Call +44 800 9755 164

Public tenders for construction in Winterthur Switzerland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Government services

Bundesamt für Straßen Astra, Abteilung Straßeninfrastruktur Ost, Filiale Winterthur | Published November 4, 2016  -  Deadline January 10, 2017
National road N01 is fully furnished in a 2 x 3 lanes between Interchange Limmattal (not included) and the Zurich Nord intersection (not included) in the "bypass of Zurich North" with discount in total state . Gubrist tunnel is completed by a third gallery towards Bern. After the development works, construction of the two existing malls Gubrist tunnel will also be fully restored. The project aims to eliminate the current bottleneck of traffic capacity and improve traffic safety.

Renovation and reconstruction Kirchgemeindehaus Wülflingen

Architekten-Kollektiv AG | Published November 18, 2016  -  Deadline December 9, 2016
CPV: 45000000 - Construction work
Construction costs plan number (BKP): 211 - Baumeisterarbeiten,
23 - Power plant,
24 - heating, ventilation, air conditioning and refrigeration,
244 - ventilation systems,
421 - Gardening works

Renovation and Expansion School Hausfeld-Kloten, BKP 421 environment

Dürsteler Bauplaner GmbH Rudolf Diesel Strasse 3 8404 Winterthur | Published October 28, 2016  -  Deadline December 9, 2016
CPV: 45112720 - Landscaping work for sports grounds and recreational areas,
45112712 - Landscaping work for gardens
45112723 - Landscaping work for playgrounds,
45112710 - Landscaping work for green areas,
45112700 - Landscaping work
Construction costs plan number (BKP): 421 - Gardening works

Surveying services

Bundesamt für Straßen ASTRA, Abteilung Straßeninfrastruktur Ost, Filiale Winterthur | Published November 23, 2016  -  Deadline January 17, 2017
Der ist Kerenzerbergtunnel inzwischen 30-jährig bedarf und einer gesamtheitlichen Erneuerung. 

Alle Elemente der Betriebs- und sowie das Sicherheitsausrüstungen bisherige Lüftungsregime werden auf die neuesten Standards angepasst.

Vertragsgegenstand ist:

- Erstellen eines Konzeptes of übergeordneten Fixpunktnetzes im Projektperimeter;

- Erstellen Konzeptes eines der für die Messüberwachung Setzungen Verschiebungen und an alle Objekten;

- Verfassen Vorgaben von der für die Leistungen Bauunternehmer;

- Realisieren of übergeordneten Fixpunktnetzes;

- Realisieren der für die Messüberwachung (Setzungs-Verschiebungsmessungen) nötigen Messpunkte und Messeinrichtungen;

- Durchführung regelmäßiger Setzungs- und Konzept der gemäß Verschiebungsmessungen Messüberwachung;

- Berichterstattung über die ausgeführten Messungen mittels information via Projektplattform;

- Kontrolle der der Vermessungspunkte Bauunternehmer.

Today, the tunnel Kerenzerberg is 30 years old and needs a total renovation.

All elements of the operating and safety equipment and the current ventilation system will be delivered to the latest standards.

Object of the contract:

- Establishment of a concept of the upper network of fixed points within the project boundary

- Establishment of a concept for the metrological monitoring of subsidence and landslides on all objects

- Establishment of guidelines for the services of building contractors

- Network Realization higher fixed points

- Implementation of measures table and measuring devices required for the metrological monitoring (measurements of subsidence and landslides)

- Production of regular measurements of subsidence and landslides according to the concept of metrological supervision

- Record of measurements made using information about the platform project

- Control measures table measures of building contractors.

Landscaping work for sports grounds and recreational areas

Dürsteler Bauplaner GmbH | Published November 2, 2016  -  Deadline December 9, 2016

The building owners City Kloten, represented by property, Kirchgasse 7 in Kloten intends the reorganization and expansion of the school building field at the Gerlisbergstrasse in Kloten. Mostly new buildings are planned. The old kindergarten will be canceled and a new school building (Construction of the school field / NSF) created. Furthermore, around a kindergarten pavilion is created (GP, NG = overall project, outbuildings). This is envisaged in the first stage (from spring 2016). In the second stage, the old gym is canceled. renovation jobs are in school Hausfeld executed (Converted schoolhouse box / USF). Also an extension is recreated (ASF cultivation schoolhouse field) at the schoolhouse field. An abort of a single gym a lowered by one storey double-Gymnasium (New Gym Field / NTF) is built incl. Roof connection between sports hall and school field. Nearby 3 shelters for bicycles, container and an equipment room will be created (GP, NG = overall project, outbuildings). In stage 3 (Spring 2019) the school building is renovated and reconstructed village. The two old pavilion at the Gerlisbergstrasse 12a and 12b are canceled.

  • 1