Works for complete or part construction and civil engineering work

Matterhorn Gotthard Infrastruktur AG | Published December 13, 2016  -  Deadline February 3, 2017

When advertised job is Baumeisterarbeiten in connection with the proposed bridge repair of Walnut viaduct. The entrance to the viaduct is about existing access road, and a construction road already created possible.

Train operation is not set during the entire construction period, except for a 4-week road closures for installation of new roadway trough. The costs associated with the current rail operations and night work difficulties (installations, waiting times, overhead lines under power, etc.) are, unless otherwise stated, be included in unit prices.

Work during the transport operation must be performed always under the supervision of a security guard. MGBahn establishes a Zugswarnanlage which is the contractor throughout the construction period and will be operated by this.

Electricity and hot water are if not specifically mentioned does not exist and by the company to independently ...

Works for complete or part construction and civil engineering work

Matterhorn Gotthard Infrastruktur AG | Published January 20, 2017  -  Deadline February 28, 2017

MGBahn intends a new crossing point in difficulty ern km 26,700 - 27,019 km to create a total length of 319 m. The usable length of the intersection is approximately 186 m. The construction of the intersection of the existing railway track will be renewed on the section. The renovation includes the total reconstruction of the roadway with Gleisober- and substructure, which expand and adapt the catenary system and the extension of the cable system with the creation of a new interlocking technology cabin.

The task of the architect includes any work up to and including the Vorschotterung incl. The demolition of the existing tracks (rails and sleepers) in the perimeter portion.

The work must be coordinated with the other departments (catenary and interlocking systems, traction power).

Construction of the line will be executed by a specialized track construction company.

The work of the architect must be coordinated through this with the work programs of the other performers. ...

Construction work

Departement für Verkehr, Bau und Umwelt Dienststelle für Straßen, Verkehr und Flussbau Kreis 1 – Oberwallis | Published December 7, 2016  -  Deadline February 23, 2017

Main quantities:

Facades / Scaffolding 300 m 2

Falsework: for bridge length 270 m, max. Height 74.4 m

Caster scaffolding: for consoles 550 m

Raceways (3 levels): 270 m

Nail walls shotcrete 1 600m 2

Tension free armature (300 pcs.): 2 000m

Wrap anchor (6 pcs.): 90 m

Holes for drainage: 650 m

Epoxy resin sealing: 2 650 m 2

Waterproofing PBD: 2 650 m 2

Excavation, removal loose material: 3 200 m 3

Rock Excavation 4 900 m 3

Hedge fuses: 750 m 2

Riprap, Justify: 700 t

Up / backfills 4 300m 3

Foundation layers: 800 m 3

Rolled asphalt: 200 t

Mastic asphalt: 620 t

Street Drainage: 400 m

Formwork: 9700 m 3

Reinforcements: 690 t

Situ 4 300m 3

Prestressing cable (2 750 m): 83 t.

Bypass Stalden, Section 3.8, bridge Chinegga

Departement für Verkehr, Bau und Umwelt Dienststelle für Strassen, Verkehr und Flussbau Kreis 1 - Oberwallis | Published December 2, 2016  -  Deadline February 23, 2017
CPV: 45000000 - Construction,
45221111 - Road bridge construction

Spare Getwingbrücke GGB, Stahlbauarbeiten

Gornergradbahn AG Einkauf und Materialwirtschaft | Published January 20, 2017  -  Deadline March 3, 2017
CPV: 45234100 - Construction work for railways

Repair Walnut Viaduct

Matterhorn Gotthard Infrastruktur AG | Published December 8, 2016  -  Deadline February 3, 2017
CPV: 45200000 - Works for complete or part construction and civil engineering work

Intersection Schwiering ern

Matterhorn Gotthard Infrastruktur AG | Published January 18, 2017  -  Deadline February 28, 2017
CPV: 45200000 - Works for complete or part construction and civil engineering work

Extension 4 schoolroom mezzanine schoolhouse South - Schulanlage Glis, Napoleon 8, 3902 Glis

Stadtgemeinde Brig-Glis, Abteilung Liegenschaften | Published December 9, 2016  -  Deadline January 27, 2017
CPV: 45214210 - Construction of Primary Schools
Construction costs plan number (BKP): 2152 - Facade
Standard items catalog (NPK): 344 - Facade
  • 1