Call +44 800 9755 164

Public tenders for construction in Giswil Switzerland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction of a school complex with gym, UAPE-crib and PC-car shelter in Versegères (VS) CFC Construction Market: 214 - Wood Construction

Administration communale de Bagnes | Published October 28, 2016  -  Deadline December 8, 2016
cpvs
45000000

CPV: 45000000 - Construction work
Code of construction costs (CFCs) 214 - Wood Construction

Construction of the extension of the filing of road

Service technique | Published November 18, 2014  -  Deadline December 16, 2014
cpvs
45000000

Construction of a buried deposit of 2700 m3 earthworks, armor, reinforced concrete, equipment. Realization by a general contractor building company acting as general contractor or a general contractor

Construction of a Comprehensive Palliative and Geriatric Care Centre

EuroPace s.r.o. | Published May 27, 2015  -  Deadline June 15, 2015
cpvs
45215100

The subject of the below-the-threshold public contract “Construction of a Comprehensive Palliative and Geriatric Care Centre” is the construction of a Comprehensive Palliative and Geriatric Care Centre in the Hospice and Nursing Department in the Town of Albrechtice, which is a detached workplace of the Associated Healthcare Facility in Krnov. This construction will be carried out according to a PROJECT. The composition of buildings is provided in the project documentation entitled “Construction of a Comprehensive Palliative and Geriatric Care Centre in the Hospice and Nursing Department in the Town of Albrechtice”, compiled by the designers of IDEAPROJEKT spol. s.r.o., Ing. Miroslav Hrstka, Ing. Miroslav Bešík, Nám. Míru 13, 792 01 Bruntál, 6/2014, in accordance with §§ 44 – 46 of the Act on Public Contracts. The documentation includes a detailed bill of quantities (hereinafter the PROJECT), which forms Part III of the tender dossier.

Construction of a school complex with gym, UAPE-crib and PC-car shelter in Versegères (VS) Construction Market CFC 250 Sanitaire

Administration communale de Bagnes | Published October 28, 2016  -  Deadline December 8, 2016
cpvs
45000000

CPV: 45000000 - Construction work
Code of construction costs (CFCs) 25 - Sanitary facilities

Construction of a school complex with gym, UAPE-crib and PC-car shelter in Versegères (VS) CFC Construction Market: 244 - Ventilation Systems

Administration communale de Bagnes | Published October 28, 2016  -  Deadline December 8, 2016
cpvs
45000000

CPV: 45000000 - Construction work
Code of construction costs (CFCs) 244 - Ventilation Systems

Construction of a school complex with gym, UAPE-crib and PC-car shelter in Versegères (VS) CFC Construction Market: 23 - Electrical Installations

Administration communale de Bagnes | Published October 28, 2016  -  Deadline December 8, 2016
cpvs
45000000

CPV: 45000000 - Construction work
Code of construction costs (CFCs) 23 - Electrical Installations

Construction of a school complex with gym, UAPE-crib and PC-car shelter in Versegères (VS) CFC Construction Market: 211 - Works of building firm

Administration communale de Bagnes | Published October 28, 2016  -  Deadline December 8, 2016
cpvs
45000000

CPV: 45000000 - Construction work
Code of construction costs (CFCs) 211 - Works of building firm

Construction d'une passerelle en BFUP sur la RC 302 au Bouveret

Commune de Port-Valais | Published December 23, 2016  -  Deadline February 3, 2017
cpvs
45000000

CPV:  45000000 - Travaux de construction

Construction of a school complex with gym, UAPE-crib and PC-car shelter in Versegères (VS) CFC Construction Market: 240 - CFC waiting Post: 242 - Heat production CFC: 243 - Heat distribution

Administration communale de Bagnes | Published October 28, 2016  -  Deadline December 8, 2016
cpvs
45000000

CPV: 45000000 - Construction work
Code of construction costs (CFCs) 240 - Waiting Post,
242 - Heat generation,
243 - Heat distribution

Extension et transformation du Centre Sportif de Verbier, Bâtiment omnisports (OM). Construction d'un mur de grimpe

Commune de Bagnes | Published January 13, 2017  -  Deadline February 22, 2017
cpvs
45212200

CPV:  45212200 - Travaux de construction d'installations sportives
Code des frais de construction (CFC): 902 - Equipements de sport

Construction of a school complex with gym, UAPE-crib and PC-car shelter in Versegères (VS) Construction Market CFC 17 Special foundations CFC 201 CFC 211.4 Earthworks Pipelines

Administration communale de Bagnes | Published October 28, 2016  -  Deadline December 8, 2016
cpvs
45000000

CPV: 45000000 - Construction work
Code of construction costs (CFCs) 17 - spec Foundations, excavation protection, étanch.ouvr.enterrés,.
201 - Full body Unreasonable
2114 - Pipelines inside dubâtiment

Site preparation and excavation / civil works for new permanent office building construction at ...

