Call +44 800 9755 164

Public tenders for construction in Bern Switzerland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Building construction work

Armasuisse Immobilien | Published December 2, 2016  -  Deadline January 27, 2017

Transformation of a kitchen company canteen, demolition of the soldier home and construction of a troop refectory.

CFC 4 Landscaping

Market Size: ~ 22,000 m 3 SIA (buildings).

Transformation of a kitchen company canteen, demolition of the soldier home and construction of a troop refectory.

CFC 4 Landscaping.

Market Size: ~ 22,000 m 3 SIA (buildings).

Construction work

Armasuisse Immobilien | Published November 25, 2016  -  Deadline January 30, 2017

Refer to the attached tender documents.

Architectural, construction, engineering and inspection services

armasuisse Einkauf und Kooperationen CC WTO | Published January 6, 2017  -  Deadline February 13, 2017
Dazu auch zählen mitunter Zugehörige Infrastruktur- und Flächenobjekte (Straßen und Plätze, Wald, Flussbau, Felssicherungen, Werkleitungen, Sicherheitsinstallationen Safety-Security). 

Der Auftrag ist in drei aufgeteilt Regionen:

BE)

Region 2: Ticino (TI)

Region 3: (. Aufgrund der Größe of deutschsprachigen Teils der Schweiz, wird die mindestens drei Region 3 in Subregionen aufgeteilt) deutschsprachiger Teil der Schweiz.

Wind: 3000 Stunden pro Jahr.

Works include infrastructure items and related area type objects (roads and squares, forests, water projects, secure rock walls, pipes and underground pipes, safety equipment Safety / Security).

The mandate is subdivided in the following three areas:

Region 1: Western Switzerland (French-speaking Switzerland VS, VD, GE, NE, French BE).

Region 2: Ticino (TI).

Region 3: German speaking part of Switzerland (given the size of the German-speaking part of Switzerland, the region will be divided into three sub-regions at least.)

Volume: 3,000 hours per year.

Works include infrastructure items and related area type objects (roads and squares, forests, water projects, secure rock walls, pipes and underground pipes, safety equipment Safety / Security).

The mandate is subdivided in the following three areas:

Region 1: Western Switzerland (French-speaking Switzerland VS, VD, GE, NE, French BE)

Region 2: Ticino (TI)

Region 3: German speaking part of Switzerland (given the size of the German-speaking part of Switzerland, the region will be divided into three sub-regions at least.)

Volume: 3,000 hours per year.

Architectural, construction, engineering and inspection services

Bundesamt für Bauten und Logistik (BBL) Projektmanagement Inland II | Published January 11, 2017  -  Deadline February 24, 2017

Treiber der vorliegenden Generalplaner Ausschreibung ist die Einführung der beschleunigten Asylverfahren und die neue daraus resultierende Notwendigkeitfür bzw. restrukturierte Bundesasylzentren.

Diese Gebäude und das zweite Bereiche bilden Teilprojekt of Projekts "Bundesasylzentrum Basel", dessen Ziel die Sanierung of bestehenden Asylzentrums und die Erweiterung um zusätzliche Arbeitsplätze erwàhnten am Standort ist.

Die Generalplanerleistungen umfassen die gemäß Teilleistungen Ordnung SIA LM 112 die Phasen 21, 31, 32, 33, 41, 53 und 51,52.

Die folgende Generalplanerleistungen umfassen Fachgebiete:

- BKP 291 Architekt (Federführung mit Generalplanerfunktion)

- BKP 292 Bauingenieur,

- BKP 293 Elektroingenieur,

- BKP 294 HLKK Ingenieur,

- BKP 295 Sanitàringenieur,

- BKP 298 Gebàudeautomationsingenieur (MSRL).

Die genauen Leistungsbeschreibungen sind zu dem Teil E_Pflichtenheft entnehmen.

This tender for a general planning team follows the introduction of accelerated asylum procedures and the increased need to build or renovate asylum centers that follows.

