Duggingen - New construction of mixed water basin railway construction

Bau- und Umweltschutzdirektion Kanton Basel-Landschaft Zentrale Beschaffungsstelle | Published October 12, 2017  -  Deadline November 14, 2017
cpvs
45000000

CPV: 45000000 - Construction,
45200000 - Complete or partial construction work in building construction and civil engineering work

Construction work

Holinger AG Ingenieurunternehmen | Published February 28, 2017  -  Deadline April 6, 2017
cpvs
45000000

As a measure of the regional water supply planning in the canton of Basel-Country, the transit line Birstal is created.

The subproject Pumpwerk Widenhof includes the construction of the pumping station and its equipment. is created an underground structure in massive construction.

excavation

There is provided a free-sloped pit with interposed berm. The embankments are entire surface covered with plastic, and pumped water accumulating from rainfall. The bottom of the pit is as soon as possible coated with a layer of concrete to prevent storm water before infiltration. Basically, no water to seep into the pit, and shall be taken and pumped accordingly. The storage areas for excavation are right next to the construction site.

shell

You will build the underground construction has the approximate dimensions of 19 x 15 x 4.5 m (LxWxH) and has the following features:

-High Claim to the resistance: a "bath tub"

-Various ...

Framework agreement for construction insurance

Finanz- und Kirchendirektion Kanton Basel-Landschaft Finanzverwaltung und Zentrale Beschaffungsstelle ZBS | Published July 14, 2016  -  Deadline September 2, 2016
cpvs
66510000

Framework agreement for construction insurance
- Construction insurance in civil engineering
- Builders liability insurance in civil engineering

Construction work

Bau- und Umweltschutzdirektion Kanton Basel-Landschaft Zentrale Beschaffungsstelle | Published October 3, 2017  -  Deadline November 30, 2017
cpvs
45000000, 45200000, 45222000

Demolish existing street, pavement and space areas (covering and luggage). Demolition of the Tramgleise. New building tramway including substructure as well as new building street, trottoir and space areas. New construction works.

Construction work

Bau- und Umweltschutzdirektion Kanton Basel-Landschaft Zentrale Beschaffungsstelle | Published December 17, 2016
Winner
Marti AG Pratteln
cpvs
45000000, 45221000, 45222000, 45231000, 45231300

Aesch - Shuttle Pfeffingerring, New construction for high-performance road A18 / renewal main road.

Construction work

Bau- und Umweltschutzdirektion Kanton Basel-Landschaft | Published April 23, 2016  -  Deadline June 10, 2016
cpvs
45000000, 45214200, 45262670

Main section:

Dismantling and disposal spec. Metal construction, installation of railings, handrails, gratings, kick zone statements.

Architectural, construction, engineering and inspection services

Bau- und Umweltschutzdirektion Kanton Basel-Landschaft Zentrale Beschaffungsstelle | Published March 14, 2017  -  Deadline April 20, 2017
cpvs
71000000, 71300000, 71320000, 71322000, 71500000, 71520000

Engineering services:

There are benefits for the phases 32 to provide 41 and 51 to 53.

According to SIA standards 103 and 112 comprise the achievements summarized the following points:

- Creation of measures project with cost estimate and construction schedule;

- Drawing up the documents for execution, optimize costs, construction processes set (construction planning) and Schedules define;

- Coordination with neighboring construction sites;

create tender documents for the entrepreneur and perform procurement of works -;

- The building under contract / specification repair;

- Building into operation, fix defects, create final settlement and delivery of the plans of the executed work.

The coordination with all relevant stakeholders, also one of the ...

Engineering services:

There are benefits for the phases 32 to provide 41 and 51 to 53.

According to SIA standards 103 and 112 comprise the achievements summarized the following points:

- Creation of measures project with cost estimate and construction schedule;

- Drawing up the documents for execution, optimize costs, construction processes set (construction planning) and Schedules define;

- Coordination with neighboring construction sites;

create tender documents for the entrepreneur and perform procurement of works -;

- The building under contract / specification repair;

- Building into operation, fix defects, create final settlement and delivery of the plans of the executed work.

The coordination with all relevant stakeholders, also one of the ...

