Call +44 800 9755 164

Public tenders for construction in Thun Switzerland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Roundabout construction work

Office fédéral des routes OFROU, Division infrastructure routière Ouest, filiale Thun | Published January 18, 2017  -  Deadline March 3, 2017

The current crossroads of South junction of the N09 Martigny - Fully is a traditional crossroads with 4 branches. The significant development of the nearby industrial area and the growing number of constructions have reduced the capacity at the crossroads south of traffic junction No. 21 (safety distances and low insertion).

These problems led jointly FEDRO, the service roads of the State of Valais, and the technical services of the Municipality of Martigny to request traffic studies and development of the road along the entire length of the road Martigny - Fully.

The project presented in this tender is the road project to adapt the South junction with a roundabout to bypass the access road towards Sion.

Main quantities:

Roundabout outside diameter 39 m.

Clearing 200 m².

Demolition existing islets 2 p.

Excavation 1470 m³.

Supply and installation of 500 m³ fill material.

Supply and installation grave site untreated 0/45 800 m³.

Power supply DN 120/132 110 m.

electrical room DN 600 1 pc.

Supply and installation of 15/19/45 540 m borders.

Removal of asphalt layers 3000 m².

Supply and installation asphalt to 1170.

surface water pipe 105 m.

dumps 5 per bag.

Signs and markings.

Bases 11 percent.

police signals 9 p.

Direction indicators 6 p.

Large panels 3 p.

line marking 15 cm structured 900m.

Fences.

Removing existing fence 250 m.

Supply and installation of a new fence 180 m.

Slides.

Removing existing slide 70 m.

Supply and installation of a new slide 70 m.

Environmental monitoring for construction

Office fédéral des routes OFROU, Division infrastructure routière Ouest, filiale Thoune | Published January 18, 2017  -  Deadline March 6, 2017

In the case of this contract, FEDRO is by subsidiary Thun, technically and administratively manages the network of motorways of the Canton of Valais.

This contract is made in the context of the EP Martigny and around. The purpose of the mandate is part of the implementation phase for the Environmental Monitoring achievement (SER). The mandate covers the highway N9 and N21 to a length of 22,975 kilometers, more access roads to the motorway in the scope of national roads. The realization phase is divided into 4 lots.

This proxy service contract concerns the environmental monitoring of implementation.

Construction work

Bundesamt für Straßen ASTRA, Abteilung Straßeninfrastruktur West, Filiale Thun | Published December 17, 2016  -  Deadline February 10, 2017

In store Ganggi in the municipality Gondo Zwischbergen the national road N9 is endangered by falling rocks and blocks. To protect a 150 m long dam along the national road is created. The dam height and width varies, the maximum height is 10 meters and the dam crest is constant 3 m wide. Next is to create one drainage system, an access track and a passable Fallboden.

To increase the safety at work site temporary rockfall protection nets were created in 2016th The rockfall protection nets are checked again before starting of this mandate. These works are not part of this tender. During construction, the security arrangements of the building owner is subject.

Construction work

Bundesamt für Straßen ASTRA, Abteilung Strasseninfrastruktur West, Filiale Thun | Published January 7, 2017  -  Deadline February 17, 2017
Highway Simplonstraße A09, Canton Road T9, bypass Brig, customs conditioning Gamsen). 

The reorganization measures include widening the roundabout carriageway (with transformation of the inner edge of the centrally located technical pelvis), the replacement and reinforcement of the top layer of the circuit same Lages, the transformation of the branch A09 Simplon (geometry, vehicle restraint systems), the replacement of vehicle restraint systems to protect groundwater.

Main quantities:

- Earthworks - Excavating 2 900 m 3 ;

- Earthworks - Material Contents: 1 100 meters 3 ;

- Foundation layers for traffic installations 1 300 meters 3 ;

- Covering, demolition / Milling: 300 m3;

- Lining reinforcement 5 300 m2;

- Flooring installation 1 200 tonnes;

- FZRS - guardrail: 450 m;

- FZRS - concrete release elements: 350 m.

Highway Simplonstraße A09, Canton Road T9, bypass Brig, customs conditioning Gamsen).

The reorganization measures include widening the roundabout carriageway (with transformation of the inner edge of the centrally located technical pelvis), the replacement and reinforcement of the top layer of the circuit same Lages, the transformation of the branch A09 Simplon (geometry, vehicle restraint systems), the replacement of vehicle restraint systems to protect groundwater.

