Public tenders for construction in Thun Switzerland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work for highways, roads

Office fédéral des routes OFROU, division infrastructure routière Ouest, filiale Thoune | Published March 7, 2017  -  Deadline April 28, 2017
cpvs
45233100

Area T / U

These works consist of the full consolidation of the N09 motorway sections between km 72 000 and 92 265, and N21 to a length of 2.4 km from junction of the Great St. Bernard to the gate of the Tunnel of Mont-Chemin.

The main work to be done are:

10 Overall Project

The platform of shipyard facilities in preparatory work.

12 Environment

- Some small improvements.

- From clearing.

- Treatment of neophytes

13 Traffic Management

- Traffic management for the realization of this Lot 111 and the other lots in parallel (supply and laying temporary marking, mobile device security provisional and temporary traffic guidance for the implementation of the different phases).

- During work, the police response scenarios, fire, health, etc. are inventoried.

20 Road Construction

20a Emergency Stop Strips

Remediation of BAU (full planing of existing coating and ...

Construction work for highways, roads

Office fédéral des routes OFROU, Division infrastructure routière Ouest, Filiale Thun | Published February 22, 2017  -  Deadline March 31, 2017
cpvs
45233100

Area T / U

These works consist of the full consolidation of the N09 motorway sections between km 72 000 and 92 265, and N21 to a length of 2.4 km from junction of the Great St. Bernard to the gate of the Tunnel of Mont-Chemin.

The main work to be done are:

10 Overall Project:

The platform of shipyard facilities in preparatory work.

12 Environment:

- Some small improvements.

- From clearing.

- Treatment of neophytes

13 Traffic management:

- Traffic management for the realization of this Lot 111 and the other lots in parallel (supply and laying temporary marking, mobile device security provisional and temporary traffic guidance for the implementation of the different phases).

- During work, police response scenarios, fire, health, etc. are inventoried.

20 Road Construction.

20a Emergency Stop Tapes:

Remediation of BAU (full planing of existing coating and ...

Area T / U

These works consist of the full consolidation of the N09 motorway sections between km 72 000 and 92 265, and N21 to a length of 2.4 km from junction of the Great St. Bernard to the gate of the Tunnel of Mont-Chemin.

The main work to be done are:

10 Overall Project:

The platform of shipyard facilities in preparatory work.

12 Environment:

- Some small improvements.

- From clearing.

- Treatment of neophytes

13 Traffic management:

- Traffic management for the realization of this Lot 111 and the other lots in parallel (supply and laying temporary marking, mobile device security provisional and temporary traffic guidance for the implementation of the different phases).

- During work, the police response scenarios, fire, health, etc., are invento ...

N08.60 130086 Unterbach Aarebrücken Balmhof, construction work

Office fédéral des routes OFROU, Division Infrastructure routière Ouest, Filiale Thoune | Published May 24, 2017  -  Deadline July 7, 2017
cpvs
45000000

CPV: 45000000 - Travaux de construction

N01.16 080301 - UeMa Kerzers - Forsthaus Kaltmicrobelag - Construction works (ID 1987)

Office fédéral des routes OFROU, Division Infrastructure routière Ouest, Filiale Thoune | Published October 4, 2017  -  Deadline November 16, 2017
cpvs
45000000

CPV: 45000000 - Travaux de construction

Environmental monitoring for construction

Office fédéral des routes OFROU, Division infrastructure routière Ouest, filiale Thoune | Published January 18, 2017  -  Deadline March 6, 2017
cpvs
71313450

In the case of this contract, FEDRO is by subsidiary Thun, technically and administratively manages the network of motorways of the Canton of Valais.

This contract is made in the context of the EP Martigny and around. The purpose of the mandate is part of the implementation phase for the Environmental Monitoring achievement (SER). The mandate covers the highway N9 and N21 to a length of 22,975 kilometers, more access roads to the motorway in the scope of national roads. The realization phase is divided into 4 lots.

This proxy service contract concerns the environmental monitoring of implementation.

Environmental monitoring for construction

Office fédéral des routes OFROU, Division infrastructure routière Ouest, Filiale Thoune | Published April 15, 2017
Winner
Biol-Conseils SA
cpvs
71313450

EP 080 331 N09.58-001 Martigny and surroundings, environmental monitoring achievement SER.

