Public tenders for construction in Bellinzona Switzerland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

N13 Tunnel Rofla SISTO - construction management Construction

Ufficio federale delle strade USTRA Filiale Bellinzona divisione Infrastruttura stradale, settore Supporto | Published May 18, 2017  -  Deadline August 18, 2017
cpvs
71520000

CPV: 71520000 - Management consultancy services,
71540000 - Construction Management Services

Construction work

Office fédéral des routes (OFROU), filiale de Bellinzone, division infrastructure routière Est | Published December 3, 2016  -  Deadline January 20, 2017
cpvs
45000000, 45233110

The project is divided into two areas: industry and Quinto Airolo sector.

Description of objects lot 211.

Under the "Lot 211 - Sector Client Laboratory Airolo, Specialised works" are to perform tests on materials for the work described in the parts of work (TP) following where the list of benefits is split:

Implementation of the new system of walls ...

The project is divided into two areas: industry and Quinto Airolo sector.

Description of objects lot 211.

Under the "Lot 211 - Sector Client Laboratory Airolo, Specialised works" are to perform tests on materials for the work described in the parts of work (TP) following where the list of benefits is split:

New routes of cable lines: demolition of all electrical rooms and junctions of cable routing lines, realization (existing building) NS line on the track and construction of the new track on the way SN (including vias) to Ritom the transformer station (km 102 + 400).

TP 02 - structures: Clean 2 bridges (borders, waterproofing, substitutions seals, coatings); sanitation and waterproofing of 4 small structures such as manholes and underpasses; off interventions maintenance 3 manholes; achieving new technical underpass for a length of 50 m.

TP 05 - Tunnels: expanding the tube SN Stalvedro tunnel, construction of new SOS niches / hydrants and purge niches, construction of the new cross-connection between the two tubes of Stalvedro tunnel, completion of the new north and south portals expanded SN tube , sanitation and coatings allowance sidewalks and NS tube pipes, construction of new SOS / hydrants NS tube niches, closure of existing SOS niches, allowance of the slab and coatings, construction of new walls against recirculation fume portals, preparation and decommissioning of existing technical facilities.

TP 07 - operating and safety equipment:

Technical Building sanitation Stalvedro rest area;

Technical Building Lisera sanitation;

New technical building Piotta: construction of a new building technique SEA at km 103 + 750.

Motorway construction works

Office fédéral des routes (OFROU) filiale de Bellinzone, division infrastructure routière Est | Published December 1, 2016  -  Deadline January 16, 2017
cpvs
45233110

The EP22 Campaccio project provides a comprehensive renovation of the route of the N2 national road in the territory of the municipality of Mendrisio between 8,200 km and 10,000.

The purpose of this tender sets the framework for contractual services "Laboratorio del Commitente" for achieving the in situ testing of materials and laboratory under construction.

Tests on the following materials are to achieve: (partial list):

- Mixed aggregates on tests,

- Bituminous materials on tests,

- Tests on mortar and concrete,

- Tests restraining barrier

- Etc.

Construction project management services

Ufficio federale delle strade USTRA — Filiale Bellinzona — Divisione infrastruttura stradale | Published December 7, 2016  -  Deadline February 10, 2017
cpvs
71541000

Gegenstand der Ausschreibung sind die Leistungen für die örtliche Bauleitung im wind Stunden von 10,200.

Diese umfasst:

- Chefbauleitung

- Fachbauleitung Kunstbauten

- Fachbauleitung Trassee

Die detailliertere Leistungsbeschreibung richtet sich nach dem Dokument ASTRA "Leistungsbeschreibung für die örtliche Bauleitung (OBL)."

Projekt:

Das muss Überführungsbauwerk neu erstellt werden.

Es sind folgende Arbeiten vorgesehen:

- Einrichten der Umfahrungsrouten;

- Neubau der Überführung inklusive Rampen und zum Zufahrten Industriequartier;

- Neubau eines der Kreisels östlich Überführung;

- Teilweise Neuerstellung Zizers Anschluss;

- Neubau eines der Linksabbiegestreifens westlich Überführung;

- Rückbau ...

Gegenstand der Ausschreibung sind die Leistungen für die örtliche Bauleitung im wind Stunden von 10,200.

Diese umfasst:

- Chefbauleitung;

- Fachbauleitung Kunstbauten;

- Fachbauleitung Trassee.

Die detailliertere Leistungsbeschreibung richtet sich nach dem Dokument ASTRA "Leistungsbeschreibung für die örtliche Bauleitung (OBL)."

