Renewal Waldenburgerbahn: Construction Management and Construction Management (North and South)

BLT Baselland Transport AG | Published December 8, 2016  -  Deadline January 24, 2017
CPV: 71500000 - Construction-related services

Construction-related services

BLT Baselland Transport AG | Published December 13, 2016  -  Deadline January 24, 2017

The BLT line "Waldenburgerbahn" (WB) is a narrow-gauge railway, which in space Liestal - taking on a vital role in public transport Waldenburg. the Bahninfrastuktur the WB needs to be renewed in the coming years for ensuring future attractive public transport offer.

The roadway (incl. Umspurung bon 750 mm to 1 000 mm) and 12 stops in accordance with currently valid Gesetzbegung and guidelines to be recreated on a stretch of about 13 km. The aim is to take up the timetable change 2022 new BLT line WB in operation.

The execution is staggered and in running rail operations. Due to the tight schedule, as many works prior to the scheduled total lock Dec. must be carried out in 2021 to Dec. 2022nd The main work (gauging and testing phase) will take place during the road closures in 2022nd To support the client to a site management (Nord for the renovation project of Waldenburgerbahn and ...

The BLT line "Waldenburgerbahn" (WB) is a narrow-gauge railway, which in space Liestal - taking on a vital role in public transport Waldenburg. the Bahninfrastuktur the WB needs to be renewed in the coming years for ensuring future attractive public transport offer.

The roadway (incl. Umspurung bon 750 mm to 1 000 mm) and 12 stops in accordance with currently applicable legislation and guidelines to be recreated on a stretch of about 13 km. The aim is to take up the timetable change 2022 new BLT line WB in operation.

The execution is staggered and in running rail operations. Due to the tight schedule, as many works prior to the scheduled total lock Dec. must be carried out in 2021 to Dec. 2022nd The main work (gauging and testing phase) will take place during the road closures in 2022nd To support the client to a site management (Nord for the renovation project of Waldenburgerbahn and ...

BLT line 10, renewal catenary New World - Münchenstein

BLT Baselland Transport AG | Published January 5, 2017  -  Deadline January 26, 2017
CPV: 45000000 - Construction work