United Nations Secretariat | Published March 9, 2016
cpvs

The United Nations Office in Geneva (UNOG), Switzerland, located at the Palais des Nations, is the largest United Nations Office in Europe, providing conference support and facilitating the multi-lateral international diplomacy of the worldwide community. It is located within the 46 hectare Ariana Park. The United Nations General Assembly approved the establishment of the Strategic Heritage Plan (SHP) which includes the construction of a New Permanent Office Building (NPB) of approximately 22,371 m2, together with the complete renovation of the main Palais des Nations complex of buildings, much of which dates back to the 1930’s. The NPB is to be constructed adjacent to the current building “E”. See Figure 1 attached. UNOG envisages issuing a solicitation for services required to undertake site / civil works in preparation for the construction of the NPB (which will be the subject of a separate procurement exercise) as part of the SHP. Brief Description of Requirements: UNOG seeks qualified civil works contractors to undertake site preparatory and excavation works as per the below requirements: i) Site clearance: including removal of existing site features such as fences, antennas, flora, fauna, soil, hard landscaping, etc. ii) Dismantling works: including the demolition of stone walls, fences, pavements (roads and car park areas), etc. iii) Temporary installations: including worksite facilities, barriers and temporary hoardings / fences, temporary diversions, supply connections including energy, water, telecommunications, data, sewers, etc. iv) Special foundations, retaining structures, support to basement, excavations and waterproofing: construction of three arrays of soldier pile walls for soil retention (approximately 3’000 m²) including bracing and supports, and pump and drainage installations to remove ground water. v) Basement Excavation: excavation and earthworks for the preparation of a working platform over the entire surface of the building construction area, storage of part of the soil (30’000 m³) in the surrounding areas and infills according to the landscaping project, and transportation of the excavated soil to external dump areas (13’000 m³).

Town of Belmont-Broye - Payerne Domdidier Sector RC 3400 - Avenches - Morat. Construction of a roundabout at the intersection Vy Avenches - road Vuarines

Edy Toscano SA Engineering & Consulting | Published January 27, 2017  -  Deadline March 10, 2017
cpvs
45200000

CPV: 45200000 - Construction work or part construction and civil engineering work

Construction works for connection to the District Heating System of buildings currently fed from group substation located at Kleczewska 38 stage I

Veolia Energia Warszawa S.A. | Published October 5, 2015  -  Deadline October 15, 2015
cpvs
45000000

The subject of the contract is the adaptation and construction works for connection to the District Heating System of buildings currently fed from group substation located at Kleczewska 38 stage I, i.e. the construction of district heating network and heating network connections, in the technology of pre-insulated in HDPE outer casing and pre-insulated pipes in SPIRO outer casing, with the resistance monitoring system compatible with the “BRANDES” signalling and alarm system.

Construction of a new office building ("Building H") at the Palais des Nations in Geneva, Swiitzerland

United Nations Secretariat | Published August 26, 2016
cpvs

SECTION I. INTRODUCTION The United Nations Office in Geneva ("UNOG"), Switzerland, located at the Palais des Nations, is the largest United Nations Office in Europe, providing conference support and facilitating the multi-lateral international diplomacy of the worldwide community. It is located within the 46 hectare Ariana Park.

The United Nations General Assembly approved the establishment of the Strategic Heritage Plan ("SHP") which includes a new office building of approximately 23'500 square meters (gross external area), with a site footprint of approximately 8'300 square meters, to be constructed adjacent to the location of the current conference and office building “E”.

The new office building is designed to step down a sloping site, consisting of six floors at the highest part and has two internal courtyards. See the two separate attachments with five images and four drawings of the new office building. The new office building includes a double height reception lobby area and has primarily open plan flexible office space with some enclosed offices for some 1’400 workstations, meeting rooms, coffee shop, technical rooms, and support spaces.

The new office building (“New Permanent Building” or "NPB") will be situated between the Chemin de l’Imperatrice and Building E on a sloping site in Ariana Park. Construction services are required to build a modern stepped six story reinforced concrete structured building with large glazed curtain wall system and accessible green roof terraces. The NPB will comply with environmental standards and achieve Leadership in Energy and Environmental Design ("LEED"), LEED gold standards, or its equivalent.