Sissach - Neubauwerkhof TBA Kreis 3, construction works

Bau- und Umweltschutzdirektion Kanton Basel-Landschaft Zentrale Beschaffungsstelle | Published September 28, 2017  -  Deadline November 29, 2017
cpvs
45000000

CPV: 45000000 - Construction,
45200000 - Complete or partial construction work in building construction and civil engineering work,
45210000 - Building construction work,
45213000 - Construction work for commercial buildings, warehouses and industrial buildings, buildings relating to transport
Building cost plan number (BKP): 20 - excavation pit,
201 - Excavation excavation,
21 - shell construction 1,
211 - Construction work

Transit line Birstal, lot 2 (pipeline construction)

SUTTER Ingenieur- und Planungsbüro AG | Published May 26, 2017  -  Deadline April 6, 2017
cpvs

Transit line Birstal, lot 2 (pipeline construction)

Allschwil - Renewal Baslerstrasse Strassen- und Tiefbau as well as track construction work

Bau- und Umweltschutzdirektion Kanton Basel-Landschaft Zentrale Beschaffungsstelle | Published September 28, 2017  -  Deadline November 30, 2017
cpvs
45000000

CPV: 45000000 - Construction,
45200000 - Complete or partial construction work in building construction and civil engineering work,
45222000 - Construction works other than bridges, tunnels, shafts and subways

Force Birs, flood, main work / hydraulic engineering and construction work

Bau- und Umweltschutzdirektion Kanton Basel-Landschaft Zentrale Beschaffungsstelle | Published March 30, 2017  -  Deadline May 11, 2017
cpvs
45000000

CPV: 45000000 - Construction,
45200000 - Works for complete or part construction and civil engineering work,
45240000 - hydraulic works,
45222000 - Surface work except bridges, tunnels, shafts and subways
Construction costs plan number (BKP): 4112 - embankments, embankments,
411 - construction work,
464 - dewatering

Architectural, construction, engineering and inspection services

Bau- und Umweltschutzdirektion Kanton Basel-Landschaft, Zentrale Beschaffungsstelle | Published June 16, 2015  -  Deadline July 30, 2015
cpvs
71000000, 71300000, 71320000, 71322000, 71500000, 71520000

The tender includes the general planning, the construction and supporting project tendering and realization of: - Tram dual-track expansion in section Spiesshöfli (350 m length), - renewal Bottmingerstrasse, - lifting railway crossings, new superstructure Birsigbrücke, new access tracks property and discontinuations property. There are benefits for the phases 32, 33, 41 and provide 51 to 53.

Architectural, construction, engineering and inspection services

Bau- und Umweltschutzdirektion Kanton Basel-Landschaft Zentrale Beschaffungsstelle | Published October 1, 2016
Winner
IG Gruner AG / Jauslin Stebler AG
cpvs
71000000, 71300000, 71322000

Allschwil - Shuttle Bachgraben; - Nordtangente. Bypass Hésingue / Hégenheim preliminary project subjects "transport", "construction" and "environmental" including coordination.

Pratteln - Augst, Salina Raurica laying main road 3/7 Gesamtleiter- and construction management mandate (BHU)

Bau- und Umweltschutzdirektion Kanton Basel-Landschaft Tiefbauamt und Zentrale Beschaffungsstelle | Published September 17, 2015  -  Deadline October 29, 2015
cpvs
71300000

The tender includes the overall management (construction Mr. representation) and construction management for the relocation of the main road in the area 3/7 Salina Raurica for phases 33-53 in accordance with SIA 103 (2014).

Construction work

Bau- und Umweltschutzdirektion Kanton Basel-Landschaft Zentrale Beschaffungsstelle | Published April 14, 2017  -  Deadline May 31, 2017
cpvs
45000000, 45200000, 45220000

principal amounts

earthwork

- excavation 22 000 m 3 ;

- depth of up to 9 m.

Bohrpfähle

- about 60 pieces,

- lengths total of about 1 000 meters,

- Reinforcement 60 000 kilograms.

excavation

- shotcrete 200m 2 .

- enfierraduras about 2 500 kg.

Holes for injection anchor

- about 90 anchor,

- Total length 400 m.

principal amounts

earthwork

- excavation 22 000 m 3 .

- depth of up to 9 m.

