1,628 m2 of existing Szaporítóház (hothouse) 213.2 m2 # 16.Meglévő greenhouses Electrical installation, creating air circulation (Palm House, Cactus House, epiphytic house) design documentation according to # Plant tables, table grills (joinery) Schedules According irrigation system building 15580 m2 - According to construction plans # Horticultural works as follows: Preparation: - 360 m² felling - Felling: 20-60 cm in diameter and 12 dried out tree felling dangerous in the arboretum (4903/2, 4903/1) and the use of greenhouses to be renovated In addition to (4909/1) is part of a machine is available, some hand-solved. (4910/3, 4910/2, 4903/2, 4903/1, 4899/2) - Rézsű visszaszedéssel development of land: 120 m² NE part of the park (Asia-Mediterranean collection), as well as removing them from contaminated soil removal landfill fee (4910/1) - Dry and dangerous branches of slaughtering the crane boom when more trees: 60 trees throughout the Park. (4910/3, 4910/2, 4903/2, 4903/1, 4899/2) - 150 m³ dry branch chipping - for fixing the retaining wall demolition of protected trees 25pcs. - Landscaping, road settlement, földfeltöltés1.000 m² terrace to the protection of existing plants, if necessary, removal of undesirable weed plants: cactus garden (4908), Mediterranean rock gardens (4910/3 SE slope, above the sports ground) English Garden (4908 and 4907/3: Area Under the Cactus House) - Installation of 108 large and small pieces of rock boulders unnecessary removal: Mediterranean garden (south-eastern slope 4910/3), cactus garden (4908) and the Japanese garden (4903/1) - B-design garden spiraling rózsaágyás diameter of 10 m. - Plant material, according to the list of existing wetlands prepare to install, if necessary, soil replacement, foil repair a total of 32 square meters Installations: - - Purchase of land animals required for installation transport: soil, manure, (360 m³) - Purchase of fixed acidic pH peat transport (50 pcs 300l's bag)

Information treaty amendment - Botanic Garden construction

Pécsi Tudományegyetem | Published May 6, 2015
Winner
NEXUS -CSV Kft.
cpvs
45453100, 77300000

A contract to renovate the UP Botanical Garden of the framework EEOP 3.1.2 / 2F / 09-11-2013-0030 applications. And the quantity # 1.sz built stone retaining wall reconstruction of 83.7 m2 Promenade renovation of 1,600.7 m2 2-3-4.sz # # 5.sz rainwater drainage renovation of 611.76 m # 6.sz stone retaining wall reconstruction of 81 8 m (25 to defend her recording of wood) # 9 No Phytotron house renovation breakdown 11.sz # 169.8 m2 Floor area of ​​the body of an Asian collection of 60 pieces + 2 pieces of # 12 / # a.sz shield fence 103.3 m. 12 No Braided fence reconstruction of 65.7 m # 13.sz Nursery for rainwater collection and building a leading here and the winter heating mains power supply 2 x 10.5 m3 feasibility, engineering and electrical works in accordance with the design documentation # 14.sz built (brick stone) fences renovating renovation of 1,628 m2 of existing Szaporítóház (hothouse) 213.2 m2 # 16.Meglévő greenhouses Electrical installation, creating air circulation (Palm House, Cactus House, epiphytic house) design documentation according to # Plant tables, table grills (joinery) Schedules According irrigation system building 15580 m2 - According to construction plans # Horticultural works as follows: Preparation: - 360 m² felling - Felling: 20-60 cm in diameter and 12 dried out tree felling dangerous in the arboretum (4903/2, 4903/1) and the use of greenhouses to be renovated In addition to (4909/1) is part of a machine is available, some hand-solved. (4910/3, 4910/2, 4903/2, 4903/1, 4899/2) - Rézsű visszaszedéssel development of land: 120 m² NE part of the park (Asia-Mediterranean collection), as well as removing them from contaminated soil removal landfill fee (4910/1) - Dry and dangerous branches of slaughtering the crane boom when more trees: 60 trees throughout the Park. (4910/3, 4910/2, 4903/2, 4903/1, 4899/2) - 150 m³ dry branch chipping - for fixing the retaining wall demolition of protected trees 25pcs. - Landscaping, road settlement, földfeltöltés1.000 m² terrace to the protection of existing plants, if necessary, removal of undesirable weed plants: cactus garden (4908), Mediterranean rock gardens (4910/3 SE slope, above the sports ground) English Garden (4908 and 4907/3: Area Under the Cactus House) - Installation of 108 large and small pieces of rock boulders unnecessary removal: Mediterranean garden (south-eastern slope 4910/3), cactus garden (4908) and the Japanese garden (4903/1) - B-design garden spiraling rózsaágyás diameter of 10 m. - Plant material, according to the list of existing wetlands prepare to install, if necessary, soil replacement, foil repair a total of 32 square meters Installations: - - Purchase of land animals required for installation transport: soil, manure, (360 m³) - Purchase of fixed acidic pH peat transport (50 pcs 300l's bag)