Roundabout construction work

Office fédéral des routes OFROU, Division infrastructure routière Ouest, filiale Thun | Published January 18, 2017  -  Deadline March 3, 2017
cpvs
45233128

The current crossroads of South junction of the N09 Martigny - Fully is a traditional crossroads with 4 branches. The significant development of the nearby industrial area and the growing number of constructions have reduced the capacity at the crossroads south of traffic junction No. 21 (safety distances and low insertion).

These problems led jointly FEDRO, the service roads of the State of Valais, and the technical services of the Municipality of Martigny to request traffic studies and development of the road along the entire length of the road Martigny - Fully.

The project presented in this tender is the road project to adapt the South junction with a roundabout to bypass the access road towards Sion.

Main quantities:

Roundabout outside diameter 39 m.

Clearing 200 m².

Demolition existing islets 2 p.

Excavation 1470 m³.

Supply and installation of 500 m³ fill material.

Supply and installation grave site untreated 0/45 800 m³.

Power supply DN 120/132 110 m.

electrical room DN 600 1 pc.

Supply and installation of 15/19/45 540 m borders.

Removal of asphalt layers 3000 m².

Supply and installation asphalt to 1170.

surface water pipe 105 m.

dumps 5 per bag.

Signs and markings.

Bases 11 percent.

police signals 9 p.

Direction indicators 6 p.

Large panels 3 p.

line marking 15 cm structured 900m.

Fences.

Removing existing fence 250 m.

Supply and installation of a new fence 180 m.

Slides.

Removing existing slide 70 m.

Supply and installation of a new slide 70 m.

Roundabout construction work

Office fédéral des routes OFROU, Division Infrastructure routière Ouest, Filiale Thun | Published April 22, 2017
Winner
Implenia Schweiz AG
cpvs
45233128

N09.58 080331 EP Martigny - Roundabout Martigny - Fully.

N09.58 080331 EP Martigny - Roundabout Martigny - Fully.

Construction project management services

Bundesamt für Strassen ASTRA, Abteilung Strasseninfrastruktur West, Filiale Thun | Published September 23, 2017  -  Deadline October 30, 2017
cpvs
71541000

Die Leistungen des Auftrags beinhalten: allgemeine Unterstützung des Bauherrn im genannten Projekt sowie Unterstützung bei der Erarbeitung der Projektgrundlagen, im Beschaffungswesen, beim Controlling, beim projektgestützten Qualitätsmanagement und bei der fachlichen Begleitung des Projekts.

Für den detaillierten Leistungsbeschrieb siehe Angebotsunterlagen.

Die Leistungen des Auftrags beinhalten: allgemeine Unterstützung des Bauherrn im genannten Projekt sowie Unterstützung bei der Erarbeitung der Projektgrundlagen, im Beschaffungswesen, beim Controlling, beim projektgestützten Qualitätsmanagement und bei der fachlichen Begleitung des Projekts.

Für den detaillierten Leistungsbeschrieb siehe Angebotsunterlagen.

The services of the mandate are as follows: general support to the project owner in the context of the project mentioned and assistance in the preparation of project bases, for procurement, control activities, quality management project and the specialized support of the project.

Refer to the tender documents for the detailed description of benefits.

The services of the mandate are as follows: general support to the project owner in the context of the project mentioned and assistance in the preparation of project bases, for procurement, control activities, quality management project and the specialized support of the project.

Refer to the tender documents for the detailed description of benefits.

Construction project management services

Bundesamt für Straßen ASTRA, Abteilung Straßeninfrastruktur West, Filiale Thun | Published November 8, 2017  -  Deadline December 18, 2017
cpvs
71541000

Leistungen of the Gesamtplaners für die Sanierung of the Werkhof Indivis in Martigny.

- Sanierung der Büroräume,

- Sanierung der thermischen Gebäudehülle,

- Sanierung der Autowerkstatte, Garagen und Lagerbereiche,

- Sanierung der ungedeckten Zonen,

- Erstellung einer Zwischendeponie für die Abfälle,

- Zusätzlicher Ausbau von Garagen für die Polizei.

Vertragsgegenstand dieses Auftrags sind der Gesamtplaner, die Dienstleistungen von Architekt, Bau-, HLS- und Elektroingenieur von der Projektierung bis zur Inbetriebnahme (SIA-Phasen 32-53).

Leistungen of the Gesamtplaners für die Sanierung of the Werkhof Indivis in Martigny.