Main quantities:

- Earthworks - Excavating 2 900 m 3 ;

- Earthworks - Material Contents: 1 100 meters 3 ;

- Foundation layers for traffic installations 1 300 meters 3 ;

- Covering, demolition / Milling: 300 m 3 ;

- Lining reinforcement: 5300 m 2 ;

- Flooring installation 1 200 tonnes;

- FZRS - guardrail: 450 m;

- FZRS - concrete release elements: 350 m.

Building construction work

Spital STS AG | Published January 7, 2017  -  Deadline February 10, 2017

See Submission documents.

Architectural, construction, engineering and inspection services

Bundesamt für Straßen ASTRA, Abteilung Straßeninfrastruktur West, Filiale Thun | Published January 13, 2017  -  Deadline March 10, 2017

The national roads in the Bern area will in future be regularly overloaded. To remedy these traffic-related problems, the department road networks has developed the project study N06 Bern East, in-depth study with the involvement of cantonal, regional and local authorities. The study takes its Bestvariante B6 to the conclusion that for the bottleneck in the section of the overpass Bern Expo part expansion to the Zentrum Paul Klee and a diversion of the existing N06 at Ostring represents the zielführendste solution to the connection Muri. The project is classified key projects in the ASTRA project category. The overall project is divided into five sub-projects.

The competition's mandate includes the services of the project author Lot 3 operating and safety equipment (BSA) for the General Project and the execution project. The Los 3 operating and safety equipment includes the sub-project. 4

N09.58-001 Martigny 080 331 EP & Surroundings, Environmental Monitoring of the SER Realization

Office fédéral des routes OFROU, Division Infrastructure routière Ouest, Filiale Thoune | Published January 13, 2017  -  Deadline March 6, 2017
CPV: 71313450 - Environmental monitoring for construction

EP 080 331 N09.58 Martigny - Rotary Martigny - Fully

Office fédéral des routes OFROU, Division Infrastructure routière Ouest, Filiale Thun | Published January 13, 2017  -  Deadline March 3, 2017
CPV: 45233128 - junction construction work roundabouts

N06.32-006 PEB Wankdorf - Muri Bypass East, service contract / project authors Los 3 operating and safety equipment for the project phases General project and execution project

Office fédéral des routes OFROU, Division Infrastructure routière Ouest, Filiale Thoune | Published January 11, 2017  -  Deadline March 10, 2017
CPV: 71000000 - Services d'architecture, services de construction, services d'ingénierie et services d'inspection

N09.72-014 100118 Gondo - Rockfall protection dam San Marco - Ganggi, dam Ganggi

Bundesamt für Strassen ASTRA, Abteilung Strasseninfrastruktur West, Filiale Thun | Published December 15, 2016  -  Deadline February 10, 2017
CPV: 45000000 - Construction work

Repair Chienberg Tunnel, Unterseen

Oberingenieurkreis I | Published January 6, 2017  -  Deadline February 24, 2017
CPV: 45000000 - Construction work

N09.70-017 090 116 - Brig-Glis, centrifugal Bildacker - VOMA covering work Baumeister works for the widening of the gyro

Bundesamt für Strassen ASTRA, Abteilung Strasseninfrastruktur West, Filiale Thun | Published January 6, 2017  -  Deadline February 17, 2017
CPV: 45000000 - Construction work

New service building Schoren Thun

brügger architekten ag | Published December 22, 2016  -  Deadline February 1, 2017
CPV: 45000000 - Construction work
Construction costs plan number (BKP): 273 - carpentry

Baumeisterarbeiten 2. UG - EC (earthquake measures)

Spital STS AG | Published January 6, 2017  -  Deadline February 10, 2017
CPV: 45210000 - Building construction work
Construction costs plan number (BKP): 211 - Baumeisterarbeiten
Standard items catalog (NPK): 310 - Baumeisterarbeiten

Electrical Installations earthquake measures 2.UG - EC

Spital STS AG | Published December 17, 2016  -  Deadline January 27, 2017
CPV: 45311200 - Electrical installation work
Construction costs plan number (BKP): 23 - Power plant

Architectural services, increase V tract

Spital STS AG | Published November 3, 2016  -  Deadline February 6, 2017
CPV: 71200000 - Architectural services
Construction costs plan number (BKP): 1 - preparatory work,
2 - Building
  • 1