Bohrpfähle

- about 60 pieces,

- lengths total of about 1 000 meters,

- Reinforcement 60 000 kilograms.

excavation

- shotcrete 200m 2 .

- enfierraduras about 2 500 kg.

Holes for injection anchor

- about 90 anchor,

- Total length 400 m.

Construction work

Bau- und Umweltschutzdirektion Kanton Basel-Landschaft Zentrale Beschaffungsstelle | Published October 3, 2017  -  Deadline November 17, 2017
cpvs
45000000, 45210000, 45214000, 45260000, 45261213, 45261214, 45261410, 31216100

major works

Delivering and assembling a warm roof, concrete subfloorless, waterproofing of bituminous membranes,

Waterproofing of liquid plastic, PU thermal insulation, extensive roofing, walkways, incl. All connections and closures made of sheet metal, mounting and dismantling, emergency overflows and lightning protection deposit etc.

major works

Delivering and assembling a warm roof, concrete subfloorless, waterproofing of bituminous membranes,

Waterproofing of liquid plastic, PU thermal insulation, extensive roofing, walkways, incl. All connections and closures made of sheet metal, mounting and dismantling, emergency overflows and lightning protection deposit etc.

Construction work

Bau- und Umweltschutzdirektion Kanton Basel-Landschaft Zentrale Beschaffungsstelle | Published October 6, 2017  -  Deadline November 24, 2017
cpvs
45000000, 45210000, 45214000, 45331000, 42512300

Main works

Supply and installation of heat generation and distribution, ground-mounted ventilation ducts, monoblock systems, supply and exhaust air ducts including fire protection flaps, ventilation grids, pipelines, radiators, insulation, apparatuses, fittings and instruments, automation stations, control cabinets, field devices, BSK controller system, etc.

Main works

Supply and installation of heat generation and distribution, ground-mounted ventilation ducts, monoblock systems, supply and exhaust air ducts including fire protection flaps, ventilation grids, pipelines, radiators, insulation, apparatuses, fittings and instruments, automation stations, control cabinets, field devices, BSK controller system, etc.

Aesch - Shuttle Pfeffingerring, New construction for high-performance road A18 / renewal main road

Bau- und Umweltschutzdirektion Kanton Basel-Landschaft Zentrale Beschaffungsstelle | Published December 15, 2016  -  Deadline October 27, 2016
cpvs

Aesch - Shuttle Pfeffingerring, New construction for high-performance road A18 / renewal main road

Architectural, construction, engineering and inspection services

Bau- und Umweltschutzdirektion Kanton Basel-Landschaft Zentrale Beschaffungsstelle | Published July 5, 2016  -  Deadline August 18, 2016
cpvs
71000000, 71300000, 71322000

The shuttle is closely connected with other road construction projects in the area Allschwil. The preliminary study must take account of these relationships, in particular so that shortcuts and options for possible later additions are safeguarded. Therefore, the project includes the following sections (components):

- Shuttle Bachgraben - Nordtangente

- Contournement Hésingue / Hégenheim

- Tunnel Allschwil

Special boundary condition of the preliminary study is the bi-national framework. This generates the one hand, by the inclusion of the "Contournement Hésingue / Hégenheim" in phase 1 and on the other hand the possibility that the section "Shuttle Bachgraben - Nordtangente" could possibly also affect French territory.

With the preliminary versions are elaborated. Appropriateness and feasibility of options to analyze and prioritize a review. The preliminary study therefore includes the following phases:

- Phase 1: Analysis and development of rough variants (variant subjects and determining the options for Phase 2)

- Phase 2: Description and evaluation studies (effects, appropriateness and feasibility as well as review a basis for decisions to phase 3)

- Phase 3: prioritization and recommendation (total synthesis)

At the end of the work is for the shuttle Bachgraben - are fixed Nordtangente the input into the preliminary project (s) variant (s). For the tunnel Allschwil the variant (of the connection regions in space boots incl.) Is a spatial planning to back track to determine.

Demolition and construction work BIO2

HOLINGER AG | Published March 17, 2017  -  Deadline April 10, 2017
cpvs
39350000

CPV: 39350000 - Wastewater Treatment Plant,
45111100 - Demolition,
45262311 - Concrete carcassing work