Projekt:

Das muss Überführungsbauwerk neu erstellt werden.

Es sind folgende Arbeiten vorgesehen:

- Einrichten der Umfahrungsrouten;

- Neubau der Überführung inklusive Rampen und zum Zufahrten Industriequartier;

- Neubau eines der Kreisels östlich Überführung;

- Teilweise Neuerstellung Zizers Anschluss;

- Neubau eines der Linksabbiegestreifens westlich Überführung;

- Rückbau der bestehenden Bauwerke;

- Umfangreiche Anpassungsarbeiten.

Die Arbeiten unter erfolgen Betrieb (Nationalstrasse, SBB, RhB).

The tender covers local work towards benefits for a total of 10 "200 hours.

These benefits include:

- Chief Executive of work

- Construction management for engineering works

- Construction management for the plot

The detailed description of services complies with document FEDRO "Description of services for the local construction management (DLT)."

Project:

This crossing must be rebuilt.

The work planned are:

- Establishment of detour routes

- New construction of the overpass including ramps and access to the area ...

The tender covers local work towards benefits for a total of 10 "200 hours.

These benefits include:

- Chief Executive of work

- Construction management for engineering works

- Construction management for the plot

The detailed description of services complies with document FEDRO "Description of services for the local construction management (DLT)."

Project:

This crossing must be rebuilt.

The work planned are:

- Establishment of detour routes

- New construction of the overpass including ramps and access to the industrial zone

- New construction of a roundabout east overpass

- Partly new establishment of the joint Zizers

- New construction in the west of the overpass, a road to the left fork

- Demolition of existing structures

- Important works "adaptation.

Work will be performed without interruption of traffic (road, SBB, RhB).

Construction work

Ufficio federale delle strade USTRA — filiale Bellinzona — Divisione infrastruttura stradale, settore supporto | Published November 12, 2016
Winner
Consorzio Campagnola c/o Censi & Ferrari SA impresa costruzioni
cpvs
45000000, 45262321

Lot 1103a - fueling area Campagnola planning and control center of heavy traffic - Company construction and screed.

Construction work

Bundesamt für Straßen ASTRA Filiale Bellinzona Straßeninfrastruktur OST | Published February 11, 2016
Winner
ARGE SiBär c/o CSC Bauunternehmung AG
cpvs
45000000

N13 Tunnel de Bärenburg SISTO — lot 1. Lot principal «construction».

EP18 N13 Bypass Roveredo GR - Lot 4201, former Demolition N13 highway construction company to work

Ufficio federale delle strade USTRA Filiale Bellinzona divisione Infrastruttura stradale, settore Supporto | Published November 10, 2016  -  Deadline July 8, 2016
cpvs

EP18 N13 Bypass Roveredo GR - Lot 4201, former Demolition N13 highway construction company to work

Architectural, construction, engineering and inspection services

Infrastruttura, Progetti, Engineering, Accesso alla ferrovia ed edifici tecnici | Published October 18, 2017  -  Deadline December 5, 2017
cpvs
71000000

- - Inspection of central units according to the coordinated timetables of SBB.

- Verbal inspection

- Creation of photographic files

- Creation of the plan of measures

- Creation of an evaluation dossier with processing of the plan of measurements

- Risk management / realization

- Detailed statement of construction and technical situation in terms of fire protection and evacuation routes as a basis for planning measures

- Planning constructive design in the description of plans and measures (concept of protection

fire / escape routes, planning of measurements / execution with exact planimetry)

- Harmonization of measures with the fire police / cantonal real estate insurance

- Implementation of the implementation schedule

- Summary of measures

- Verification of tenders and tendering with SBB project management

- Supervision of works (realization)

- Verbal and documentation

- Test and delivery at the end of the work.

- Inspection of central units according to the coordinated timetables of SBB.

- Verbal inspection

- Creation of photographic files

- Creation of the plan of measures

- Creation of an evaluation dossier with processing of the plan of measurements

- Risk management / realization

- Detailed statement of construction and technical situation in terms of fire protection and evacuation routes as a basis for planning measures

- Planning constructive design in the description of plans and measures (concept of fire protection / escape routes, planning of measures / execution with exact planimetry)

- Harmonization of measures with the fire police / cantonal real estate insurance

- Implementation of the implementation schedule

- Summary of measures

- Verification of tenders and tendering with SBB project management

- Surveill ...

