Call +44 800 9755 164

Public tenders for construction in Bellinzona Switzerland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction project management services

Ufficio federale delle strade USTRA Filiale Bellinzona, divisione Infrastruttura stradale, settore Supporto | Published March 22, 2017  -  Deadline May 12, 2017
cpvs
71541000

Gegenstand der Ausschreibung sind die Leistungen für die örtliche Bauleitung im wind Stunden von 4000.

Diese umfasst:

- Chefbauleitung;

- Örtliche Bauleitung.

Die detailliertere Leistungsbeschreibung richtet sich nach dem Dokument ASTRA "Leistungsbeschreibung für die örtliche Bauleitung (OBL)."

Projekt:

Auf der Nationalstrasse N13 ergeben sich immer wieder Probleme, wenn die wegen San Bernardino Route Schneefällen, Tunnelsperrungen oder der infolge Zollabfertigung in Chiasso für den Schwerverkehr gesperrt werden muss.

Künftig darf nur noch in dieser Platz Notfällen genutzt werden.

Entsprechend hat das nach Bundesamt für Verkehr ASTRA Alternativen gesucht.

Gemäss einer durch das ASTRA umfassenden Standortevaluation in Zusammenarbeit mit dem Kanton ...

Gegenstand der Ausschreibung sind die Leistungen für die örtliche Bauleitung im wind Stunden von 4000.

Diese umfasst:

- CHefbauleitung;

- Örtliche Bauleitung.

Die detailliertere Leistungsbeschreibung richtet sich nach dem Dokument ASTRA "Leistungsbeschreibung für die örtliche Bauleitung (OBL)."

Projekt:

Auf der Nationalstrasse N13 ergeben sich immer wieder Probleme, wenn die wegen San Bernardino Route Schneefällen, Tunnelsperrungen infolge oder der Zollabfertigung in Chiasso für den Schwerverkehr gesperrt werden muss.

Künftig darf nur noch in dieser Platz Notfällen genutzt werden.

Entsprechend hat das nach Bundesamt für Verkehr ASTRA Alternativen gesucht.

Gemäss einer durch das ASTRA umfassenden Standortevaluation in Zusammenarbeit mit dem Kanton ...

The invitation to tender for the construction management services located up to 4000 hours.

He understands:

- Chief Construction Manager

- Localized Site management.

The detailed description of the benefits is based on the document OFROU "Description of benefits for the local site management."

Project:

National road problems constantly encountered on the N13 when the San Bernardino road will be closed to heavy vehicles due to snowfall closures tunnels or for clearance to Chiasso.

Until now, camped could park on the area Obere Au in Chur. In the future, this area must be used in case of emergencies.

The Federal Transport Office FEDRO therefore sought alternatives.

According to a broad assessment of the situation ...

Construction project management services

Ufficio federale delle strade USTRA Filiale Bellinzona, divisione Infrastruttura stradale settore Supporto | Published March 22, 2017  -  Deadline May 30, 2017
cpvs
71541000

Allgemeine Unterstützung im Bauherrn of genannten Projekt (Allgemeine Unterstützung sowie der Unterstützung bei der Erarbeitung Projektgrundlagen, im Beschaffungswesen, beim Controlling, projektgestützten beim Qualitätsmanagement und bei der Begleitung fachlichen of Projekts).

Für den detaillierten Leistungsbeschrieb siehe Unterlagen.

Ausgeschriebene Anzahl Stunden:

Projektleiter / BHU 4650 Std.

ProjektleiterStv./BHU Stv. 4650 Std.

Oberbauleiter 5000 Std.

Oberbauleiter Stv. 5000 Std.

Controlling 1800 Std.

Administration 1750 Std.

General support to the Client within the framework of the mentioned project (general support and support for the development of the bases of the project, for purchases, control activities, management of project quality and specialized project support ).

See disclosure for detailed description of benefits.

Number of hours put in the contest:

Project manager / support the client with 4650 hours

Project manager / support for the alternate client 4650 hours

Director General of work 5 000 hours

Chief alternate work 5000 hours

Controlling 1800 hours

Administration 1750 hours.

Road construction works

Ufficio federale delle strade USTRA Filiale Bellinzona settore Supporto | Published February 22, 2017  -  Deadline March 30, 2017
cpvs
45233120

The scheduled work includes the replacement decking on the N13 terminal Nufenen and Splügen connection.

The surfacing work and the work on the edge of financial statements and the manhole covers are made exclusively at night.

Ausgeschriebene main amounts:

Coverings mill 65 000 m 2 ;

SAMI: 65 000 m 2 ;

SDA 8-12 (thickness 40 mm): 6 500 tons;

Renewal cast cover 30 Stk.

N13 tunnel Rofla SISTO - lot 1 main lot construction

Ufficio federale delle strade USTRA Filiale Bellinzona settore Supporto | Published February 24, 2017  -  Deadline July 7, 2017
cpvs
45000000

CPV: 45000000 - Construction work

Construction work

Ufficio federale delle strade USTRA Filiale Bellinzona settore Supporto | Published March 1, 2017  -  Deadline July 7, 2017
cpvs
45000000

As part of the increase in tunnel safety, the Federal Office for Roads in 2018 intends - 2022 escape Departures for the tunnel Rofla create. Part of the project "N13 safety tunnel Tunnel Rofla" are the construction of the security lug (Sisto) incl. Cross-links and connections to the tunnel, the creation of the Portal Station North, the New Central South (underground), the ventilation and access tunnels as well as the central rooms for BSA / ventilation of Sisto / tunnel.

Not part of this announcement is the equipment of Sisto and Portal stations with the BSA facilities.

