Call +44 800 9755 164

Public tenders for construction in Bellinzona Switzerland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

Office fédéral des routes (OFROU), filiale de Bellinzone, division infrastructure routière Est | Published December 3, 2016  -  Deadline January 20, 2017
The project is divided into two areas: industry and Quinto Airolo sector. 

Description of objects lot 211.

Under the "Lot 211 - Sector Client Laboratory Airolo, Specialised works" are to perform tests on materials for the work described in the parts of work (TP) following where the list of benefits is split:

Implementation of the new system of walls ...

The project is divided into two areas: industry and Quinto Airolo sector.

Description of objects lot 211.

Under the "Lot 211 - Sector Client Laboratory Airolo, Specialised works" are to perform tests on materials for the work described in the parts of work (TP) following where the list of benefits is split:

New routes of cable lines: demolition of all electrical rooms and junctions of cable routing lines, realization (existing building) NS line on the track and construction of the new track on the way SN (including vias) to Ritom the transformer station (km 102 + 400).

TP 02 - structures: Clean 2 bridges (borders, waterproofing, substitutions seals, coatings); sanitation and waterproofing of 4 small structures such as manholes and underpasses; off interventions maintenance 3 manholes; achieving new technical underpass for a length of 50 m.

TP 05 - Tunnels: expanding the tube SN Stalvedro tunnel, construction of new SOS niches / hydrants and purge niches, construction of the new cross-connection between the two tubes of Stalvedro tunnel, completion of the new north and south portals expanded SN tube , sanitation and coatings allowance sidewalks and NS tube pipes, construction of new SOS / hydrants NS tube niches, closure of existing SOS niches, allowance of the slab and coatings, construction of new walls against recirculation fume portals, preparation and decommissioning of existing technical facilities.

TP 07 - operating and safety equipment:

Technical Building sanitation Stalvedro rest area;

Technical Building Lisera sanitation;

New technical building Piotta: construction of a new building technique SEA at km 103 + 750.

Construction project management services

Ufficio federale delle strade USTRA — Filiale Bellinzona — Divisione infrastruttura stradale | Published December 7, 2016  -  Deadline February 10, 2017

Gegenstand der Ausschreibung sind die Leistungen für die örtliche Bauleitung im wind Stunden von 10,200.

Diese umfasst:

- Chefbauleitung

- Fachbauleitung Kunstbauten

- Fachbauleitung Trassee

Die detailliertere Leistungsbeschreibung richtet sich nach dem Dokument ASTRA "Leistungsbeschreibung für die örtliche Bauleitung (OBL)."

Projekt:

Das muss Überführungsbauwerk neu erstellt werden.

Es sind folgende Arbeiten vorgesehen:

- Einrichten der Umfahrungsrouten;

- Neubau der Überführung inklusive Rampen und zum Zufahrten Industriequartier;

- Neubau eines der Kreisels östlich Überführung;

- Teilweise Neuerstellung Zizers Anschluss;

- Neubau eines der Linksabbiegestreifens westlich Überführung;

- Rückbau ...

Gegenstand der Ausschreibung sind die Leistungen für die örtliche Bauleitung im wind Stunden von 10,200.

Diese umfasst:

- Chefbauleitung;

- Fachbauleitung Kunstbauten;

- Fachbauleitung Trassee.

Die detailliertere Leistungsbeschreibung richtet sich nach dem Dokument ASTRA "Leistungsbeschreibung für die örtliche Bauleitung (OBL)."

Projekt:

Das muss Überführungsbauwerk neu erstellt werden.

Es sind folgende Arbeiten vorgesehen:

- Einrichten der Umfahrungsrouten;

- Neubau der Überführung inklusive Rampen und zum Zufahrten Industriequartier;

- Neubau eines der Kreisels östlich Überführung;

- Teilweise Neuerstellung Zizers Anschluss;

- Neubau eines der Linksabbiegestreifens westlich Überführung;

- Rückbau der bestehenden Bauwerke;

- Umfangreiche Anpassungsarbeiten.

