Call +44 800 9755 164

Public tenders for construction in Bolligen Switzerland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Expansion Bahnhof Bern RBS, subproject 1: construction section 1 Los 1.2 measures PostParc

Regionalverkehr Bern-Solothurn RBS / Abteilung Infrastruktur | Published November 15, 2016  -  Deadline February 9, 2017
CPV: 45112000 - Excavating and earthmoving work,
45221200 - Construction work for tunnels, shafts and subways,
45223210 - Structural steelworks,
45111000 - Demolition, site preparation and clearance work,
45221000 - Construction work for bridges and tunnels, shafts and subways,
45221230 - shafts,
45221247 - tunneling works,
45223500 - reinforced concrete structures,
45232450 - Construction work for drainage systems,
45262426 - Production of piles,
45262600 - Miscellaneous special trade construction works
Standard items catalog (NPK): 112 - tests,
121 - Secure, venture, strengthen and move,
132 - Drilling and cutting concrete and masonry,
151 - Construction work for plant managers,
171 - Poles,
237 - sewerage and drainage systems,
241 - situ concrete,
246 - clamping systems,
263 - Machine-assisted tunneling in rock MUF,
264 - Machine-assisted tunneling in soft ground MUL,
266 - outbreak fuses in underground construction,
267 - Bauhilfsmassnahmen in underground construction,

Expansion Bahnhof Bern RBS, subproject 1: construction section 3 2.1 Los Deckelbau Eilgutareal

Regionalverkehr Bern-Solothurn RBS / Abteilung Infrastruktur | Published November 15, 2016  -  Deadline January 12, 2017
CPV: 45112000 - Excavating and earthmoving work,
45221200 - Construction work for tunnels, shafts and subways,
45232000 - Ancillary works for pipelines and cables,
45234000 - Construction work for railways and cable transport systems
45262310 - reinforced concrete work,
45262426 - Production of piles,
45262620 - retaining walls
Standard items catalog (NPK): 112 - tests,
117 - crashes and dismantlement,
132 - Drilling and cutting concrete and masonry,
151 - Construction work for plant managers,
162 - excavation accounts and stiffeners,
164 - anchorages and nail walls,
171 - Poles,
172 - Waterproofing of Structures below ground and for bridges,
211 - excavation and earthworks,
223 - covering work,
225 - track construction, interlocking-outdoor and switch heaters,
237 - sewerage and drainage systems,
241 - situ concrete,
321 - Montagebau in steel,
411 - utility lines for water and gas

Expansion Bahnhof Bern RBS, subproject 1: construction section 6 Los 3.6 gain Schanze Tunnel Part 1

Regionalverkehr Bern-Solothurn RBS / Abteilung Infrastruktur | Published November 11, 2016  -  Deadline December 1, 2016
CPV: 45221248 - tunnel lining work,
45223100 - assembly of metal structures,
45223210 - Structural steelworks,
45262300 - Concrete work,
45262600 - Miscellaneous special trade construction works
45221240 - Construction work for tunnels
Standard items catalog (NPK): 117 - crashes and dismantlement,
121 - Save As catch, strengthen and move

Excavating and earthmoving work

Regionalverkehr Bern-Solothurn RBS / Abteilung Infrastruktur | Published November 18, 2016  -  Deadline February 9, 2017

Today RBS Station Bern is overloaded, which is why a new underground station system should be created.

With the Los 1.2 parts of measures to ensure the structural safety and serviceability of PostParc Reiter construction under the project are executed expansion Bahnhof Bern RBS.

The blowout preventer is done with steel arches and shotcrete.

When working, the existing gauges and circulation areas are to ensure the platform area.

On the other hand allows the logistics manhole concreting from the Schanzenbrücke.

Also the logistics bay can be used for connecting the construction site during the day.

Detailed description of tasks according Submission documents.

Today RBS Station Bern is overloaded, which is why a new underground station system should be created.

With the Los 1.2 parts of measures to ensure the structural safety and serviceability of PostParc Reiter construction under the project are executed expansion Bahnhof Bern RBS.

The blowout preventer is done with steel arches and shotcrete.

When working, the existing gauges and circulation areas are to ensure the platform area.

On the other hand allows the logistics manhole concreting from the Schanzenbrücke.

Also the logistics bay can be used for connecting the construction site during the day.

Detailed description of tasks according Submission documents.

Excavating and earthmoving work

Regionalverkehr Bern-Solothurn RBS / Abteilung Infrastruktur | Published November 18, 2016  -  Deadline January 12, 2017

The Los 2.1 includes the creation of a pit statements for the future these constructions in section 3 Eilgutareal. In addition to the excavation completion of the lid of the open pit bulk mining also is created in stages, so that the operational requirements of the overlying track field can be met. The building extends over a length of about 150 m long and 11.5 m wide. The front portion towards the station widens to about 27 m wide. The lid is on a Kote of 538.50 m. ü. M. (with cross slope). The excavation report consists of an overlapping bored pile wall. The diameter of the piles is 1.30m and the stakes rise with a maximum length of about 24 m to 2 m below the bottom plate of the future tunnel. The reinforced piles are at a distance between 2 m and 2.3 m. On the piles of cover is supported, which must be created on the basis of the maximum possible track closures of sidings in 3 stages. The re-routing of wires, cables and overhead line in the track field of Abstellanlage done partly before construction of civil engineering works as well as between the different stages.

Detailed description of tasks according Submission documents.

  • 1