Brief Description of Requirements: UNOG seeks qualified contractors to undertake works to construct the NPB, the construction services include but are not limited to:

i) Excavation; the main site excavation and soil relocation are excluded from the scope of construction services as they will already have been completed under a separate enabling works contract. However, under the construction services, the firm will be required to undertake only a superficial excavation of the main site of approximately 40 cm above nominal level for the majority of the basement level and then the necessary excavations for foundations, drainage, services connections, etc.

ii) Main Structure; reinforced concrete pad and raft foundations, service trenches and retaining walls, precast and in situ reinforced concrete thermal floor slabs, precast and in situ reinforced concrete beams and columns, timber glulam beams.

iii) Structural reinforcing and new opening to an existing underground parking structure.

iv) Façade; floor to floor unitized curtain wall façades consisting of an outer glazing layer, conditioned cavity with integrated blind system, and inner operable triple glazing.

v) Roof; including green planted roofs, parts of the roofs are accessible roof terraces.

vi) Architectural Finishes; high level of interior finishes, raised floors, carpet, suspended metal and plaster ceilings, ceramic wall tiles, glass, stainless steel, paint, stone, wood.

vii) Furniture, Fixtures and Equipment ("FFE"); internal furniture fittings and equipment, including installations (excluding loose furniture).

viii) Landscaping; soft and hard landscaping, including soil relocation.

ix) Mechanical, Electrical and Plumbing Construction ("MEP"); MEP services comprising the following; High/medium voltage supplies, low voltage supplies and associated equipment, interior and exterior lighting. HVAC services including variable air volume systems, chilled beams, supply and extract systems and associated piped services. Fire protection services sprinklers, fire alarm detection, smoke extraction. Extra low voltage services; Building Management Systems, access control, CCTV, public address, audio visual and IT systems structured cabling. Plumbing services including soil waste and vent pipework, rainwater pipework and drainage, hot and cold water services and hydrants.

x) Building Information Modeling ("BIM"): The firm shall provide a BIM manager as part of the key personnel.

xi) Testing, Commissioning, Handover, Training; The firm shall provide all Testing and Commissioning including Enhanced Commissioning as required by LEED in order to be able to achieve LEED certification at gold level, or its equivalent.

xii) Defects Liability and Warranty Works; necessary remedy concerning any equipment and material defects as required after the UN has occupied the New Permanent Building.

xiii) The firm shall undertake all necessary consultation and coordination with the applicable authorities.