Die Arbeiten unter erfolgen Betrieb (Nationalstrasse, SBB, RhB).

The tender covers local work towards benefits for a total of 10 "200 hours.

These benefits include:

- Chief Executive of work

- Construction management for engineering works

- Construction management for the plot

The detailed description of services complies with document FEDRO "Description of services for the local construction management (DLT)."

Project:

This crossing must be rebuilt.

The work planned are:

- Establishment of detour routes

- New construction of the overpass including ramps and access to the area ...

The tender covers local work towards benefits for a total of 10 "200 hours.

These benefits include:

- Chief Executive of work

- Construction management for engineering works

- Construction management for the plot

The detailed description of services complies with document FEDRO "Description of services for the local construction management (DLT)."

Project:

This crossing must be rebuilt.

The work planned are:

- Establishment of detour routes

- New construction of the overpass including ramps and access to the industrial zone

- New construction of a roundabout east overpass

- Partly new establishment of the joint Zizers

- New construction in the west of the overpass, a road to the left fork

- Demolition of existing structures

- Important works "adaptation.

Work will be performed without interruption of traffic (road, SBB, RhB).

Construction work

Infrastruttura, Progetti Direzione dei lavori, sicurezza e logistica | Published October 29, 2016  -  Deadline January 20, 2017
Building new foundations for contact line masts, fixing profiles for ballast restraint system, cable laying gutters, repair of the border M2 and M3 platforms, extension of M3 quay extension level, road railway paving and traditional.

Construction work

Infrastruttura Progetti Direzione dei lavori, sicurezza e logistica | Published December 17, 2016  -  Deadline March 10, 2017

The SBB Chiasso station ACE project and capacity expansion plans following the main work of civil engineering:

- Raising to P55 piers 1 and 2,

- New awnings standard Facelifting RV05 on platforms 1 and 2,

- New customs building,

- Renovation of the ramp and the stairs at the end of walkway under the main road,

- Access ramp to the dock 2 since the changeover lane road Dunant,

- Renovation of the paved infrastructure, new roads, drainage,

- Compliance interventions infrastructure passages under way,

- Line pylons foundations of contact and signaling concept,

- Infrastructure,

- Deconstructions.

The invitation to tender for the above mentioned main works and other works of lesser importance, such as reorganization and rehabilitation of infrastructure and the construction of new underpasses for road infrastructure and drainage.

AS N13 transverse link Untervaz - Zizers, construction management for project phases SIA 41, 52, 53

Ufficio federale delle strade USTRA Filiale Bellinzona divisione Infrastruttura stradale | Published December 2, 2016  -  Deadline February 10, 2017
CPV: 71541000 - Construction project management services

N13 AS cross connection Untervaz - Zizers, construction management for the SIA project phases 41, 52, 53

Ufficio federale delle strade USTRA Filiale Bellinzona divisione Infrastruttura stradale | Published December 2, 2016  -  Deadline February 10, 2017
CPV: 71541000 - Construction project management services

N13 tunnel Crapteig SISTO - Lot 1, main lot construction

Ufficio federale delle strade USTRA Filiale Bellinzona divisione Infrastruttura stradale, settore Supporto | Published August 26, 2016  -  Deadline January 27, 2017
As part of the increase in tunnel safety, the Federal Roads Office in 2018 intended - 2022 escape Departures for the tunnel Crapteig create. Components of the project "N13 safety tunnel Tunnel Crapteig" are the construction of the security lug (Sisto) incl. Cross-links and connections to the tunnel, the creation of the portal stations north and south, the central center and the connecting tunnels and the new headquarters premises for the BSA / ventilation of tunnels. 
Not included in the project are rehabilitation measures in the tunnel, the creation of the fire water supply incl. Hydrant line, the drawing in of transit lines and equipping of additional headquarters premises. Not part of this announcement is the equipment of Sisto and Portal stations with the BSA facilities.
The Sisto Crapteig consists of the walk Sisto, eight interconnections (QV) of the tunnel, a new headquarters center, which via a connecting tunnel directly to the existing central Mitte (CMI) is connected, and the portal stops south and north. The Sisto axis located approximately 26 m east of the tunnel axis, the distance to the portals increases towards. The Portal stations include the lock and various technical areas. Additionally, spaces for the supply of the tunnel Crapteig are created, which form combined with the Buildings Sisto rooms. From portal to portal Sisto measures 2'036 m (excl. QV).
This call includes the following approximate quantities and services.