These buildings and areas represent the second stage of the project "Basel Centre for asylum seekers", which includes the renovation of the existing center and its extension to create additional working places on the site.

The expected overall planning benefits include benefits under the phases 21, 31, 32, 33, 41, 51, 52 and 53 defined in the SIA standard 112.

general planning deliverables are in the following fields:

- CFC 291 Architect (assuming the general planner function);

- CFC 292 Civil Engineer;

- CFC 293 Electrical engineer;

- CFC 294 Engineer HVACR;

- CFC 295 Engineer sanitation;

- CFC 298 technical management engineer building (MCRG);

Detailed descriptions of the services are in Part E, "Pflichtenheft".

This tender for a general planning team follows the introduction of accelerated asylum procedures and the increased need to build or renovate asylum centers that follows.

These buildings and areas represent the second stage of the project "Basel Centre for asylum seekers", which includes the renovation of the existing center and its extension to create additional working places on the site.

The expected overall planning benefits include benefits under the phases 21, 31, 32, 33, 41, 51, 52 and 53 defined in the SIA standard 112.

general planning deliverables are in the following fields:

- CFC 291 Architect (assuming the general planner function);

- CFC 292 Civil Engineer;

- CFC 293 Electrical engineer;

- CFC 294 Engineer HVACR;

- CFC 295 Engineer sanitation;

- CFC 298 technical management engineer building (MCRG);

Detailed descriptions of the services are in Part E, "Pflichtenheft".

Construction work

Fachstelle Beschaffungswesen Stadt Bern | Published December 9, 2016  -  Deadline January 31, 2017

The existing building (provisional) in winter Path 15 is completely dismantled, involving a Schadstoffsanierung.

In the same location, a 3-storey (incl. UG) Replacement construction is created.

In historical inventory buildings Brünnenstrasse 40 carried smaller reconstruction and rehabilitation of the heating system.

Construction work

Insel Gruppe, Inselspital, Universitätsspital Bern, Direktion Infrastruktur | Published December 14, 2016  -  Deadline January 25, 2017

North of intensive treatment, emergency and operation center (INO), the new building for the institution, the center is provided in the construction sector 6.1. In the construction sector, the first stage of the future master plan is to be implemented. This provides a complete urology, additional space to accommodate the outpatient clinics, the operational area and the bed leading stations (IMC and general wards) there. Due to necessary renovation work of the Women's Hospital neonatology, the maternity ward and the operating theater must be temporarily moved out of the building of the Women's Hospital. The new building can be used in a first stage as a changing position for the Women's Hospital. After the temporary use by the Women's Hospital, the building will be expanded to the organ center.

Construction work

SBB Immobilien Development Bahnproduktion | Published December 14, 2016  -  Deadline February 3, 2017

New conservation and Intervention Center (EIC) in the focus of development of the municipality of Ostermundigen,

New office building in energy standard,

1. + 2.Untergeschoss: Various stores, archives, equipment rooms and dressing rooms and equipment rooms,

Ground floor: workshops, storage and reception,

1 +. 2 Upper floor: office and meeting rooms, cafeteria,

3rd floor: barracks (residential) as well as ventilation station,

Construction: Walls and ceilings in reinforced concrete,

Compact perforated facade with 240 mm insulation and clinker facing. The flat roofs are extensively planted,

New outbuildings unheated,

Ground floor: goods receipt and garages,

Construction: steel construction, facade with metal panels and expanded metal, trapezoidal roof, hoist and crane to storage areas in 2.Untergeschoss,

Surroundings: Open storage and handling areas between remuneration and outbuildings, outdoor parking.