Construction work

Infrastruttura Progetti Direzione dei lavori, sicurezza e logistica | Published December 17, 2016  -  Deadline March 10, 2017
cpvs
45000000

The SBB Chiasso station ACE project and capacity expansion plans following the main work of civil engineering:

- Raising to P55 piers 1 and 2,

- New awnings standard Facelifting RV05 on platforms 1 and 2,

- New customs building,

- Renovation of the ramp and the stairs at the end of walkway under the main road,

- Access ramp to the dock 2 since the changeover lane road Dunant,

- Renovation of the paved infrastructure, new roads, drainage,

- Compliance interventions infrastructure passages under way,

- Line pylons foundations of contact and signaling concept,

- Infrastructure,

- Deconstructions.

The invitation to tender for the above mentioned main works and other works of lesser importance, such as reorganization and rehabilitation of infrastructure and the construction of new underpasses for road infrastructure and drainage.

Lot 1103a fueling area Landscaping Campagnola and Heavy Traffic Control Centre - Construction Business Works and screed

Ufficio federale delle strade USTRA Filiale Bellinzona divisione Infrastruttura stradale, settore Supporto | Published November 10, 2016  -  Deadline July 8, 2016
cpvs

Lot 1103a fueling area Landscaping Campagnola and Heavy Traffic Control Centre - Construction Business Works and screed

EP18 N13 Bypass Roveredo Lot 1103a fueling area Landscaping Campagnola and Heavy Traffic Control Centre - Corporate Construction and screed

Ufficio federale delle strade USTRA Filiale Bellinzona divisione Infrastruttura stradale, settore Supporto | Published June 21, 2016  -  Deadline July 8, 2016
cpvs

EP18 N13 Bypass Roveredo Lot 1103a fueling area Landscaping Campagnola and Heavy Traffic Control Centre - Corporate Construction and screed

Construction work

Office fédéral des routes (OFROU) Filiale de Bellinzone — Division infrastructure routière Est | Published April 6, 2017
Winner
Nuovolab SA
cpvs
45000000, 45233110

N2 Airolo-EP04 Quinto Lot 211 - the main route and tunnel works Airolo sector: 2017-18 master laboratory work.

Construction work

Infrastruttura, Progetti Direzione dei Lavori, Sicurezza e Logistica | Published October 12, 2016  -  Deadline November 25, 2016
cpvs
45000000

Realization of about 400 meters of retaining walls as part of the layout of the track, installation of noise panels (height 2.5 meters) on simple foundations; on bridges, extension (is) passable underpasses arteries Molinazzo Via and Via S. Paolo,

Construction work

Infrastruttura, Progetti Direzione dei Lavori, Sicurezza e Logistica | Published May 17, 2017  -  Deadline June 28, 2017
cpvs
45000000

Interventions on the track include the removal, transport, disposal, supply and implementation of all track superstructure equipment. Repair of the foundation and execution of the impermeable layer under the railway.

Main metrics:

- Cuttings, abductions, dismantling: 4000 m3

- Transport and laying of ballast: 600 m3

- Supply and installation of granular mixture 0-45: 800 m3

- Tar AC RAIL: 2700 m2

- Asphalt paving: 900 m2

- Supply and installation of crushed rock 8-16 mm: 300 m3

- Supply and installation of drainage gravel: 500 m3

- Filling with excavation materials: 600 m3

- Drainage pipes DN 200: 700 m

- Installation of cable ducts T23: 545 m

- Supply and installation of drainage inspection wells: 15 x

- Installation of cable chambers: 22 x

- Concrete for foundations LC (approx. 25 x): 65 m3

- Foundations for signals (4 x): 15 m3

- Foundations for candelabra (26 x): 18 m3.

Construction work

Office fédéral des routes OFROU, Filiale de Bellinzone, Division Infrastructure routière Est | Published October 21, 2017  -  Deadline November 27, 2017
cpvs
45000000

Voir point 4.5 «Autres indications».

Construction project management services

Ufficio federale delle strade USTRA Filiale Bellinzona, divisione Infrastruttura stradale, settore Supporto | Published March 22, 2017  -  Deadline May 12, 2017
cpvs
71541000

Gegenstand der Ausschreibung sind die Leistungen für die örtliche Bauleitung im wind Stunden von 4000.

Diese umfasst:

- Chefbauleitung;

- Örtliche Bauleitung.

Die detailliertere Leistungsbeschreibung richtet sich nach dem Dokument ASTRA "Leistungsbeschreibung für die örtliche Bauleitung (OBL)."