WORKING AT DAY:
Outbreak firmly in the rock about 40,000 m3
Outbreak laid in loose rock about 700 m3
-Spritzbeton 7'000 m3
Anchors approximately 9,000 St.

WORKS ON DAY:
Cleardown rock about 450 m3
-Aushub Loose rock about 5,100 m3
-Bewehrung 140 t
-Ortbeton Approximately 920 m3
-Schutznetze Against rockfall about 170 m.

Construction work

Ufficio federale delle strade Ustra Filiale Bellinzona divisione Infrastruttura stradale, settore Supporto | Published August 31, 2016  -  Deadline January 27, 2017
170 m. 

N2 Airolo-EP04 Quinto Lot 211 - the main route and tunnel works sector Airolo client Laboratory 2017-18

Office fédéral des routes (OFROU) Filiale de Bellinzone Division Infrastructure routière Est | Published December 1, 2016  -  Deadline January 20, 2017
CPV: 45000000 - Construction work,
45233110 - Construction work for highways

South tested Giubiasco - Phase C - Main Works

Infrastruttura, Progetti Direzione dei lavori, sicurezza e logistica | Published October 28, 2016  -  Deadline January 20, 2017
CPV: 45000000 - Travaux de construction

SBB Chiasso station - ACE Chiasso and increased capacity main works

Infrastruttura Progetti Direzione dei lavori, sicurezza e logistica | Published December 14, 2016  -  Deadline March 10, 2017
CPV: 45000000 - Travaux de construction

Maintenance planning F5 major inspections (construction + BSA) tunnels and galleries N13 and N28, Kt. Graubünden / 2017-2021

Bundesamt für Strassen ASTRA Filiale Bellinzona Strasseninfrastruktur Ost | Published January 17, 2017  -  Deadline February 28, 2017
CPV: 71300000 - Engineering services

N2 Airolo EP04-Fifth Lot 211 - main track works and galleries sector Airolo: Laboratory purchaser 2017-18

Ufficio federale delle strade USTRA Filiale Bellinzona Divisione Infrastruttura Stradale Est | Published December 1, 2016  -  Deadline January 20, 2017
CPV: 45000000 - Construction work,
45233110 - Construction work for highways

Surveillance and security systems and devices

Bundesamt für Straßen ASTRA Filiale Bellinzona Straßeninfrastruktur Ost | Published December 24, 2016  -  Deadline February 14, 2017

Replacement of the profile measuring system in Unterrealta and the new acquisition of a profile measuring system for the under construction space in San Vittore. The two plants are being published in parallel, but staggered implemented (Unterrealta 2017 San Vittore ca. 2018).

The procurement includes the following supplies and services:

- 2 profile measuring systems for vehicle measurement (length, width, height) of SR 941,201 (METAS Certified);

- 2 measuring workstations including measuring software and the graphical user interface;.

- 12 Auswertearbeitsplätze including evaluation;.

- 2 remote displays (big screen) for flow control;

- 1 central database;

- Interfaces to third party systems (HVF beacons, weighing, brake tester, etc.) for the acquisition of data and measurement results;

- Export of statistical data (option);

- Services (detailed design, supply, installation, IBS, calibration, training, etc.);

-. Services during the warranty period, including preventive maintenance with calibration.

  • 1