SECTION II. PRE-QUALIFICATION PROCEDURE 1. Purpose of Prequalification As the first step of the solicitation process, UNOG will conduct a pre-qualification of firms who wish to participate in the solicitation. The pre-qualification phase contains the request for and the submission of the firm's Expression of Interest ("EOI") and the UNOG's assessment of the EOIs received, based on the described requirements and criteria in this document. The pre-qualification phase aims to obtain confirmation from firms of their interest and willingness to participate in the Request for Proposal (“RFP”) for these works and to provide UNOG all the necessary information to determine, whether or not to invite the firm to participate in the tender process, based on UNOG’s determination if the firm is suitably experienced, qualified to perform the scope of works and that it has the sufficient financial and resource capacity to undertake them. 2. Eligibility Criteria In order to be pre-qualified, a firm shall meet all the requirements set out in Section III and submit all of the requested documents in the format set out below. An EOI should be submitted by a firm who is able to demonstrate that they meet the criteria set out in Section III (“Prequalification Criteria”). A consortium (partnership or joint venture) can submit their EOI as one candidate. In this document the members of a consortium will be referred to as ‘firm’. A consortium shall indicate which member of the consortium will take the lead contracting role. The number of legal entities forming one consortium shall be limited to three (3). Firms can submit only one EOI, either independently or as part of a consortium. 3. Communications with UNOG UNOG is the contracting authority for this pre-qualification process and the associated RFP solicitation for the construction of the NPB in support of the SHP objectives. Communications in relation to this pre-qualification must only be made in writing to the designated email address shptenders@unog.ch. All communications must be sent to this email address. 4. Required submission of documents The firm shall complete all fields in the Statement of Qualifications Questionnaire (the “Questionnaire”), included as Attachment 1 to this document, and submit its responses and required supporting documents by midnight on 14 October 2016 via email to shptenders@unog.ch. All pages of the Questionnaire and all supporting documents must contain the firm's information, the signature of an authorized Official and the date of signature. A firm who fails to provide the required documentation, fails to meet the Prequalification Criteria ("PQC") or does not respond to all of the criteria in the Questionnaire will be determined to fail the Prequalification Phase and will not be invited to participate in the RFP solicitation. 5. Evaluation The firms will be evaluated on the basis of the pre-established PQC outlined in Section III. An assessment of whether each and all of the following PQC are met will be conducted by the UNOG and the evaluation will be on a pass/fail basis. Failure to meet any of the PQC, failure to provide the required documentation, and failure to respond to all of the criteria in the Questionnaire will result in the firm not being invited to the RFP. Firms that have passed the evaluation will receive the RFP, which is envisaged to be issued in November 2016, as per the indicative schedule outlined in Section V. 6. Governing conditions of this EOI By submitting the EOI, the firm agrees to the content and the procedure of this pre-qualification process. Furthermore, the firm also declares, if selected, to submit a proposal on time and to have sufficient capacity to do so. UNOG provides the firms the opportunity to request clarification on the requirements of the PQC described in Section III. Only questions submitted in writing by 26 September 2016 via email to shptenders@unog.ch will be processed by UNOG, and answered in writing to all participating firms. During the whole of the subsequent RFP solicitation process, the firms must continue to meet all PQC requirements as defined in this Request for Expression of Interest ("REOI"). If this is not the case, the firm should report this immediately to UNOG who may decide to exclude the firm concerned. The firms have no right of any kind of compensation for participating in this Request for EOI or the subsequent RFP tender. UNOG has the right to temporarily interrupt or stop the RFP tender and to start a new RFP tender. UNOG is not obliged to award a contract at the end of the RFP tender process. 7. Non-Mandatory Information Session Firms are invited to a non-mandatory information session, which will take place on 22 September 2016 in UNOG´s offices. Firms can participate via VTC or conference call dial-in. Details on the exact time, location and technical information will be provided to all firms who have indicated interest to participate in such conference by 19 September 2016 in writing to shptenders@unog.ch. The session is intended to provide interested firms with the opportunity to visit the site where the construction of the NPB will take place and it will also provide non-binding information on this REOI and subsequent RFP solicitation. Any firm that wishes to participate will receive have to complete and submit a Non-Disclosure Agreement, which will be sent to the firm by email upon their written confirmation of interest to participate. If a firm does not wish to participate in the session via an authorized representative of its legal entity or, in case of a consortium, one of its members, it will not impact its evaluation process in any way or form. The non-mandatory information session is for information purposes only and the evaluation of this REOI will be solely conducted based on the submitted Questionnaire and all associated documents pursuant to the pre-established PQC outlined in Section III. SECTION III. PREQUALIFICATION CRITERIA (“PQC”) 1. The firm or any of its member(s), in case of a consortium, must not be involved in any bankruptcy proceedings, sequestration or any analogous situation arising from a similar procedure provided for in law. 2. The firm or any of its member(s) in case of a consortium must not be subject of a judgment for fraud, corruption or any other illegal activity. 3. The firm or any of its member(s), in case of a consortium shall not have had a contract terminated for cause or default in the last three years or have been disqualified by any public agency from being awarded a contract. 4. The firm or any of its member(s), in case of a consortium, shall confirm that it is able to provide a bank guarantee amounting up to CHF 12 Million. 5. The firm or any of its member(s), in case of a consortium, shall confirm that it is able to provide a bid bond securing its bid in the amount of up to CHF 50'000. 6. The firm or any of its member(s), in case of a consortium, shall confirm that its key personnel responsible for the project are fluent in written and spoken English. The firm shall confirm that a BIM Manager shall be part of the key personel team provided for the project. 7. The firm or any of its member(s), in case of a consortium, shall provide evidence that it is registered as a contractor for construction works. 8. Annual Turnover: The firm shall have an average annual turnover of at least CHF 200 million per annum in construction works over the past three years. Audited/certified financial statements or tax returns for the past three years are to be provided. For members of a consortium, each individual member must have a minimum average annual turnover of 50 million CHF per annum over the past three years and all members of the consortium must have an average annual turnover of at least CHF 200 million in construction works over the past three years. 9. Relevant Experience: The firm shall provide information on three reference projects which have been recently completed (within the last five years), or which are in progress, which are relevant to this REOI. In case of a consortium, the reference projects may relate to any of its members. For a reference project to be considered relevant, four of the following seven minimum characteristics must be met for each of the three projects: i. Multi-story, minimum three-stories, concrete building structure with integral heating / cooling systems; ii. Office building with high-end finishes of 15,000 square meters minimum open office space with modular furniture, partitions, and contemporary data and power distribution system; iii. Conference / meeting rooms with contemporary audio visual systems; iv. Façade composed of full floor height curtain walls 4,000 square meters minimum; v. Planted green roofs requiring specialized water-proofing; vi. LEED, BREAAM, Minergie, or similar green building certification level of LEED NC ‘Silver’ (or comparable level) or higher; vii. Use of Building Information Management (BIM). Firms shall provide each reference project on a separate document, maximum of 2 pages per project. Additional references will not be considered. 10. Health, Safety and Environmental protection matters. The firm or any of its member(s) in case of a consortium, shall provide evidence of its respective applicable health, safety and environmental certifications obtained, if any, in compliance with applicable regulations. 11. Quality Assurance. The firm or any of its member(s), in case of a consortium, shall provide a quality management system certification, which must be valid for at least 12 months from the date of the submission of the EOI. 12. The firm or any of its member(s), in case of a consortium, shall confirm that it has the capacity to meet the target dates to submit a proposal and to complete the construction works in the summary provisional timeline outlined in Section V below. 13. The firm or any of its member(s), in case of a consortium, shall be registered as a minimum in the Basic level in United Nations Global Market ("UNGM") to be invited to the RFP solicitation. The firm or any of its member(s), in case of a consortium shall be registered at Level 2 in UNGM to be eligible for contract award. SECTION IV. TENDERING PHASE The pre-qualified firms will receive the RFP for the above-referenced construction tender for the New Permanent Building. In the RFP, the Scope of Works, the applicable model contract and the envisaged time schedule will be outlined, as well as the requirements each respective proposal has to meet. The deliverables expected from candidates during the tendering phase include, but are not limited to: i. Cost proposal, bill of quantities, and cash flow for the project execution; ii. Method Statement describing the approach to mobilization, construction, testing and commissioning, handover, and demobilization and rectification of defects; iii. Project time schedule describing approach to mobilization, construction, testing and commissioning, handover, and demobilization using critical path method approach and scheduling software; iv. Approach to Health, Safety and Environmental protection; v. Approach to Quality Control and Quality Assurance; vi. List of potential subcontractors and vendors; vii. Confirmation of acceptance of the model contract based on FIDIC Red Book. V. TENTATIVE SCHEDULE The RFP solicitation is tentatively scheduled as follows (the schedule may be amended by UNOG): Main Activities Date Request for Expression of Interest (REOI) issued by UNOG 26 August 2016 Non-Mandatory EOI Information Session 22 September 2016 Submission by firms of questions on the REOI 26 September 2016 Submission by firms of their Expression of Interest (EOI) 14 October 2016 Invitation to Request for Proposal (RFP) First half of November 2016 Submission Deadline for Proposals by the firms for the RFP Mid-January 2017 Contract Award Mid-May 2017 Start of Construction works Mid-June 2017 Completion of New Permanent Building latest by November 2019