Projekt:

Auf der Nationalstrasse N13 ergeben sich immer wieder Probleme, wenn die wegen San Bernardino Route Schneefällen, Tunnelsperrungen oder der infolge Zollabfertigung in Chiasso für den Schwerverkehr gesperrt werden muss.

Künftig darf nur noch in dieser Platz Notfällen genutzt werden.

Entsprechend hat das nach Bundesamt für Verkehr ASTRA Alternativen gesucht.

Gemäss einer durch das ASTRA umfassenden Standortevaluation in Zusammenarbeit mit dem Kanton ...

Gegenstand der Ausschreibung sind die Leistungen für die örtliche Bauleitung im wind Stunden von 4000.

Diese umfasst:

- CHefbauleitung;

- Örtliche Bauleitung.

Die detailliertere Leistungsbeschreibung richtet sich nach dem Dokument ASTRA "Leistungsbeschreibung für die örtliche Bauleitung (OBL)."

Projekt:

Auf der Nationalstrasse N13 ergeben sich immer wieder Probleme, wenn die wegen San Bernardino Route Schneefällen, Tunnelsperrungen infolge oder der Zollabfertigung in Chiasso für den Schwerverkehr gesperrt werden muss.

Künftig darf nur noch in dieser Platz Notfällen genutzt werden.

Entsprechend hat das nach Bundesamt für Verkehr ASTRA Alternativen gesucht.

Gemäss einer durch das ASTRA umfassenden Standortevaluation in Zusammenarbeit mit dem Kanton ...

The invitation to tender for the construction management services located up to 4000 hours.

He understands:

- Chief Construction Manager

- Localized Site management.

The detailed description of the benefits is based on the document OFROU "Description of benefits for the local site management."

Project:

National road problems constantly encountered on the N13 when the San Bernardino road will be closed to heavy vehicles due to snowfall closures tunnels or for clearance to Chiasso.

Until now, camped could park on the area Obere Au in Chur. In the future, this area must be used in case of emergencies.

The Federal Transport Office FEDRO therefore sought alternatives.

According to a broad assessment of the situation ...

Motorway construction works

Office fédéral des routes (OFROU), filiale de Bellinzone, division infrastructure routière Est | Published December 7, 2016  -  Deadline January 18, 2017
cpvs
45233110

Description générale du projet EP18 Balerna:

Le projet dénommé « EP 18 Balerna » couvre les opérations d'entretien et de transformation à prévoir le long de l'autoroute N02 (au Tessin) entre la frontière Suisse-Italie (km 0.100) et le km 6.357 (culée sud du Viadotto della Tana) dans la commune de Mendrisio.

Description détaillée du projet EP18 Balerna, recherches complémentaires, laboratoire:

L'appel d'offres comprend les prestations suivantes:

Prélèvement d'échantillons y compris la remise en état des zones de sondage

— Prélèvement de carottes dans le béton, diamètre 50 mm / 100 mm

— Prélèvement de matériaux dans la superstructure routière par le biais de carottes diamètre 300 mm

— Prélèvement de matériaux dans l'infrastructure routière par le biais d'excavations de sondage

Détermination de l'état, y compris remise en état des zones de prélèvement:

— Épaisseur de l'enrobage

— Profondeur de carbonatation

— Scléromètre

— Évaluation de l'adhérence et de l'état de l'étanchéité

— Relevé ...

Description générale du projet EP18 Balerna:

Le projet dénommé « EP 18 Balerna » couvre les opérations d'entretien et de transformation à prévoir le long de l'autoroute N02 (au Tessin) entre la frontière Suisse-Italie (km 0.100) et le km 6.357 (culée sud du Viadotto della Tana) dans la commune de Mendrisio.

Description détaillée du projet EP18 Balerna, recherches complémentaires, laboratoire:

L'appel d'offres comprend les prestations suivantes:

Prélèvement d'échantillons y compris la remise en état des zones de sondage

— Prélèvement de carottes dans le béton, diamètre 50 mm / 100 mm

— Prélèvement de matériaux dans la superstructure routière par le biais de carottes diamètre 300 mm

— Prélèvement de matériaux dans l'infrastructure routière par le biais d'excavations de sondage

Détermination de l'état, y compris remise en état des zones de prélèvement:

— Épaisseur de l'enrobage

— Profondeur de carbonatation

— Scléromètre

— Évaluation de l'adhérence et de l'état de l'étanchéité

— Relevé vidéo des caissons

Essais de laboratoire sur le béton

— Réasistance à la compression (SN EN 12 390-3/SIA 262.253 e SN EN 12 504-1/SIA 262.213)

