Call +44 800 9755 164

Public tenders for construction in Winterthur Switzerland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

080 092 F4 Anchor measurements on engineering structures 2017-2021

Bundesamt für Strassen ASTRA, Abteilung Strasseninfrastruktur Ost, Filiale Winterthur | Published January 13, 2017  -  Deadline March 6, 2017
cpvs
71300000

CPV: 71300000 - Engineering services

080 414, N03 / 76, UPlaNS Murg Walenstadt Vorlos signal portals

Bundesamt für Strassen ASTRA, Abteilung Strasseninfrastruktur Ost, Filiale Winterthur | Published February 1, 2017  -  Deadline March 20, 2017
cpvs
45233110

CPV: 45233110 - Construction work for highways

Station Square North, Stadthausstrasse to Wülflingerstrasse; Road, Canal and plant management assignment

Stadt Winterthur Departement Bau Tiefbauamt | Published February 17, 2017  -  Deadline March 22, 2017
cpvs
45231000

CPV: 45231000 - Construction work for pipelines, communication and power lines,
45232400 - Sewer construction work,
45233120 - Road construction equipment,
45231300 - Construction work for water and sewage pipelines

080 092 F4 measures anchors on structures 2017-2021

Office fédéral des routes OFROU, Division Infrastructure routière, Filiale de Winterthour | Published January 13, 2017  -  Deadline March 6, 2017
cpvs
71300000

CPV: 71300000 - Engineering services

Seenerstrasse (Grüzefeldstrasse - Rudolf-Diesel-Strasse)

Stadt Winterthur, Department Sicherheit und Umwelt Stadtwerk Winterthur, Technik Gas und Wasser | Published February 3, 2017  -  Deadline March 3, 2017
cpvs
45231000

CPV: 45231000 - Construction work for pipelines, communication and power lines

100048, N01 / 38 expansion Nordumfahrung Zurich, ANU Lot 4 / Surveyors as a specialist for geodetic monitoring measurements on various structures

Bundesamt für Strassen ASTRA, Abteilung Strasseninfrastruktur Ost, Filiale Winterthur | Published February 2, 2017  -  Deadline March 14, 2017
cpvs
71355000

CPV: 71355000 - surveying

Engineering services

Bundesamt für Straßen Astra, Abteilung Straßeninfrastruktur Ost, Filiale Winterthur | Published February 7, 2017  -  Deadline March 14, 2017
cpvs
71300000

Fiden und Neudorf. 

Neudorf Fiden und soll in der beiden Richtungen Pannenstreifen permanent zu einem dritten Fahrstreifen umgenutzt werden (Teilprojekt 2).

Integrierender Bestandteil of Projekts ist die Spange L1 (Teilprojekt 3), welche den Anschluss der A1 (neuer Half-Anschluss SG West) mit dem Städtischen (Anschluss Güterbahnhof) und dem kantonalen ...

Fiden und Neudorf.

Zwischen den Anschlüssen St.Fiden Neudorf und soll in der beiden Richtungen Pannenstreifen permanent zu einem dritten Fahrstreifen umgenutzt werden (Teilprojekt 2).

Integrierender Bestandteil of Projekts ist die Spange L1 (Teilprojekt 3), welche den Anschluss der A1 (neuer Half-Anschluss SG West) mit dem Städtischen (Anschluss Güterbahnhof) und dem kantonalen ...

Fiden and Neudorf.

Fiden and Neudorf, the emergency lane to be converted into permanent third lane (subproject 2).

The L1 bar (subproject 3) which connects the A1 (new junction SG West) in urban road network (Güterbahnhof junction) and cantonal (Liebegg junction) is part ...

Surveying services

Bundesamt für Straßen ASTRA, Abteilung Straßeninfrastruktur Ost, Filiale Winterthur | Published February 7, 2017  -  Deadline March 14, 2017
cpvs
71355000

Gegenstand Beschaffung dieser ist die zur Ausführung dieser Messungen Feststellung allfälliger: 

230m auf dem SBB-Trassee Affoltern - Regensdorf,

150m,

Hebungen an den Fundamenten von 12 und einem Starkstrommasten Sendemast der Swisscom

- Geodätischer Lageveränderungen year Brücken und einer neuen 8 temporären

Straßenhilfsbrücke.

Teilweise müssen noch nicht an den Bauwerken vorhandene Mess- bzw.

Beobachtungspunkte hergestellt werden; werden die Messungen in unterschiedlichen

Intervallen (täglich bis vierteljährlich) und über unterschiedliche Zeiträume (zwischen 2 und 4 Jahren) durchgeführt.

Die zu der erforderliche Gesamtzahl erbringenden ...

Gegenstand Beschaffung dieser ist die zur Ausführung dieser Messungen Feststellung allfälliger

230m auf dem SBB-Trassee Affoltern - Regensdorf,

150m,

Hebungen an den Fundamenten von 12 und einem Starkstrommasten Sendemast der Swisscom

- Geodätischer Lageveränderungen year Brücken und einer neuen 8 temporären

Straßenhilfsbrücke.