New conservation and Intervention Center (EIC) in the focus of development of the municipality of Ostermundigen,

New office building in energy standard,

1. + 2.Untergeschoss: Various stores, archives, equipment rooms and dressing rooms and equipment rooms,

Ground floor: workshops, storage and reception,

1 +. 2 Upper floor: office and meeting rooms, cafeteria,

3rd floor: barracks (residential) as well as ventilation station,

Construction: Walls and ceilings in reinforced concrete,

Compact perforated facade with 240 mm insulation and clinker facing. The flat roofs are extensively planted,

New outbuildings unheated,

Ground floor: goods receipt and garages,

Construction: steel construction, facade with metal panels and expanded metal, trapezoidal roof, hoist and crane to storage areas in 2.Untergeschoss,

Surroundings: Open storage and handling areas between remuneration and outbuildings, outside parking.

Construction work

Bundesamt für Bauten und Logistik (BBL) | Published December 6, 2016  -  Deadline January 27, 2017
Basement with garage for both stages and the surrounding area. 

60 million CHF.

The recommendations of KBOB leaflet "Building when a warmer climate" must be implemented.

BKP 221.8 skylight.

For this purpose, the corresponding benefits, you must:

RWA.

For the following components, a system guarantee is required by the owner:

- Façade construction 10 years old ...

Basement with garage for both stages and the surrounding area.

60 million CHF.

The recommendations of KBOB leaflet "Building when a warmer climate" must be implemented.

BKP 221.8 skylight.

For this purpose, the corresponding benefits, you must:

RWA.

For the following components, a system guarantee is required by the owner:

- Façade construction to 10 years:

Required water tightness and air tightness of windows, doors and facade elements,

(Form 5 must be signed and submitted)

Performance at Standard Minergie Eco® and GI® label.

Construction work

armasuisse Immobilien | Published December 20, 2016  -  Deadline February 1, 2017

The crew barracks I in Thun, which was completed in 1868, is structurally in poor condition, so that a total renovation of the building is imperative. The barracks is a national monument with correspondingly high historic preservation requirements.

In addition to the general repair the barracks at the same time adapted to the current needs of the troops, so that they can also be used in future as a military barracks.

The renovation is carried out in two stages and includes the following priorities:

- Restoration pitched and flat roofs;

- Restoration facades with renovation and reconstruction of natural and artificial stone games;

- Replacement of four existing sanitary towers by two new additions with sanitary facilities;

- Construction of an installation channel under the base plate;

- Renovation and reconstruction of the residence, personnel and office space;

- Installation of four new Gastro kitchens with infrastructure areas;

- Reconstruction Building forecourt, ...

BKP 213 Montagebau in steel.

BKP 214 Montagebau in wood.

BKP 221.4 Aluminium Windows loggias.

BKP 224.1 flat roof terrain and sanitary towers.

BKP 237 building automation.

BKP 421 Landscaping.

VS Stapfenackerstrasse, replacement construction and remodeling, Gerüstungen

Fachstelle Beschaffungswesen Stadt Bern | Published December 7, 2016  -  Deadline January 31, 2017
CPV: 45000000 - Construction work
Construction costs plan number (BKP): 2111 - Scaffolding

Architectural, construction, engineering and inspection services

Röm.-kath. Gesamtkirchgemeinde Bern und Umgebung, Verwaltung | Published December 8, 2016  -  Deadline February 13, 2017

The Roman Catholic parish total Bern Area would like to realize a new building a MFH with an average expansion rates on plot 743 in Jegenstorf. The building will serve both as an apartment building, as may be used on the ground floor also for sacred use (common rooms). The building should comply with the principles of the recommendation SIA 112/1 2004 "Sustainable Building Construction". The GEAK AA standard to be met.

For this task a Planergemeinschaft is wanted with general planning function.

