Call +44 800 9755 164

Public tenders for construction in Gland Switzerland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

The proposed construction of a new nursing home (EMS)

Vallat Partenaires SA Conseils en marchés publics et en management de projets | Published January 10, 2017  -  Deadline April 7, 2017
cpvs
71200000

The competition concerns only architectural firms for the award of a full term. The project set 
contest is to achieve a nursing home (EMS) 68 beds and 8 seats CAT (reception center
day). The project is located on in utility area. The Employer search the optimal solution with a moderate investment and mastered for the realization of a design concept that meets all of the cantonal provisions and guidelines EMS constructions (DAEMS), but also the requirements for obtaining Minergie-P-Eco. the maximum allowable for the construction of this competition program is 14'320 m3, including Minergie bonus.

The proposed construction of a workshop depot in Trélex

Vallat Partenaires SA Conseils en marchés publics et gestion de projets | Published January 10, 2017  -  Deadline March 6, 2017
cpvs
71200000

CPV: 71200000 - Architectural,
71300000 - Engineering services

Project to build a multipurpose building

Vallat Partenaires SA Conseils en marchés publics et en gestion de projets | Published February 3, 2017  -  Deadline March 20, 2017
cpvs
71240000

CPV: 71240000 - Architectural, engineering and planning

Architectural and related services

Vallat Partenaires SA Conseils en marchés publics et gestion de projets | Published January 12, 2017  -  Deadline March 6, 2017
cpvs
71200000, 71300000

The procedure for the allocation of a contract to a multidisciplinary group composed of representatives of the architectural skills, civil engineer and engineers specialized in building systems (heating, ventilation, sanitation and electricity). The contracting authority reserves the right to sign a contract by proxy. Benefits attorneys phases relate 4.41 4.53 according to SIA 102, 103 and 108. The draft benefits, final project and permit application process to build (4.31 and 4.33 according to SIA phases) have already been performed by officers until 2014. they have completed their services, they are allowed to participate in the tender by the fact that they have not participated in the preparation of this tender. The result of their benefits is downloaded along with the tender documents.

The issuance of the building permit by the OFT is imminent and upon receipt will be provided to competitors. During the development phase of implementation plans, providers will need to adapt the internal management plans under the new requirements provided in the appendix of the file.

This contract covers the construction project of a workshop and office accommodation deposit, in order to maintain the existing rolling stock and future, but also to receive the administration and management of the Company.

The main constraints of this market are to avoid disturbing the operation of the rail network and access to the road to Nyon for the duration of the work.

Design support services

Vallat Partenaires SA Conseils en management de projets et en marchés publics | Published January 25, 2017  -  Deadline March 6, 2017
cpvs
79933000

As part of the project of the House of childhood and adolescence, HUG want to surround themselves with a support office in project management (BAMO) for monitoring, consulting and implementation instead of organizing the project and its implementation. It is stated that the role of BAMO is not to replace the role of agents responsible for project studies and construction management. The architectural competition is underway with a designated winner by the end of May 2017.

Property management services of real estate on a fee or contract basis

Vallat Partenaires SA, Conseils en marchés publics et en management de projets | Published February 11, 2017  -  Deadline March 20, 2017
cpvs
70330000

The new Meyrin Foundation owns new buildings that are being built in the new neighborhood of Orchards in the territory of the commune of Meyrin. The project has 6 buildings with 261 units in total, including 10 units in PPE, 20 IEPA housing and 4 units for the Fondation Ensemble, as well as commercial premises (tea room, pharmacy, grocery, Montessori school, etc ...) and a nursery in PPE.

It is expected that the first building (B13) is completed by the summer of 2017 with as the first tenants at the date 01/07/2017. The Foundation wishes to give this real estate to manage a company active in the building management, therefore it organizes an open tender and subject to international agreements on public procurement for the allocation of a mandate management to a board for the entire housing stock.

The rental status (tax) portfolio, excluding PPE, is a total of 6,195,465 CHF ...

  • 1