Call +44 800 9755 164

Public tenders for construction in Burlington Canada

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Warren Brook Bridge Replacement – Cape Breton Highlands National Park, Parks Canada

Parks Canada | Published November 6, 2015
Winner
Dexter Construction Co. Ltd
cpvs

The project is located at the Warren Brook Bridge located approximately 11.7 kms north of Ingonish Park Headquarters. The project involves construction of a new 23 meter long bridge with concrete deck and girders, steel railings, concrete abutments with steel H piles, concrete wingwalls and armourstone protection. Approximately 650 meters of roadway will be realigned to accommodate the new structure. This project also involves demolition of the existing structure. The contractor shall complete the work by October 31, 2016. The estimated cost for this opportunity is within the following cost category: $1,000,000 to $2,000,000 (HST extra).

North Aspy Bridge Replacement – Cape Breton Highlands National Park, Parks Canada

Parks Canada | Published November 6, 2015
Winner
Alva Construction Ltd
cpvs

The project is located at the North Aspy Bridge located approximately 55.4 kms from Ingonish Park Headquarters. The project involves construction of a new 42 meter long bridge with concrete deck and steel I-beam girders, steel railings, concrete abutments with steel pipe piles, concrete wingwalls and armourstone protection. Approximately 220 meters of roadway will be realigned to accommodate the new structure. This project also involves demolition of the existing structure. The contractor shall complete the work by October 31, 2016. The estimated cost for this opportunity is within the following cost category: $3,000,000 to $4,000,000 (HST extra).

Activity Centre Extension and Building Modifications – Terra Nova NP- Parks Canada

Parks Canada | Published October 6, 2015
Winner
Traytown Builders Ltd
cpvs

This project includes construction services for an extension and internal modifications to the Activity Centre located in the Newman Sound Campground. Modifications include but not limited to floor plan modifications, interior modifications and building façade improvements. There will be a site visit on Friday, September 11th, 2015 at 10:00am. Bidders are asked to meet at the Administration Building in TNNP. Take exit for Newman Sound Campground of TCH. Continue 200m and the Administration Building is on your left. The contractor shall complete the work by March 15, 2016. The estimated cost for this opportunity is within the following cost category: $100,000 to $300,000 (HST extra).
  • 1