Groundwater pollution treatment or rehabilitation

Magyar Nemzeti Vagyonkezelő Zártkörűen működő Részvénytársaság | Published November 22, 2017  -  Deadline January 12, 2018
cpvs
90733900, 90513500, 90513600, 90513800

In the context of an Enterprise Contract, the dehumidification of sludge storage cassettes (Berhida III.) On the territory of the former Peremartoni Chemical Company.

The subject of public procurement is the implementation of the intervention ordered by the Central Transdanubian Environmental Protection, Nature Conservation and Water Inspectorate (now Central Transdanubian Environmental Protection and Nature Conservation Inspectorate, hereinafter referred to as "the Inspectorate"), in Case No. 18346/13 and No. 106175/13. (VII.21.) Korm.

- on the basis of a technical intervention plan approved in the said decision.

In carrying out the project, the following tasks are required:

Discharge of T1 reservoir.

- Partial harvest and passage of sludge waste (in situ treatment) - - 15 481 solid m3, 29 414 tonnes.

- Extraction, removal and disposal / disposal of polluted soils under and below the T1 reservoir - 8 561 solid m3, 16 266 tonnes.

- 23,000 m3 of utilizable receiving volume of technically injected space according to the type C layer set out in Decree 20/2006 KvVM, after layer stabilization of stabilized waste - 1 pcs.

- Pre-treatment of sludge waste with a high salt content (TDS value above 100,000 mg / kg), placed in a technically tolerated space - 22 293 m3, 42 356 tonnes.

- Formation of rainwater collecting system - 1 pcs.

- Landscape design (spatial planning, plantation) - 9 150 m2.

T2, T3, T4, T6, T7.

- Sludge waste extraction, removal and disposal (ex situ treatment) - 37 260 solid m3, 70 794 tonnes (expected 20% hazardous waste, 80% non-hazardous waste ratio).

- Extraction of contaminated soil (soil below the cartridges, polluted soil around the cartons, contaminated barrier) and removal and disposal / recovery - 28 857 solid m3, 54 828 tonnes.

- Landscape design (spatial planning, planting) - 31 400 m2.

Development and operation of the monitoring system.

The Contractor's contractual task is to provide the necessary field preparation tasks (typically geodetic measurements, planting, de-ammunition, demolition tasks) and to provide on-site working conditions , tire washers, loading areas, approaches, transport routes, handling areas). (The delivery route to be built between the road link and the boundary of the industrial area is technical content financed by non-EU subsidies, by the contracting authority own source.)

The task includes dismantling temporary facilities after remediation and restoring the area.

Tenderer's contractual task is to provide entrepreneur-side project management during the project period, to design and operate the project documentation system, to provide necessary data provision, to liaise with other project participants (typically Project Management Organization, Technical Inspectorate Organization, Information and Communication Organization).

