Call +44 800 9755 164

Public tenders for construction in Schwyz Switzerland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

Gemeinde Schwyz | Published February 18, 2015  -  Deadline March 6, 2015
cpvs
45000000

The town of Schwyz intends to redevelop to Käppeliberg on a road length of 3.6 km in the years 2015 and 2016, the Haggeneggstrasse section Ried. This award includes the construction of the retaining structures and seepage: - new construction and renovation of Rollierungen, stone walls; - Construction of concrete retaining walls with micro piles; - Rehabilitation and construction of seepage. In the selection of the construction of the standard of construction of the road, the vehicle load of 18 tons and the topographical conditions must be considered. The road freight has a variable expansion width of approximately 3.00 m to 3.60 m and a longitudinal average gradient of about 13%. The covering, which is anticipated in 2016, advertised separately in due course.

Construction work

Gemeinde Schwyz, Abteilung Liegenschaften | Published March 11, 2015  -  Deadline April 15, 2015
cpvs
45000000

Basement excavation and construction work for a retention system. A total of 2 units, one of which in concrete and another with PE-pipe system. Entire system with preparatory work, installation, excavation and construction work.

Construction work

Stiftung Acherhof | Published November 30, 2016  -  Deadline December 16, 2016
cpvs
45000000

Dismantling and demolition.

Southern bypass Küssnacht, Section Ebnet - Räbmatt; Construction work Los 06 overpass Artherstrasse

Tiefbauamt Kanton Schwyz | Published November 25, 2016  -  Deadline January 27, 2017
cpvs
45221111

CPV: 45221111 - Road bridge construction,
45233100 - Construction work for highways, roads

Works for complete or part construction and civil engineering work

Elektrizitätswerk Schwyz AG | Published May 13, 2015  -  Deadline June 17, 2015
cpvs
45200000

The power station Schwyz AG (EWS) has been operating for about 100 years in the land KTN 1514 and 1515 in the region Rüti the Werkhof "Diesel" with the construction, maintenance and operation of the distribution networks in the districts Küssnacht, Gersau and parts of the district Schwyz necessary infrastructure as well as the installation office Schwyz. Due to the lack of storage space currently external objects must be rented, the An-rdnung the existing premises on the site does not allow rational and efficient workflows to. In addition to the maintenance depot location on the plot in 1514 to the office workstations, which today are located on the premises of Strehlgasse 11 and 13 in Schwyz, are summarized also in the new location. The new building thus a concentration of all divisions of the EWS is to be implemented at the joint site in diesel lbach. The new building is a contemporary Werkhof arise, which enables an optimal and efficient operation.

Construction work

Gemeinde Schwyz, Abteilung Liegenschaften | Published February 4, 2015  -  Deadline March 12, 2015
cpvs
45000000

Drilling / boreholes for groundwater use: preparatory work, installation, drilling operations.

Construction work

Elektrizitätswerk Schwyz AG | Published June 24, 2015
cpvs
45000000

Neubau EWS Ibach – Submission BKP 261 Lifte.

Construction, foundation and surface works for highways, roads

Tiefbauamt Kanton Schwyz, Abteilung Realisierung | Published February 4, 2015  -  Deadline March 13, 2015
cpvs
45233000

Mining, concrete and paving work: - clearing and grubbing about 6000 m²; - Pad Abort approximately 16 500m²; - Concrete demolition about 400 m³; - Rock clearance work 8 000 m²; - Falsabtrag almost 2 700 m³; - Excavation about 35 000 m³; - Construction pit / sheet piles approximately 1400 m²; - Micro piles up to 15 m depth approximately 4 900 m; - Formwork about 6 700 square meters; - Reinforcement of 650 t; - Concrete approximately 5 100 m³; - About 35 000 m² of geosynthetics; - Unbound mixture (sand) 35 000 cubic meters; - Asphalt concrete coverings approximately 13 500 tonnes; - Heissvergussfugen about 2 400 m; - Edgings about 5 000 m; - Road drainage around 3 600 m; - Shafts and sludge collector 150 pcs .; - Utility lines (water, sewer) about 5 600 m; - Conduit block systems (up to 12 KSR) is about 2 100 meters.

Road bridge construction work

Tiefbauamt Kanton Schwyz | Published November 30, 2016  -  Deadline January 27, 2017
cpvs
45221111, 45233100

For the new Canton Road section of the southern bypass of Küssnacht are under Lot 06

following work to create:

23 m long flyover, span 19 m, sound flat, monolithic and prestressed longitudinally Ortbetonrahmenkonstruktion. Expansion and conversion under traffic of a 500 m long road with 2 T-node. The following detailed main cubatures are solely for general information.

Covering breaking about 7 340 m 2

Excavation approximately 4 550 m 3 firmly

Removal, some 4 300 m 3 firmly

Concrete 700 m 3

Formwork about 1 330 m 2

Reinforcement 100 t

PBD seal about 320 m 2

Fills and backfills approximately 14 780 m 3 loose

Edgings about 2 420 m

Road drainage approximately 1 000 meters

Rolled asphalt about 3 500 tonnes

Bias about 190 m.

Construction work for tunnels, shafts and subways

Tiefbauamt Kanton Schwyz | Published April 21, 2015
Winner
Anliker AG Bauunternehmung
cpvs
45221200, 45233000

Südumfahrung Küssnacht, Abschnitt Ebnet – Räbmatt, Bauarbeiten Los 00-04.

Works for complete or part construction and civil engineering work

Elektrizitätswerk Schwyz AG | Published May 31, 2016
cpvs
45200000, 45112700

New maintenance depot and service buildings.

