Public tenders for construction in Romont Switzerland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction of the municipal administration building

Module sa bureau d'architecture | Published December 2, 2016  -  Deadline January 13, 2017
cpvs
45000000

CPV: 45000000 - Construction work
Code of construction costs (CFCs) 201 - Full body Unreasonable
211 - Construction of the building firm,
401 - Earth Travel,
411 - Construction of the building firm,
429 - Other,
445 - Sanitary facilities,
451 - Earthworks,
452 - Pipes (connection auréseau)
453 - Electricity (network connection)
454 - HVAC (network connection)
455 - Water and gas (network connection)
463 - superstructures,
464 - Drainage

Special medical building construction work

Réseau Santé de la Glâne | Published October 27, 2015
Winner
TIP & TOP Pressing Service SA
cpvs
45215120, 45211200

Construction d'un établissement médico-social, parcelle 265, route de Villariaz, 30, 1687 Vuisternens-devant-Romont.

Water evacuation - Sector "CO"

MGI Genilloud Ingénieurs conseils SA | Published May 12, 2017  -  Deadline June 23, 2017
cpvs
45000000

CPV: 45000000 - Construction work

Construction of a nursing home, plot 265, Villariaz drive 30, 1687 Vuisternens front Romont

Réseau Santé de la Glâne | Published July 15, 2016  -  Deadline September 2, 2016
cpvs
45421146

The project is a medical and social establishment of 89 beds.

The building has 6 levels including 1 basement, 1 ground floor common services including a regeneration kitchen, laundry room and a burial chamber, three floors of wards, and 1 technical floor including 2 technical rooms.

The nursing units are as follows:

- 27 beds psychoriatrie 2 units each of which comprises its therapeutic terrace
- 62 beds distributed over 2 floors of GPs units.

The building structure is reinforced concrete.
The peripheral concrete is visible outside, the insulation being inside.
The roof slab is reinforced concrete.
Heat production is mixed, by geothermal probes, gas boiler and solar panels.

Construction of a nursing home, plot 265, Route Villariaz 30, 1687 Vuisternens-devant-Romont.

Réseau Santé de la Glâne | Published February 24, 2016  -  Deadline April 8, 2016
cpvs
45431100, 45431200

The project is a nursing home with 89 beds.

The building has 6 levels including 1 basement, 1 ground floor common services including a regeneration kitchen, laundry room and a burial chamber, three floors of wards, and 1 technical floor including 2 technical rooms.

The nursing units are as follows:

- 27 beds in two psychiatric units, each of which includes its therapeutic Terrace,

- 62 beds spread over 2 floors of GPs units.

The building structure is reinforced concrete.

The peripheral concrete is visible outside, the insulation being inside.

The roof slab is reinforced concrete.

Heat production is mixed, by geothermal probes, gas boiler and solar panels.

Construction of a nursing home, plot 265, route de Villariaz, 30, 1687 before Vuisternens Romont.

Réseau santé de la Glâne | Published October 14, 2014  -  Deadline November 28, 2014
cpvs
45215120, 45211200

The project is a social medical facility 89 beds. The building has six levels including 1 basement, 1 ground floor common service kitchen regeneration, a laundry and a burial chamber, three floors of wards, and 1 technical floor including two technical rooms. Care units are as follows: - 27 beds in two units psychoriatrie, each of which includes its therapeutic terrace - 62 beds on two floors of general units. The building structure is reinforced concrete. Device concrete is visible outside the insulation being inside. The roof slab is reinforced concrete. Heat production is mixed with ground probes, gas boiler and solar panels.

AF-union Auboranges Vuibroye collective work, subsidizing 3rd stage

Geosud SA | Published September 23, 2016  -  Deadline November 2, 2016
cpvs
45222000

CPV: 45222000 - Construction work for engineering works except bridges, tunnels, shafts and subways

Installation of suspended ceilings

Réseau Santé de la Glâne | Published July 19, 2016  -  Deadline September 2, 2016
cpvs
45421146

The project is a medical and social establishment of 89 beds.

The building has 6 levels including 1 basement, 1 ground floor common services including a regeneration kitchen, laundry room and a burial chamber, three floors of wards, and 1 technical floor including 2 technical rooms.

The nursing units are as follows:

- 27 beds psychoriatrie 2 units each of which comprises its therapeutic terrace,

- 62 beds distributed over 2 floors of GPs units.

The building structure is reinforced concrete.

The peripheral concrete is visible outside, the insulation being inside.

The roof slab is reinforced concrete.

Heat production is mixed, by geothermal probes, gas boiler and solar panels.

Wall-covering work

Réseau santé de la Glâne | Published October 27, 2015  -  Deadline December 4, 2015
cpvs
45432210

The project is a nursing home 89 beds. The building features 6 levels including 1 basement, 1 ground floor of common services 1 regeneration kitchen, 1 laundry room and 1 burial chamber, three floors of wards, and 1 technical floor including 2 technical rooms. The wards are as follows: - 27 beds in 2 psychoriatrie units, each of which includes its therapeutic terrace - 62 beds spread over 2 floors of GPs units. The building structure is reinforced concrete. Device concrete is visible outside, the insulation being inside. Roofing slab is reinforced concrete. Heat production is mixed, by geothermal probes, gas boiler and solar panels.

Floor-laying work

Réseau santé de la Glâne | Published October 27, 2015  -  Deadline December 4, 2015
cpvs
45432110

The project is a nursing home 89 beds. The building features 6 levels including 1 basement, 1 RDC common services including a regeneration kitchen, laundry room and a burial chamber, three floors of wards, and 1 technical floor including 2 technical rooms. The wards are as follows: - 27 beds in 2 psychoriatrie units, each of which includes its therapeutic terrace - 62 beds spread over 2 floors of GPs units. The building structure is reinforced concrete. Device concrete is visible outside, the insulation being inside. Roofing slab is reinforced concrete. Heat production is mixed, by geothermal probes, gas boiler and solar panels.