Construction attorney general new press installation pit and pit cleaning facility in Zurich WUVB

Chemins de fer fédéraux suisses CFF Voyageurs P-OP-FSE-PTF-SEF | Published January 5, 2017  -  Deadline February 14, 2017
CPV: 71240000 - Architectural, engineering and planning
71320000 - Engineering design services

VS Stapfenackerstrasse, replacement construction and renovation, sewer rehabilitation

Fachstelle Beschaffungswesen Stadt Bern | Published December 7, 2016  -  Deadline January 31, 2017
CPV: 45232410 - Sewer Work
Construction costs plan number (BKP): 152 - sewer lines

Überbauung Sunnebode, construction sites C + D, 3076 Worb

Fachstelle öffentliches Beschaffungswesen der Burgergemeinde Bern p/A Domänenverwaltung | Published January 13, 2017  -  Deadline February 22, 2017
CPV: 45000000 - Construction work
Construction costs plan number (BKP): 421 - Gardening works

Construction work

Fachstelle Beschaffungswesen Stadt Bern | Published December 2, 2016  -  Deadline January 24, 2017

Spare existing Gastro kitchen, installation of a new cold room.

Construction work

Bundesamt für Bauten und Logistik (BBL) Projektmanagement Inland I | Published December 20, 2016  -  Deadline February 6, 2017

The Institute of Virology and Immunology (IVI) is the Swiss reference laboratory (Biosafety Level 4) for diagnosis, monitoring and control of highly contagious animal diseases. At the 1992 erected buildings several major maintenance and renovation measures are carried out in the coming years. In tendered subproject IB05 the existing administration building will be renovated and extended by a new building.

BKP 214 Montagebau in wood IB05 (RTP: new building).

For this purpose, the corresponding benefits, you must:

- NPK 331 rooms work: supporting structure,

- NPK 371 windows and patio doors.

The Institute of Virology and Immunology (IVI) is the Swiss reference laboratory (Biosafety Level 4) for diagnosis, monitoring and control of highly contagious animal diseases. At the 1992 buildings erected a number of major maintenance and renovation measures are carried out in the coming years. In tendered subproject IB05 the existing administration building will be renovated and extended by a new building.

BKP 214 Montagebau in wood IB05 (RTP: New)

For this purpose, the corresponding benefits, you must:

- NPK 331 rooms work: supporting structure,

- NPK 371 windows and patio doors.

(B1304-4) Construction of an office building (VWG) and maintenance existing VWG on the site of the Institute of Virology and Immunology (IVI) at the Sensemattstrasse in Mittelhäusern

Bundesamt für Bauten und Logistik (BBL) Projektmanagement Inland I | Published January 16, 2017  -  Deadline February 27, 2017
CPV: 45000000 - Construction work
Construction costs plan number (BKP): 2810 - Screeding
Standard items catalog (NPK): 661 - screeds floating or in combination

(B1304-3) Construction of an office building (VWG) and maintenance existing VWG on the site of the Institute of Virology and Immunology (IVI) at the Sensemattstrasse in Mittelhäusern

Bundesamt für Bauten und Logistik (BBL) Projektmanagement Inland I | Published December 16, 2016  -  Deadline February 6, 2017
CPV: 45000000 - Construction work
Construction costs plan number (BKP): 214 - Montagebau in wood
Standard items catalog (NPK): 331 - room work: supporting structure,
371 - windows and patio doors

Construction project management services

Stiftung Kunstmuseum Bern | Published December 16, 2016  -  Deadline February 3, 2017

The Kunstmuseum Bern (KMB) is a need for additional exhibit space, and the need for a restoration of listed buildings. The reconstruction measures required for this are carried out along with a comprehensive redesign of building. In recent years, the preliminary project "Modernization KMB" was elaborated to which must now promptly implement.

Under the present tendering an external overall project management is the KMB wanted that supports the internal project management of KMB in the purposeful implementation of the modernization KMB and advises, the operational management of the whole project takes, the competent committees adequately informed and brings about the necessary decisions in a timely manner.

(See. Also the detailed explanations in the tender documents).

Building construction work

Fachstelle Beschaffungswesen Stadt Bern | Published December 23, 2016  -  Deadline January 31, 2017

The listed Schulanlage VS Manuel 4 buildings is total renovated incl. Outdoor and extended with 2 new school buildings.

The execution is divided into stages according generellem Bauetappenplan GP from 21.04.2016.