Public tenders for construction in Estavayer-le-lac Switzerland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!
ConstructionSwitzerlandestavayer-le-lac

N01.08 130065 - PUN Villars-Ste-Croix - Cossonay - Civil engineering and metal construction - Lot 101 (ID 4504)

Office fédéral des routes - Infrastructure routière Ouest Filiale Estavayer-le-Lac | Published May 12, 2017  -  Deadline July 7, 2017
cpvs
45000000

CPV: 45000000 - Construction work,
45233110 - Highway construction work

Construction work for communication lines

Office fédéral des routes — infrastructure routière filiale Estavayer-le-Lac | Published June 17, 2015  -  Deadline July 22, 2015
cpvs
45231600

Under the RCOM renewal project for the cantons of Vaud and Fribourg, two sections require installing new batteries for electric tubes. - The first is located on the N09 road between Lake Viaduct Viaduct Chillon and the Rhône Plain over a length of approximately 1300 m. The work includes: - the construction of a battery of 9 120/132 PE coated concrete on 1300 m (270 m on the emergency lane and 1030 m in the embankment highway board). - Performing electrical room type A2. - The second is located to the right of Yverdon-Sud interchange on N01-N05 in the direction of Neuchâtel over a length of about 550 m. The work includes: - the construction of a battery of 6 120/132 PE coated concrete of 550 m in the embankment highway edge. - Performing electrical rooms Type A1, A2 and S2.

N05.64 080142 - Upn.Colombier - Cornaux - Battery Construction BSA and technical rooms on section 7 (Neuchâtel-Maladière-St-Blaise)

Office fédéral des routes - Infrastructure routière Ouest Filiale Estavayer-le-Lac | Published November 3, 2016  -  Deadline September 22, 2016
cpvs

N05.64 080142 - Upn.Colombier - Cornaux - Battery Construction BSA and technical rooms on section 7 (Neuchâtel-Maladière-St-Blaise)

Construction work

Office fédéral des routes — infrastructure routière Ouest Estavayer-le-Lac | Published August 6, 2016  -  Deadline September 22, 2016
cpvs
45000000

- Tube banks of construction in urban areas,

- Tube banks built in covered trenches of No. 5,

- Construction of seven new technical rooms, underground and surface,

- Local adaptations of existing techniques and covered trenches,

- Renewal of the rooms in the BAU 5.

Main indicative amounts:

Sm2env clearing. 20,000.

BSA tubes about me. 80,000.

Rooms BSA env.110 pcs.

Length approx digs me. 8000.

Excavation (theoretical) m3env. 20,000.

road surfaces (option) TENV. 8000.

Dégrappage, milling m3env coatings. 6000.

Markings (interim and final) about me. 4000.

Sheet piling m2env. 2200.

Drilling me approx. 3200.

Prestressed anchors about me. 2500.

Strips of m2env seals. 4200.

Excavation m3env. 18,000.

M3env concrete. 4500.

Formwork m2env. 13,000.

kgenv frames. 500,000.

M2env insulation and paints. 12,000.

pcsenv doors. 65.

Construction work for communication lines

Office fédéral des routes — infrastructure routière filiale Estavayer-le-Lac | Published September 9, 2015
Winner
Colas Suisse SA, succursale de Crissier
cpvs
45231600

Réf. réseaux FO + RCOM F1 — travaux de GC pour construction batteries de tubes.

Construction work

Office fédéral des routes — Infrastructure routière Ouest — Filiale Estavayer-le-Lac | Published November 4, 2016
Winner
S. Facchinetti SA
cpvs
45000000

N05.64 080142 - UPN. Colombier - Cornaux - Battery BSA building and technical rooms on Section 7 (Neuchâtel Saint-Blaise-Maladière).

Works for complete or part construction and civil engineering work

Office fédéral des routes — infrastructure routière filiale Estavayer-le-Lac | Published July 3, 2015  -  Deadline July 24, 2015
cpvs
45200000

Conducting a site installation area, with the main features: - Surface 12 000 m2 to convert - 6000 m3 serious to implement - 4 500 t. asphalt - 1000 m3 of fill 400 ml fences Changing service access portals South tunnel portal Confignon - Demolition wall, gate, fence - wall construction - Cashing and coated - Search for mains.