Construction of WWTP and PSs in Lang Son

Lang Son Water Supply and Sewerage JSC | Published March 29, 2017  -  Deadline June 5, 2017
cpvs
90420000

CPV:  90420000 - Sewage treatment services

Construction of WWTP and PSs in Son La

Son La Urban Services and Environment Joint Stock Company | Published March 29, 2017  -  Deadline May 31, 2017
cpvs
90420000

CPV:  90420000 - Sewage treatment services

Construction of WWTP and PSs in Hoa Binh

Hoa Binh Project Management Unit Hoa Binh City People’s Committee | Published March 29, 2017  -  Deadline June 2, 2017
cpvs
90420000

CPV:  90420000 - Sewage treatment services

UW-Hönggerberg Renovation, construction works

ewz Elektrizitätswerk der Stadt Zürich Services Projekteinkauf, SEP | Published May 19, 2017  -  Deadline July 7, 2017
cpvs
45200000

CPV: 45200000 - Complete or partial construction work in building construction and civil engineering work

QUOTE: + New facade dismantling existing facade

Aubert Architectes SA, à l'attention de M. Margot Ruffieux | Published December 20, 2016  -  Deadline February 6, 2017
cpvs
45000000

CPV: 45000000 - Construction work
Code of construction costs (CFCs) 215 - Lightweight Prefabricated