— Masse volumique (EN 12390-7)

— Module d'élasticité (SIA 262/1 app. G)

— Perméabilité à l'eau (SIA 262/1 app. A)

— Carbonatation (SIA 262/1)

— Teneurs en chlorures (SIA 262/496)

Essais de laboratoire sur terrains et couches de fondation

— Granulométrie (SN EN 670 902-1/SN EN 933-1)

— Limites de consistance (SN 670 345)

— Essais de cisaillement direct (SN 670 340-10)

— Coefficient CBR (SN 670 330-47)

— Coefficient CBR avec immersion des échantillons dans l'eau (SN 670 330-47)

— Coefficient CBR_F après dégèl (SN 670 321)

— Proctor Standard (SN 670 330-2/EN 13 286-2).

Motorway construction works

Office fédéral des routes (OFROU) Filiale de Bellinzone Division Infrastructure Routière Est | Published May 11, 2017
Winner
Nuovolab SA
cpvs
45233110

N2 EP22 Campaccio - lot 003, project owner's laboratory.

Construction work

Infrastruktur, Projekte, Projektorganisation Nord-Süd Achse Gotthard | Published November 24, 2015  -  Deadline February 24, 2016
cpvs
45000000

Le présent appel d'offre les travaux englobe principaux du projet. Ces travaux seront réalisés presque sans recours exclusivement à des machines de chantier sur rails. Il s'agit pour l'essentiel des travaux suivants: - mur de protection, - nettoyage de La Voute et de la maçonnerie, - remise en état de La Voute (maçonnerie et coques en béton PROJETE existantes, drains) - remplacement de la maçonnerie au niveau of parements ("maçonnerie Neuve", y compris drainage)), - adaptation et construction neuve de Niches pour la Protection des personnes, - reprise en sous-œuvre de La Voute, - you abaissement radier et nouvelle infrastructure, - nouveaux longitudinaux drains, - préballastage, - nettoyage et remise en état des murs de portail et des murs en Ailes. Quantités principales: Nettoyage de La Voute / maçonnerie, 3300 m2 (nettoyage par hydrodémolition). Remise en état de la maçonnerie, 200 m2 (assainissement the joints, injection dans les fissures, plombs). Coques en béton PROJETE, 1000 m2. Havage de maçonnerie, 800 m2. Drainage de La Voute / drains, 100 unités. Ancrages temporaires, 750 unités. Maçonnerie Neuve, 2300 m2 (of Deux Côtes sur toute la longueur du Tunnel). Adaptation of the Niches, 6 unités. Construction de nouvelles Niches, 12 unités. Canalisations d'évacuation des eaux, 1500 m '. Chambres de drainage, 40 unités. Déblais (radier), 1,400 m3 (fixed). Déblais (radier), 2500 m3 (fixed). Déblai / du élimination ballast usagé 2700 m3. Plate-forme de roche, 950 m '(longueur des voies). Plate-forme en matériau meuble, 250, m '(longueur des voies) ..

Construction project management services

Office fédéral des routes OFROU, filiale de Bellinzone, division infrastructure routière | Published July 15, 2015  -  Deadline September 4, 2015
cpvs
71541000

The "N13 EP 02 Mesocco" interested the route of N13 highway in the canton of Grison between km 24 400 and 29 800 in the territory of the municipalities of Soazza and Mesocco. The southern boundary at 24 400 km corresponds to subchannel Campagna Soazza, while the northern limit at 29 800 km corresponds to the northern abutment of the bridge Quadinei. Providing support to the principal subject of this tender, regarding support to the principal in the development of the bases of the project, in shopping, in economic management and in quality management and in coaching Technical project. In particular are the provision of support provided from the AP project until complete performance of the work (implementation project phases AP, AP + Publication, retail project DP MK intervention concept, MP intervention project , choice of attorneys' work management (DLL) "Tender S, implementation / execution. Planned start of business on 18.12.2015. For details see the documentation of services. Total Overall number of hours provided mandate for the purpose of this tender female hares: - DP / MP design, tendering procedure (S) and for the construction phase (B) and the implementation of the assistance (MA) that will be needed to the project "SPB", - construction (B) and implementation of the assistance (MA) that will be needed for the "SPC" project - AP design, publishing process (P), DP / MP design, procedure award (S) and for the construction phase (B) and the implementation of the assistance (MA), which will be required for the "SPD" project, for a detailed description of benefits see CFR. documentation. Total aggregate number of hours provided in this tender: 46,600.