Construction work

Office fédéral des routes — Infrastructure routière Ouest Filiale Estavayer-le-Lac | Published September 27, 2017  -  Deadline November 8, 2017
cpvs
45000000, 45442121

The mandate concerns civil engineering services for the protection of the tunnel "Les Vignes" and "de Combette" tunnels and the "Chantemerle" tunnel on the national road N01 towards Murten.

Work to be done:

- Cleaning / preparation of concrete surfaces with high pressure water 140,000 m²

- Applying a 17,000 m² "pore-filled" coating, a 59,000 m² paint and a hydrophobic impregnation 23,000 m²

- Cleaning of graffiti in different places and on different surfaces 1,950 m²

Work is planned between June and September 2018 and will last approximately 10 nights for each direction.

Detailed description: see draft contract.

The mandate concerns civil engineering services for the protection of the tunnel "Les Vignes" and "de Combette" tunnels and the "Chantemerle" tunnel on the national road N01 towards Murten.

Work to be done:

- Cleaning / preparation of concrete surfaces with high pressure water 140,000 m²

- Applying a 17,000 m² "pore-filled" coating, a 59,000 m² paint and a hydrophobic impregnation 23,000 m²

- Cleaning of graffiti in different places and on different surfaces 1,950 m²

Work is planned between June and September 2018 and will last approximately 10 nights for each direction.

Detailed description: see draft contract.

Construction work

Office fédéral des routes — Infrastructure routière Ouest — Filiale Estavayer-le-Lac | Published October 14, 2017  -  Deadline November 20, 2017
cpvs
45000000, 45233210

Repairs to bituminous mixes include the renewal of the tread and, where appropriate, the tie layer on the highway. Traffic count probes and meteorological probes will be replaced. The markings on the ground will be completely redone.

The rehabilitation consists of the following sections:

Junction of Vevey:

- Chaussée Lac - Ax N9 - km 26.556 to km 28.600 and km 29.200 to km 29.900,

- Chaussée Montagne - Ax N9 - km 26.557 to km 29.000,

- Cross-road Lake - Axis N9_VEYR - PR 100 to 122,

- Counter-road Mountain - Axis N9_VEYR - PR 200 to 224,

- Junction railings Vevey to the road of Hauteville,

- Ramp N12 - N9 direction Villeneuve on 400 m from the km 72.345.

Montreux - Villeneuve:

- Chaussée Lac - Ax N9 - km 35.245 to km 35.365 and km 37.500 to km 40.300,

- Chaussée Montagne - Ax N9 - km 35.245 to km 35.425 and km 37.500 to km 40.300.

Repairs to bituminous mixes include the renewal of the tread and, where appropriate, the tie layer on the highway. Traffic count probes and meteorological probes will be replaced. The markings on the ground will be completely redone.

The rehabilitation consists of the following sections:

Junction of Vevey:

- Chaussée Lac - Ax N9 - km 26.556 to km 28.600 and km 29.200 to km 29.900,

- Chaussée Montagne - Ax N9 - km 26.557 to km 29.000,

- Cross-road Lake - Axis N9_VEYR - PR 100 to 122,

- Counter-road Mountain - Axis N9_VEYR - PR 200 to 224,

- Junction railings Vevey to the road of Hauteville,

- Ramp N12 - N9 direction Villeneuve on 400 m from the km 72.345.

Montreux - Villeneuve:

- Chaussée Lac - Ax N9 - km 35.245 to km 35.365 and km 37.500 to km 40.300,

- Chaussée Montagne - Ax N9 - km 35.245 to km 35.425 and km 37.500 to km 40.300.

Construction work

Service de l'urbanisme et des bâtiments | Published April 26, 2017
Winner
Implenia Schweiz AG
cpvs
45000000

Call for tender for general contractor (EG) for the construction of the college of banks.