- Sanierung der Büroräume,

- Sanierung der thermischen Gebäudehülle,

- Sanierung der Autowerkstatte, Garagen und Lagerbereiche,

- Sanierung der ungedeckten Zonen,

- Erstellung einer Zwischendeponie für die Abfälle,

- Zusätzlicher Ausbau von Garagen für die Polizei.

Vertragsgegenstand dieses Auftrags sind der Gesamtplaner, die Dienstleistungen von Architekt, Bau-, HLS- und Elektroingenieur von der Projektierung bis zur Inbetriebnahme (SIA-Phasen 32-53).

Services of general representative for the cleaning up of the Indivis maintenance center in Martigny:

- sanitation of officesm

- sanitation of the thermal envelope of the building

- sanitation of workshops with vehicles, garages with vehicles and depositsm

- sanitation of uncovered places

- establishment of an intermediate warehouse for cleaning waste

- establishment of additional garages for the police.

The general agent, the services of architect, civil engineer, CVS engineer, and electrical engineer for all phases of project ranging from the intervention project to the commissioning (phase SIA 32- 53) are the subject of this contract.

Services of general agent for the cleaning up of the maintenance center of the Indivis in Martigny: ...

Architectural, construction, engineering and inspection services

Bundesamt für Straßen ASTRA, Abteilung Straßeninfrastruktur West, Filiale Thun | Published September 27, 2017  -  Deadline November 2, 2017
cpvs
71000000

Für allgemeine Angaben siehe Dokument "0_Pflichtenheft, Kapitel 1".

Bei den Messfahrten werden folgende Daten erhoben: Oberflächenschäden (visuell), Längsebenheit, Querebenheit, Griffigkeit, Oberflächenschäden Risse und Ausbrüche (Deutsche Methode), sowie Geometrie und Nutzung.

Die Daten werden anschließend über die Interlis-Schnittstelle in die Fachapplikation TRA importiert.

Für allgemeine Angaben siehe Dokument "0_Pflichtenheft, Kapitel 1".

Bei den Messfahrten werden folgende Daten erhoben: Oberflächenschäden (visuell), Längsebenheit, Querebenheit, Griffigkeit, Oberflächenschäden Risse und Ausbrüche (Deutsche Methode), sowie Geometrie und Nutzung.

Die Daten werden anschließend über die Interlis-Schnittstelle in die Fachapplikation TRA importiert.

For more information, see the document "0_Pflichtenheft, Kapitel 1".

The following quantities must be recorded during the campaign: Surface degradation, longitudinal flatness, transverse flatness, anti-slip quality, cracking and peeling surface degradation (according to German method) as well as geometry and use.

The data will be imported into the MISTRA TRA application using Interlis interfaces.

For more information, see the document "0_Pflichtenheft, Kapitel 1".

The following quantities must be recorded during the campaign: Surface degradation, longitudinal flatness, transverse flatness, non-slip quality, surface cracking and tearing (according to German method) as well as geometry and use.

The data will be imported into the MISTRA TRA application using Interlis interfaces.

Construction project management services

Bundesamt für Straßen ASTRA, Abteilung Straßeninfrastruktur West, Filiale Thun | Published May 27, 2016
Winner
ingenta AG
cpvs
71541000

Construction Management for the BHU data management project.

Construction work for highways, roads

Office fédéral des routes OFROU, division infrastructure routière Ouest, filiale Thun | Published April 19, 2016  -  Deadline June 10, 2016
cpvs
45233100

These works include the construction of a noise barrier of approximately 1500 m in length on the edge of the highway N09 to Saxon, between km 81 700 and 83 200. The surface of the structure above ground is of 5000 m2.

The work to be performed are:

1. Traffic management for the realization of this book, namely: supply and installation of temporary marking, mobile device VarioGard type of temporary safety. In the construction phase, Police intervention scenarios, fire, health, etc. are inventoried.

2. Preparatory work

- Layout of the site installations areas,

- Clearing and demolition of the existing wall,

- Dismantling of the guardrail.

3. Realization of the book

- Excavations for foundations,

- Implementation of micro piles,

- Poses a potential battery equipment BSA tubes of the N09,

- Implementation of concrete blocks on micro piles,

- Manufacture and sealing of metal poles,

- Installation of prefabricated elements and phono absorbent paint,

- Ground work and guardrail,

- Finishing work and connections to the existing,

- Dégrappage asphalt (3500 m2)

- Excavations (3500 m3)

- Micropiles (2200 m),

- Battery 6 PE 120/132 concrete (1 600 m),

- Battery 9 PE 120/132 concrete (1 600 m),

- A1 and S1 rooms for the BSA (4 pcs)

- Concrete bases, pile caps (220 m3)

- Steel construction (80 t),

- Noise prefabricated concrete elements (5 000 m2)

- Embankments (3800 m3)

- Bituminous mixtures (350 t)

- Continuous line marking (1600 m),

- Fences (1600 m).

