Call +44 800 9755 164

Public tenders for construction in Le-grand-saconnex...

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!
ConstructionSwitzerlandle-grand-saconnex

Construction work

Service de l'urbanisme et des bâtiments | Published November 22, 2016  -  Deadline January 27, 2017

general contractor in construction of a secondary school for 700 students, 35 classrooms, 15 special classrooms, multipurpose room, refectory and triple gym. 3 covered in yard, outdoor facilities, 504 places of covered bike (including 360 on private communal area in 2346) and fenced area for container.

Construction work

Qualis.ch Sàrl | Published November 10, 2016  -  Deadline January 9, 2017

inner transformations des Halles 1-3 in preparation for the installation of the Institute and high school health Source The HES-SO.

Construction of plumbing and roofing.

inner transformations des Halles 1-3 in preparation for the installation of the Institute and high school health Source The HES-SO.

Construction of plumbing and roofing.

Construction work

Service achats transports publics genevois | Published November 18, 2016  -  Deadline January 24, 2017

Lot "Wooden doors Fire" includes performing (supply and installation) of fire wood doors. Almost all of the doors, (except the doors for showers), must withstand fire for at least 30 min. They must be fitted with doors closed to protect the corridors of escape routes. Maintenance will be carried out internally by teams TPG therefore no maintenance contract is required.

TENDER FOR GENERAL BUSINESS (EG) FOR THE CONSTRUCTION OF THE BOARD OF BANKS

Service de l'urbanisme et des bâtiments | Published November 18, 2016  -  Deadline January 27, 2017
CPV: 45000000 - Construction work
Code of construction costs (CFCs) 1 - Preparatory work,
2 - Building,
3 - Operating Supplies
4 - Landscaping

Bridge renewal construction work

Office fédéral des routes — Infrastructure routière Ouest — Filiale Estavayer-le-Lac | Published November 3, 2016  -  Deadline December 12, 2016
The bridges over the Veveyse are located on the route of the motorway N09, along the Montreux Chexbres-section (26,800 km) and allow to cross the valley carved by the river Veveyse. This project focuses on the foundations on the left side of the Veveyse. 2 blocks in reinforced concrete are currently located under each of the two foundations, to consolidate the rock in steep point of the slope by means of prestressed tie rods. A series of vertical bars were used to stabilize the stacks and the foundation when the bridge construction.

Placing dump gates with bicycle path and change bags grids abyss bags

Direction de l'entretien des routes - Service technique | Published November 22, 2016  -  Deadline December 19, 2016
CPV: 45000000 - Construction work

N09 Upn.Vennes - Chexbres + PUN - deputy of the environmental monitoring of the implementation (SER) 2017 work 2020

Office fédéral des routes - Infrastructure routière Ouest Filiale Estavayer-le-Lac | Published October 24, 2016  -  Deadline December 5, 2016
CPV: 71313450 - Environmental monitoring for construction

Lot 25 - CFC 283.8 sound insulation under the roof slab

Service Achats Transports publics genevois | Published November 15, 2016  -  Deadline January 24, 2017
CPV: 45000000 - Construction work,
44000000 - Construction materials and structures; auxiliary products to construction (except electric apparatus)
Code of construction costs (CFCs) 225 - Special Sealing and insulation,
2252 - Special insulation

City Meyrin - Sprinkler

Bureau d'ingénieurs SABERT SA | Published November 22, 2016  -  Deadline December 16, 2016
CPV: 71500000 - Construction-related services

Lot 30 - CFC 273.0 Fire doors in wood

Service Achats Transports publics genevois | Published November 15, 2016  -  Deadline January 24, 2017
CPV: 45000000 - Construction work
Code of construction costs (CFCs) 2730 - Interior doors in wood

Ville de Meyrin - réfection terrain synthétique de football C

Bureau d'ingénieurs SABERT SA | Published November 22, 2016  -  Deadline December 16, 2016
CPV:  71500000 - Services relatifs à la construction

IAV - FACILITIES INTERIOR OFFICE - WALLS

FREI & STEFANI SA | Published November 22, 2016  -  Deadline January 9, 2017
CPV: 45442100 - Painting work,
45410000 - Plastering work,
45421141 - Installation of partitioning,
45421131 - installation of doors
Code of construction costs (CFCs) 27 - Interior 1

N09 Ant. Chexbres - Montreux - Securing anchored bridge foundations on the Veveyse - Lot 81

Office fédéral des routes - Infrastructure routière Ouest Filiale Estavayer-le-Lac | Published November 2, 2016  -  Deadline December 12, 2016
CPV: 45221119 - Bridge renewal construction work

080,090 - Heritage Conservation Branch 1 - Laboratory Investigations on concrete structures - UT Region II - Period 2017-2021

Office fédéral des routes (OFROU) | Published November 4, 2016  -  Deadline December 14, 2016
Meldungsnummer 936,293 
Die offizielle Ausschreibung im erfolgte folgendem Publikationsorgan: Simap
Veröffentlichungsdatum: 04/11/2016

080,090 - Heritage Conservation Branch 1 - Laboratory Investigations on concrete structures - UT Region II - Period 2017-2021 (4327 ID)

Office fédéral des routes (OFROU) | Published November 4, 2016  -  Deadline December 14, 2016
CPV: 71600000 - Technical testing, analysis and consultancy services