Motorway construction works

Office fédéral des routes — infrastructure routière Ouest Filiale Estavayer-le-Lac | Published May 11, 2017
Winner
Perrin Frères SA
cpvs
45233110

N01.08 080166 — ENG suppression goulet d'étr. Crissier — travaux de génie civil UeMa revêtements 2017 (ID 4375).

Construction of 3 school buildings

Patrick Minder Architectes / Dolci Architectes | Published September 29, 2017  -  Deadline July 20, 2017
cpvs

Construction of 3 school buildings

Construction of 3 school buildings

Patrick Minder Architectes / Dolci Architectes | Published September 29, 2017  -  Deadline July 13, 2017
cpvs

Construction of 3 school buildings

Works for complete or part construction and civil engineering work

Office fédéral des routes — infrastructure routière — filiale Estavayer-le-Lac | Published September 5, 2015
Winner
SCRASA SA
cpvs
45200000

N°1 UPN.Bernex — Ferney — construction de la zone d'installation de chantier pour les travaux liés au VOMA «liaisons inter-tubes de Confignon et Vernier».

Reservoir construction works

Groupement d'ingénieurs pour le réservoir de l'Asse (GIRA) PA RWB Hydroconcept SARL | Published February 14, 2015  -  Deadline March 10, 2015
cpvs
45247270

Construction of a water reservoir of 10,000 m3, equipped with a pumping station.

N01.12 080,317 - APB Colovrex Coppet - Lot GC for the construction of the wall and the noise dam (ID 3646).

Office fédéral des routes — infrastructure routière Ouest filiale Estavayer-le-Lac | Published March 4, 2016
Winner
Rampini et Cie SA
cpvs
45222000

N01.12 080317 — APB Colovrex-Coppet — Lot GC pour la construction de la paroi et de la digue anti-bruit (ID 3646).

Construction project management services

Office fédéral des routes — infrastructure routière Ouest filiale Estavayer-le-Lac | Published October 22, 2016  -  Deadline November 8, 2016
cpvs
71541000

The purpose of this tender is to commission a support office in the work of Master (BAMO). The attorney will have the following main tasks:

Roundabout construction work

Office fédéral des routes — infrastructure routière Ouest — filiale Estavayer-le-Lac | Published October 3, 2015  -  Deadline November 12, 2015
cpvs
45233128

Development work Vauseyon crossroads, with construction of a roundabout at various stages of a retaining wall and foundation for masts of contact lines of the trolleybus. The work will be an important day in traffic. Main indicative amounts: BSA tube battery: m approx. 1 450. Sewer: m approx. 220. Excavation (theoretical): m3 approx. 3 600. Borders: m approx. 1 700. Road surface: t approx. 4 750. Dégrappage / milling coating: m3 approx. 1 800 Vertical Formwork: m2. 220. Poles: kg approx. 14 000. Concrete: m3env. 110. Provisional Marking: m approx. 4 150. Final Marking: m approx. 2120.

Construction of a reservoir in Asse - Special Works

Groupement d'ingénieurs pour le Réservoir de l'Asse (GIRA), p.a. RWB Hydroconcept Sàrl | Published October 14, 2016  -  Deadline June 17, 2016
cpvs

Construction of a reservoir in Asse - Special Works

Construction work

Office fédéral des routes — infrastructure routière Ouest, filiale Estavayer-le-Lac | Published December 2, 2015  -  Deadline January 29, 2016
cpvs
45000000

The project involves the construction of a roundabout below the ramp to the motorway junction half Morat No. 29 West, at the intersection with the main road (axis No. 3400 Fribourg road network). The project includes: - the roundabout construction work, including demolition of the existing intersection islands, excavations and earthworks, civil works for the plot, adaptation of harvesting and disposal system of floor waters, adapting services and adaptation of the restraint systems. - The joint implementation of maintenance work (cleaning coatings and edges) on the main road of the Confederation property line. - The realization of an earth retaining structure army in connection with a local service road. - Work signaling and marking. One of the main challenges lies in carrying out the work at the intersection of a highway characterized by a high traffic load (almost 20,000 vehicles / day) and motorway access which must be maintained in all circumstances.