The information has only an informative character. The company may in no case claim the claims.

Construction work

Bundesamt für Straßen ASTRA, Abteilung Straßeninfrastruktur West, Filiale Thun | Published September 23, 2017  -  Deadline October 30, 2017
cpvs
45000000

The construction project Muri reconstruction connection includes the following work.

Trassee:

- new construction of round Froumholz;

- New building exit from the T10 (lane direction Worb) to the new roundabout Froumholz;

- Adjustment of the two existing ramps Exit from N06 / Thun and driveway to T10 / Worb;

- Creation of environmental trails for buses and bicycles east of the new roundabout on Thunstrasse in driving direction Muri and in the area Thunstrasse, between exit T10 (from direction Worb) and Kreiselfeldstraße;

- Extension of the left-turn lane from direction Allmendingen to the national road N06 direction Bern.

Engineering structures:

- Repair work Object M01, UEF Ramp Bern-Worb;

- Repair work Object M02, UEF Ramp Worb-Bern;

- repair work Object T19, UEF connection Muri;

- repair work Object T20A, UNF Froumholz;

- Deck cover replacement on the object T20, UEF ramp Bern-Worb over N6.

Installation area and way:

- Dismounting the installation area after completion of the work.

The construction project Muri reconstruction connection includes the following work.

Trassee:

- new construction of round Froumholz;

- New construction Exit from the T10 (lane direction Worb) to the new roundabout Froumholz;

- Adjustment of the two existing ramps Exit from N06 / Thun and driveway to T10 / Worb;

- Creation of environmental trails for buses and bicycles east of the new roundabout on Thunstrasse in driving direction Muri and in the area Thunstrasse, between exit T10 (from direction Worb) and Kreiselfeldstraße;

- Extension of the left-turn lane from direction Allmendingen to the national road N06 direction Bern.

Engineering structures:

- Repair work Object M01, UEF Ramp Bern-Worb;

- Repair work Object M02, UEF Ramp Worb-Bern;

- repair work Object T19, UEF connection Muri;

- repair work Object T20A, UNF Froumholz;

- Covering ...

Renovation and construction Burgergut Thun

brügger architekten ag | Published October 21, 2016  -  Deadline November 21, 2016
cpvs
45000000

CPV: 45000000 - Construction work
Construction costs plan number (BKP): 2733 - General carpentry

Construction Management Project NEB

Bundesamt für Strassen ASTRA Abteilung Strasseninfrastruktur | Published February 27, 2017  -  Deadline April 28, 2017
cpvs
71541000

CPV: 71541000 - Construction project management services

Alpenruhe Saanen 21100 Construction work

Zellweger Architekten AG | Published October 21, 2017  -  Deadline December 1, 2017
cpvs
45215214

CPV: 45215214 - Construction of dormitories
Building cost plan number (BKP): 211 - Construction work

Construction project management services

Bundesamt für Straßen ASTRA, Abteilung Straßeninfrastruktur West, Filiale Thun | Published September 10, 2016
Winner
C + E Planing AG
cpvs
71541000

Construction Management for the project "N08 EP Interlaken Ost - Brienz operation and safety, construction management".

Construction work

Bundesamt für Straßen ASTRA, Abteilung Straßeninfrastruktur West, Filiale Thun | Published December 17, 2016  -  Deadline February 10, 2017
cpvs
45000000

In store Ganggi in the municipality Gondo Zwischbergen the national road N9 is endangered by falling rocks and blocks. To protect a 150 m long dam along the national road is created. The dam height and width varies, the maximum height is 10 meters and the dam crest is constant 3 m wide. Next is to create one drainage system, an access track and a passable Fallboden.

To increase the safety at work site temporary rockfall protection nets were created in 2016th The rockfall protection nets are checked again before starting of this mandate. These works are not part of this tender. During construction, the security arrangements of the building owner is subject.

Construction work for buildings relating to health

Spital STS AG | Published December 12, 2015
cpvs
45215100

Construction work for buildings relating to health