For a detailed description of the tasks, see the procurement technical specifications.

Pécs, Tiborc u. Stormwater drainage work area in front of number 46

BIOKOM Nonprofit Kft. | Published July 6, 2015
Winner
Mélyépítő és Szolgáltató Kft.
cpvs
45000000, 45112000, 45232130, 45233251, 45233200

Number 46 in front of rainwater drainage works Main quantities: Background: Existing rainfall sewer connection must be routed through the southern half of existing rainwater on the street led to the 2688 price for u-u. Geodetic to work: The survey concluded that the proposed water utilities be built, supply lines, as there is no obstacle to the development of a site plan. Local height of M.2.j. esőnyelő mine fedlapmagassága: 139,90 m asl. Soil Mechanics: The local clay soil medium and particulate matter; I III.T engineering point of view can be classified into. During construction related works of art and laying in sewer drainage construction works that need not be foreseen. The open trench excavation voids and surface waters are protected during the time of construction. Recipients: This system allows for the possibility of the proposed sewer mains connection, so the need for insured recipients. Hydrologic and hydraulic calculations: The current status of the existing planning systems such as the attributes were calculated, the parameters of the existing channel and adapted to the environment of the planned system. Hydraulic calculations: an existing channel: d = 500 mm i = 7,60 ‰ vt = 1.75 m / s to about 0.4 Qm = 350.00 l / s Planned channel: d = 500 mm i = 17 ‰ vt = 2.50 m / s to about 0.4 Qt = 500.00 l / s> Q m = 350.00 l / s Fade depth Q m / Qt = 0.70 v / vt = 1.07 v 2.68 m / sh / d = 0.60 cm h = 30> 3 cm corresponds drainage ditch Host: According to the resolution, the operators létesítésnél current state of existing systems such as the attributes to be expected. 6.0.0.Vizi work affected area: The areas affected are government owned. Areas affected: .: 2686 u u u .: .: 2687 2688 2689 hrsz .: 7.0.0.Építendő facilities: CS-1-0-0 rainwater The end section will also last esőnyelő existing tubular shaft, thus ensuring the interconnection continuity of the proposed canal. The curb side of the property line of the existing basalt blocks demolished concrete ditch full of material made from the road side berm made of hardened Trg = 95% ensuring tightness. A reconciliation of the water drains placed SQUADRA The channels through curved grid esőnyelők attempts. D channel 1-0-0: 1-0-0-placed CS over drainage channel based on the total planned length CONCRETE Melior sz = 60/200 cm type of prefabricated structure .. The details of the plan related to newspapers and according to the statement of objects visible in the Annex. 8.0.0.Létesítmények statements and objects: F 1-0-0. Channels: CONCRETE Melior No. 60/200 cm = L = 41,20 m Channel: 50/200 cm LEIER TOTA L = 2 x 2 x 41,20 m Earthworks, cable routing: During the preparation of appropriate plumbing pipes beneath the sand bed around and take care necessary including plastic marker placed over the wire tape. The enclosure must be equipped with an accurate layer restoring order to the operators requirements. The channels and the development of mine-cleaning MI-10 167 / 5-6. horizontal and vertical styling based on the length of the floor plan and in accordance with section. The channels are open trench geodetic survey, high pressure cleaning, water retention test, examination of trenchless industry as well as TV and commissioning to be completed. Excavations in cuts and water from the surface to be protected. The road and green space restoration is done according to the original condition. Environment: The proposed water utility facilities, 314/2005. According to Government Decree. (XII.25.) Impact assessment are not obliged to. In case of a wreck to be the site of the wreck rekultivációjáról environment, contaminated soil removal provided. Other notes: used for general rules set out in Regulation 29 water facilities) on the design, location, size, construction and operation.. 31.) Ministry of Environment § 61-62-63. It is recorded in (residential area water management) were taken into account during the design and used. Árajánlatadásnál following a review of the plans required to match any comments designers.
  • 1