Health and safety consultancy services

Office fédéral des routes — Infrastructure routière Ouest — Filiale Estavayer-le-Lac | Published November 3, 2016  -  Deadline December 14, 2016
This contract concerns the security benefits coordinator for the following projects:

Installation of signalling equipment

Office fédéral des routes — infrastructure routière Ouest filiale Estavayer-le-Lac | Published November 4, 2016  -  Deadline December 15, 2016

Le présent marché comporte une partie principale (la réfection du tunnel Terri-Russelin) et une option (la réfection du tunnel de Develier)

Tunnel Terri-Russelin

— Renouvellement complet du système de gestion — signalisation (S-ZES)

— Entretien de la signalisation fixe, environ 90 pièces

— Révision de la signalisation dynamique, environ 25 pièces

— Renouvellement complet des signaux variables de vitesse à prismes éclairés par des signaux à LED, environ 22 pièces

— Renouvellement complet des signaux variables de disposition des voies à prismes éclairés, environ 16 pièces

— Renouvellement complet des feux tricolores en tunnel par des feux tricolores prismatiques à LED, environ 80 pièces

— Renouvellement complet des signaux variables de vitesse en tunnel par des signaux à LED, environ 35 pièces

— Renouvellement des signaux rétroéclairés en tunnel par des signaux à LED, environ 50 pièces

— Révision de la signalisation des dispositifs de sécurité, environ 170 pièces

— Fourniture, tirage et raccordement de câbles, environ 70 km

— Dépose et élimination des anciens signaux et câbles

Construction de nouveaux socles et batteries de tubes en ciel ouvert, environ 12 pièces

Option: Tunnel de Develier

— Renouvellement complet du système de gestion — signalisation (S-ZES)

— Entretien de la signalisation fixe, environ 30 pièces

— Révision de la signalisation dynamique, environ 6 pièces

— Renouvellement complet des signaux variables de vitesse à prismes éclairés par des signaux à LED, environ 20 pièces

— Renouvellement complet des signaux variables de disposition des voies à prismes éclairés, environ 15 pièces

— Renouvellement complet des feux tricolores en tunnel par des signaux tricolores prismatiques à LED, environ 20 pièces

— Renouvellement complet des signaux variables de vitesse en tunnel par des signaux à LED, environ 6 pièces

— Renouvellement complet des signaux rétroéclairés en tunnel par des signaux à LED, environ 12 pièces

— Révision de la signalisation des dispositifs de sécurité, environ 40 pièces

— Révision des dispositifs de fermeture des passages en terre-plein, environ 2 pièces

— Fourniture, tirage et raccordement de câbles, environ 8 km

— Dépose et élimination des anciens signaux et câbles

Les travaux dans le tunnel de Develier sont une option qui sera activée ou pas en 2018. La réalisation de l'option, si elle est activée pourra se réaliser en 2018 ou en 2019.

Le présent marché comporte une partie principale (la réfection du tunnel Terri-Russelin) et une option (la réfection du tunnel de Develier)

Tunnel Terri-Russelin

— Renouvellement complet du système de gestion — signalisation (S-ZES)

— Entretien de la signalisation fixe, environ 90 pièces

— Révision de la signalisation dynamique, environ 25 pièces

— Renouvellement complet des signaux variables de vitesse à prismes éclairés par des signaux à LED, environ 22 pièces

— Renouvellement complet des signaux variables de disposition des voies à prismes éclairés, environ 16 pièces

— Renouvellement complet des feux tricolores en tunnel par des feux tricolores prismatiques à LED, environ 80 pièces

— Renouvellement complet des signaux variables de vitesse en tunnel par des signaux à LED, environ 35 pièces

— Renouvellement des signaux rétroéclairés en tunnel par des signaux à LED, environ 50 pièces

— Révision de la signalisation des dispositifs de sécurité, environ 170 pièces

— Fourniture, tirage et raccordement de câbles, environ 70 km

— Dépose et élimination des anciens signaux et câbles

Construction de nouveaux socles et batteries de tubes en ciel ouvert, environ 12 pièces

Option: Tunnel de Develier

— Renouvellement complet du système de gestion — Signalisation (S-ZES)

— Entretien de la signalisation fixe, environ 30 pièces

— Révision de la signalisation dynamique, environ 6 pièces

— Renouvellement complet des signaux variables de vitesse à prismes éclairés par des signaux à LED, environ 20 pièces

— Renouvellement complet des signaux variables de disposition des voies à prismes éclairés, environ 15 pièces

— Renouvellement complet des feux tricolores en tunnel par des signaux tricolores prismatiques à LED, environ 20 pièces

— Renouvellement complet des signaux variables de vitesse en tunnel par des signaux à LED, environ 6 pièces

— Renouvellement complet des signaux rétroéclairés en tunnel par des signaux à LED, environ 12 pièces

— Révision de la signalisation des dispositifs de sécurité, environ 40 pièces

— Révision des dispositifs de fermeture des passages en terre-plein, environ 2 pièces

— Fourniture, tirage et raccordement de câbles, environ 8 km

— Dépose et élimination des anciens signaux et câbles

Les travaux dans le tunnel de Develier sont une option qui sera activée ou pas en 2018. La réalisation de l'option, si elle est activée pourra se réaliser en 2018 ou en 2019.

  • 1