Public tenders for construction in Uster Switzerland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Total renewal of the maintenance workshop Uster, BKP 211.9 demolition / construction work

Stadt Uster, GF Liegenschaften | Published March 31, 2017  -  Deadline May 10, 2017
cpvs
45000000

CPV: 45000000 - Construction work
Construction costs plan number (BKP): 211 - construction work
Standard positions catalog (NPK): 310 - construction work

Construction work

Stadt Uster, GF Liegenschaften | Published April 5, 2017  -  Deadline May 10, 2017
cpvs
45000000

The city of Uster and the energy Uster AG have an approximately 15,000-square-foot complex at the corner of dam / Oberlandstraße. This is centrally located, 500 meters from the station Uster. Since the properties are both architectural, operational and house connected to one another, both landowners have decided to coordinate the planning and execution of the required building renovation together.

affected by the renovation of 6 buildings, 3 urban sub-projects (S1-S3) and 3 of the energy Uster AG (E2-E4).

The general condition of the properties (S1, S2, E2 and E3) from the year 1971/73 is in need of remediation. The whole building is not insulated and damaged. The 45-year-old building services is outdated and must be replaced. Inside, the earthquake and fire safety standards, the escape route distances, the hygiene regulations and safety precautions no longer meet the legal requirements. The stock of (S2 and E3) should be about to ...

Construction work

Energie Uster AG | Published April 20, 2016  -  Deadline May 25, 2016
cpvs
45000000

The in the tooths traffic areas of the opening up platform (blanket over EC) to be replaced in full. The damaged areas are removed by HDW-process, re-profiled and provided with a new protective layer. The existing parapets to be renewed, which soffits also protected in full.

The work is done in 2-3 major and several sub-stages under operation.

Quantities:

- Cancel coverings, d = 40 mm, 4850 m 2

- HDW-cut and reprofiled with concrete

(Ceiling top), 4 700 m2 of

Soffit, 3 700m 2

- Demolition Nordrampe according to plan, enclosed space, 850 m 3

- Wear layer of mastic and sprinkle

d = 35 mm, 4400 m 2

- Protective layer of mastic, d = 40 mm, 4400 m 2

- Structural layer rolled asphalt AC T, d = 65 mm, 140 t

renew reinforced concrete to close or -

Expansion joints, 55 m 3

- Insulation of ceiling soffits, 2 500 meters 2

- Exchange gutter, 450 lm

- Reinforced concrete new ceiling part, close by Oblichtern, beams, 33 m 3

- New parapets in situ concrete including component protection, 250 lm.

- New edge insulation, as Pavement, with component protection, 450 m . 2

Construction work

Energie Uster AG | Published August 3, 2016
Winner
Specogna Bau AG
cpvs
45000000

"Restoration opening up platform E1" energy Uster AG.

Building construction work

Keller Partner Bauberater AG | Published November 11, 2015  -  Deadline December 18, 2015
cpvs
45210000

Renovation and expansion Hallenbad Buchholz Uster. The project includes the rehabilitation of the existing indoor pool facility and the expansion of the system with a 50-meter pool. The project is realized according to the MINERGIE standard.

Building construction work

Keller Partner Bauberater AG | Published November 11, 2015
Winner
Hammer Metall AG
cpvs
45210000

BKP 272.1 Innere Verglasung – Sanierung und Erweiterung Hallenbad Buchholz Uster.

Building construction work

Keller Partner Bauberater AG | Published November 11, 2015
Winner
Schreinerei Roland Suter GmbH
cpvs
45210000

BKP 273.1 Innentüren – Sanierung und Erweiterung Hallenbad Buchholz Uster.

Building construction work

Keller Partner Bauberater AG | Published December 9, 2015  -  Deadline January 22, 2016
cpvs
45210000

Renovation and expansion Hallenbad Buchholz Uster. The project includes the rehabilitation of the existing indoor pool facility and the expansion of the system with a 50-meter pool. The project is realized according to the MINERGIE standard.

Building construction work

Keller Partner Bauberater AG | Published December 9, 2015  -  Deadline January 22, 2016
cpvs
45210000

Renovation and expansion Hallenbad Buchholz Uster. The project includes the rehabilitation of the existing indoor pool facility and the expansion of the system with a 50-meter pool. The project is realized according to the MINERGIE standard.

Building construction work

Keller Partner Bauberater AG | Published December 9, 2015  -  Deadline January 22, 2016
cpvs
45210000

Renovation and expansion Hallenbad Buchholz Uster. The project includes the rehabilitation of the existing indoor pool facility and the expansion of the system with a 50-meter pool. The project is realized according to the MINERGIE standard.

Building construction work

Keller Partner Bauberater AG | Published September 2, 2015
Winner
Steinit AG
cpvs
45210000

BKP 281.0 Unterlagsboden – Sanierung und Erweiterung Hallenbad Buchholz Uster.

Building construction work

Keller Partner Bauberater AG | Published September 2, 2015
Winner
isolag AG für integrierte Deckensysteme
cpvs
45210000

BKP 283.1 Deckenbekleidungen aus Metall – Sanierung und Erweiterung Hallenbad Buchholz Uster.

Building construction work

Keller Partner Bauberater AG | Published July 22, 2015  -  Deadline September 11, 2015
cpvs
45210000

Rehabilitation and extension indoor pool Buchholz Uster. The project includes the rehabilitation of the existing indoor pool facility and the expansion of the system with a 50-meter pool. The project is realized according to the MINERGIE standard.

Building construction work

Keller Partner Bauberater AG | Published July 22, 2015  -  Deadline September 11, 2015
cpvs
45210000

Rehabilitation and extension indoor pool Buchholz Uster. The project includes the rehabilitation of the existing indoor pool facility and the expansion of the system with a 50-meter pool. The project is realized according to the MINERGIE standard.

Construction work for swimming pool

Keller Partner Bauberater AG | Published February 25, 2015
Winner
Robert Spleiss AG
cpvs
45212212

Sanierung und Erweiterung Hallenbad Buchholz Uster.

Building construction work

Keller Partner Bauberater AG | Published February 25, 2015
Winner
Frutiger AG Zürich
cpvs
45210000

BKP 211.9 Baumeisterarbeiten – Sanierung und Erweiterung Hallenbad Buchholz Uster.

Building construction work

Keller Partner Bauberater AG | Published May 13, 2015  -  Deadline June 19, 2015
cpvs
45210000

Rehabilitation and extension indoor pool Buchholz Uster. The project includes the rehabilitation of the existing indoor pool facility and the expansion of the system with a 50-meter pool. The project is realized according to the MINERGIE standard.

Building construction work

Keller Partner Bauberater AG | Published May 13, 2015  -  Deadline June 19, 2015
cpvs
45210000

Rehabilitation and extension indoor pool Buchholz Uster. The project includes the rehabilitation of the existing indoor pool facility and the expansion of the system with a 50-meter pool. The project is realized according to the MINERGIE standard.

Restoration Unterbühlen- / Drusbergstrasse

Stadt Uster, Abt. Bau | Published November 25, 2016  -  Deadline December 22, 2016
cpvs
45233120

CPV: 45233120 - Road construction equipment,
45231300 - Construction work for water and sewage pipelines

Renovation Hasenbühlstrasse

Stadt Uster Abteilung Bau | Published April 21, 2017  -  Deadline May 16, 2017
cpvs
45233120

CPV: 45233120 - Road construction works,
45231100 - Construction work for pipelines