Teilweise müssen noch nicht an den Bauwerken vorhandene Mess- bzw.

Beobachtungspunkte hergestellt werden; werden die Messungen in unterschiedlichen

Intervallen (täglich bis vierteljährlich) und über unterschiedliche Zeiträume (zwischen zwei und vier Jahren) durchgeführt.

Die zu der erforderliche Gesamtzahl erbringenden ...

This contract covers the implementation of these measures to possibly detect the following:

- Settlements and twists of 2 rails SBB over a length of about 230 m on the plot SBB Affoltern - Regensdorf

- Horizontal deformations and settlements of Affoltern retaining walls over a length of about 150 m

- Settlements or uprisings foundations of 12 pylons and pole transmitter Swisscom

- Geodetic changes in the situation of 8 new bridges and a temporary auxiliary road bridge.

measuring points and observation that does not yet exist must partly be made on the works; the measurements are performed at different intervals (daily, quarterly) and for different periods (between ...

This contract covers the implementation of these measures to possibly detect the following:

- Settlements and twists of the two rails of SBB on a length of about 230 m on the plot SBB Affoltern - Regensdorf

- Horizontal deformations and settlements of Affoltern retaining walls over a length of about 150 m

- Settlements or uprisings foundations of 12 pylons and pole transmitter Swisscom

- Geodetic changes in the situation of 8 new bridges and a temporary auxiliary road bridge.

measuring points and observation that does not yet exist must partly be made on the works; the measurements are performed at different intervals (daily, quarterly) and for different periods (between ...

Engineering services

Bundesamt für Straßen ASTRA, Abteilung Straßeninfrastruktur Ost, Filiale Winterthur | Published January 11, 2017  -  Deadline February 28, 2017
cpvs
71300000

Seit der Eröffnung wurden Teile der Stützkonstruktionen erweitert sowie die Lehnenbrücke (Brücke Monstein) und die über den Zwillingsbrücke Binnenkanal im Jahr 1998 instand gesetzt, respektive statisch verstärkt. 

Margrethen "(UH-Km 186 000 188 246 bis UHKm) erarbeiten lassen und dieses vom 03.09.2016 bis zum 04.25.2016 öffentlich aufgelegt.

Im Rahmen of Plangenehmigungsverfahrens ist eine neue Variation der Befestigung der geplanten Lärmschutzwände an den bestehenden Leitmauern / Stützmauern inklusive der sich der daraus ergebenden Anpassungen Leitmauern zu prüfen (insbesondere Statik) und zu im Detail dokumentieren (Statik auf Stufe DP).

Margrethen zu bearbeiten (Detailprojekt, Unternehmersubmission, Unterlagen für die Ausführung, Bau, Inbetriebnahme / Abschluss).

Seit der Eröffnung wurden Teile der Stützkonstruktionen erweitert sowie die Lehnenbrücke (Brücke Monstein) und die über den Zwillingsbrücke Binnenkanal im Jahr 1998 instand gesetzt, respektive statisch verstärkt.

Margrethen "(UH-Km 186.000 bis UHKm 188,246) erarbeiten lassen und dieses vom 03.09.2016 bis zum 04.25.2016 öffentlich aufgelegt.

Im Rahmen of Plangenehmigungsverfahrens ist eine neue Variation der Befestigung der geplanten Lärmschutzwände an den bestehenden Leitmauern / Stützmauern inklusive der sich der daraus ergebenden Anpassungen Leitmauern zu prüfen (insbesondere Statik) und zu im Detail dokumentieren (Statik auf Stufe DP).

Margrethen zu bearbeiten (Detailprojekt, Unternehmersubmission, Unterlagen für die Ausführung, Bau, Inbetriebnahme / Abschluss).

The hillside deck (deck Monstein) and Bridge combined on the inner channel were repaired and reinforced on the static map in 1998.

Margrethen "(186 000 km maintenance at 188,246 km maintenance) with an upgrade to the investigation of 09/03/2016 to 04/25/2016.

As part of the plan approval procedure, a new variant of fixing of noise barriers planned to parapets / existing retaining walls must be examined with the changes resulting parapets (including statically) with detailed documentation ( static at the retail level).

Margrethen must be developed (detailed project submission companies, execution documents, work, commissioning / completion).

The hillside deck (deck Monstein) and Bridge combined on the inner channel were repaired and reinforced on the static map in 1998.

Margrethen "(km 186.000 to km maintenance maintenance 188 246) with an upgrade to the investigation of 03/09/2016 to 04/25/2016.

As part of the plan approval procedure, a new variant of fixing of noise barriers planned to parapets / existing retaining walls must be examined with the changes resulting parapets (including statically) with detailed documentation ( static at the retail level).

Margrethen must be developed (detailed project submission companies, execution documents, work, commissioning / completion).

  • 1