Works for complete or part construction and civil engineering work

Elektrizitätswerk Schwyz AG | Published April 6, 2016  -  Deadline May 11, 2016
cpvs
45200000, 45112700

The power station Schwyz AG (EWS) has been operating for about 100 years in the grounds KTN 1514 the Werkhof "Diesel", as well as the installation office Schwyz. Due to the lack of storage space currently external objects must be rented, the arrangement of the existing premises on the site does not allow rational and efficient work processes. In addition to the maintenance depot to the office workstations, which today are located in the premises of Strehlgasse 11 and 13 in Schwyz, are summarized also in the new location. The new building thus a concentration of all business lines EWS is to be implemented at the joint site in diesel lbach. The new building is a contemporary Werkhof arise, which enables an optimal and efficient operation.

Works for complete or part construction and civil engineering work

Elektrizitätswerk Schwyz AG | Published September 2, 2015
cpvs
45200000, 44221100, 45421132, 45421100, 45421112

Neubau Werkhof und Dienstleistungsgebäude.

Works for complete or part construction and civil engineering work

Elektrizitätswerk Schwyz AG | Published June 3, 2015  -  Deadline July 8, 2015
cpvs
45200000, 45261410, 45261420, 44115400, 45312310

The power station Schwyz AG (EWS) has been operating for about 100 years in the grounds KTN 1514 the Werkhof "Diesel", as well as the installation office Schwyz. Due to the lack of storage space currently external objects must be rented, the arrangement of the existing facilities on the site does not allow rational and efficient workflows to. In addition to the maintenance depot to the office workstations, which today are located on the premises of Strehlgasse 11 and 13 in Schwyz, are summarized also in the new location. The new building thus a concentration of all business lines EWS is to be implemented at the joint site in diesel lbach. The new building is a contemporary Werkhof arise, which enables an optimal and efficient operation.

Works for complete or part construction and civil engineering work

Elektrizitätswerk Schwyz AG | Published June 17, 2015  -  Deadline July 22, 2015
cpvs
45200000, 45443000

The power station Schwyz AG (EWS) has been operating for about 100 years in the grounds KTN 1514 the Werkhof "Diesel", as well as the installation office Schwyz. Due to the lack of storage space currently external objects must be rented, the arrangement of the existing facilities on the site does not allow rational and efficient workflows to. In addition to the maintenance depot to the office workstations, which today are located on the premises of Strehlgasse 11 and 13 in Schwyz, are summarized also in the new location. The new building thus a concentration of all business lines EWS is to be implemented at the joint site in diesel lbach. The new building is a contemporary Werkhof arise, which enables an optimal and efficient operation.

Works for complete or part construction and civil engineering work

Elektrizitätswerk Schwyz AG | Published June 10, 2015  -  Deadline July 15, 2015
cpvs
45200000, 44221100, 45421132, 45421100, 45421112

The power station Schwyz AG (EWS) has been operating for about 100 years in the grounds KTN 1514 the Werkhof "Diesel", as well as the installation office Schwyz. Due to the lack of storage space currently external objects must be rented, the arrangement of the existing facilities on the site does not allow rational and efficient workflows to. In addition to the maintenance depot to the office workstations, which today are located on the premises of Strehlgasse 11 and 13 in Schwyz, are summarized also in the new location. The new building thus a concentration of all business lines EWS is to be implemented at the joint site in diesel lbach. The new building is a contemporary Werkhof arise, which enables an optimal and efficient operation.

Southern bypass Küssnacht, Section Ebnet - Räbmatt; Construction work Los 05 PU Räbmatt

Tiefbauamt Kanton Schwyz | Published August 19, 2016  -  Deadline September 23, 2016
cpvs
45221210

For the new cantonal road section of the southern bypass of Küssnacht are to create 05 following work under Lot:
37 m long pedestrian underpass in reinforced concrete realized in 2 stages under traffic, 23 m long trough structure of reinforced concrete and road (65 m main road). The following detailed main cubatures are solely for general information.
Covering breaking ca. 1'100 m2
Excavation approximately 4,000 m3
Shotcrete (Excavation) 450 m2
Tension free anchor (nailing) ca. 1'500 m
Concrete 550 m3
Formwork ca. 1'400 m2
Reinforcement 70 t
PBD seal 250 m2
Hard concrete covering approximately 250 m2
Foundation layers 900 m3 loose
Fills and backfills approximately 1,300 m3 loose
Rolled asphalt 500 t
Edgings approximately 160 m
Street drainage 200m

In addition, should a long and 6 m high cantilever wall are made of reinforced concrete in the extended perimeter of the construction site, a roughly 23 m. The main cubatures the retaining wall be.
Excavation approximately 300 m3
Concrete about 80 m3
Formwork 250 m2
Reinforcement about 10 t
Fills and backfills 400 m3

New Age community center Schwyz

Gemeinde Schwyz, Abteilung Liegenschaften Herrengasse 23 CH-6431 Schwyz | Published March 6, 2015  -  Deadline April 15, 2015
cpvs
45000000

Basement excavation and construction work for a retention system. A total of 2 units, one of which in concrete and another with PE-pipe system. Entire system with preparatory work, installation, excavation and construction work.

BKP 230 Electrical Installations

Stiftung Acherhof | Published March 10, 2017  -  Deadline March 31, 2017
cpvs
45000000

CPV: 45000000 - Construction work
Construction costs plan number (BKP): 230 - Transition position

building automation

Stiftung Acherhof | Published March 10, 2017  -  Deadline March 31, 2017
cpvs
45000000

CPV: 45000000 - Construction work
Construction costs plan number (BKP): 237 - Building Automation