The Sisto Rofla consists of the walk Sisto, six cross-connections to the tunnel and a portal station in the north and a new headquarters (underground) to the south. The distance of QV each averages about 163 m. Following the new headquarters follows a ventilation tunnels (underground), which in the existing service duct (WELK) opens.

At the south end of the ...

Engineering services

Office fédéral des routes (OFROU), Filiale de Bellinzone, Division infrastructure routière Est | Published March 25, 2017  -  Deadline May 3, 2017
cpvs
71300000

Competition for the provision of civil engineering work of major arts related EP 04 Airolo- Quinto project. One for sanitation work of art (Ponte Out 1, Out 2 and Ponte Ponte sul Ticino Quinto) for 15.2 Moi construction amount. CHF. Purpose of the competition are the benefits of Phase 51 (executive project) to 53 (commissioning, documentation and archiving). They are also asked specialists and multidisciplinary services. It excludes works of electromechanical equipment (BSA) will be part of another competition.

There are provided 11,600 hours.

Data transfer:

For the resumption of project data is provided to board remuneration with strawberry offer for this contest, up to 10 000 CHF (excluding VAT). The recovery data will not be paid when the agent is the same office the previous phases.

MP Control:

Also for the MP check is provided a regulated compensation with strawberry ...

N13 truck restraint Real at Unterrealta, construction management for the SIA project phases 52 + 53

Ufficio federale delle strade USTRA Filiale Bellinzona, divisione Infrastruttura stradale, settore Supporto | Published March 17, 2017  -  Deadline May 12, 2017
cpvs
71541000

CPV: 71541000 - Construction project management services

N13 tunnel Crapteig SISTO - Geological construction supervision of the owner in advance

Ufficio federale delle strade USTRA Filiale Bellinzona settore Supporto | Published March 14, 2017  -  Deadline May 12, 2017
cpvs
71300000

CPV: 71300000 - Engineering services

N13 holding area for trucks Unterrealta, construction management for project phases SIA 52 + 53

Ufficio federale delle strade USTRA Filiale Bellinzona, divisione Infrastruttura stradale, settore Supporto | Published March 17, 2017  -  Deadline May 12, 2017
cpvs
71541000

CPV: 71541000 - Construction project management services

Engineering services

Ufficio federale delle strade USTRA Filiale Bellinzona settore Supporto | Published March 17, 2017  -  Deadline May 12, 2017
cpvs
71300000

2036 m und wird durch mit dem 8 Querverbindungen bestehenden Tunnel verbunden.

Die SISTO-Achse liegt der rund 26 Meter östlich Tunnelachse, wobei der Abstand hin zu den Portalen zunimmt.

Im Rahmen of vorliegenden Projekts werden der SISTO, die Querverbindungen, ein Verbindungsstollen zwischen der neuen und der Zentrale bestehenden Mitte, Portalstationen (mit und technischen Schleusen Räumen) sowie Räume für die Versorgung Tunnels erstellt.

Die geologische Baubegleitung of Bauherrn ist für die im Vortrieb fachtechnische Begleitung und der Dokumentierung Bauarbeiten bezüglich der Geology zuständig.

Dies beinhaltet folgende Hauptpositionen:

- Geologische Begleitung und Aufnahmen / Dokumentationen im Vortrieb (Annahme: ca. Aufnahme eine alle Tunnelmeter 15-20) und in den Voreinschnitten,

- Erstellung eines Geologischen ...

The safety tunnel will be approximately 2036 m long and will connect to the existing tunnel by 8 crosslinks.

The gap increases with portals.

As part of this project, the safety tunnel, the cross-links, a connecting gallery between the new Central Centre and the main existing Centre, portals of the tunnel (with lock and technical rooms) and the documents required for tunnel of the supply must be developed.

Geological accompaniment of the site to the client in advance is responsible for the technical support and the literature of the construction work in the field of geology.

Its mandate includes the following key positions:

- Support ...

The safety tunnel will be about 2'036 m long and will connect to the existing tunnel by 8 crosslinks.

The gap increases with portals.

As part of this project, the safety tunnel, the cross-links, a connecting gallery between the new Central Centre and the main existing Centre, portals of the tunnel (with lock and technical rooms) and the documents required for tunnel of the supply must be developed.

Geological accompaniment of the site to the client in advance is responsible for the technical support and the literature of the construction work in the field of geology.

Its mandate includes the following key positions:

- Support ...

N13 lining remediation Nufenen - Splügen

Ufficio federale delle strade USTRA Filiale Bellinzona settore Supporto | Published February 17, 2017  -  Deadline March 30, 2017
cpvs
45233120

CPV: 45233120 - Road construction

N13 EP11 AS Avers - Bärenburg - AS Zillis, Construction Management and Construction Management

Ufficio federale delle strade USTRA Filiale Bellinzona, divisione Infrastruttura stradale settore Supporto | Published March 17, 2017  -  Deadline May 30, 2017
cpvs
71541000

CPV: 71541000 - Construction project management services

N13 EP18 Circonvallazione Grono - Lot 5202 New bridge Moesa Roveredo, from manufacturer impresario works

Ufficio federale delle strade USTRA Filiale Bellinzona settore Supporto | Published February 24, 2017  -  Deadline April 18, 2017
cpvs
45000000

CPV: 45000000 - Construction work,
45221111 - Construction work for road bridges

N13 EP11 AS Avers - Bärenburg - AS Zillis, support the developer and general management of work

Ufficio federale delle strade USTRA Filiale Bellinzona, divisione Infrastruttura stradale settore Supporto | Published March 17, 2017  -  Deadline May 30, 2017
cpvs
71541000

CPV: 71541000 - Construction project management services
  • 1