Public tenders for bridge in Romania

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Bridge construction work

Caras-Severin County Council | Published May 20, 2016
cpvs
45221110

Bridge construction work

Bridge construction work

Caras-Severin County Council | Published July 15, 2015  -  Deadline September 14, 2015
cpvs
45221110

Bridge construction work

Bridge over the Nera river, border crossing point, connection road to DN57A.

Caras-Severin County Council | Published February 26, 2016  -  Deadline May 5, 2016
cpvs
45221110

The contract is going to be awarded to successful tenderer in order for Contracting Authority to be able to construct bridge over the Nera River, on the DN 57A route at km 25 + 530 and bridge ramp and border crossing point. The bridge will have a length of 79,13,m. Carriageway width is 7,80 m with sidewalks of 1,50 m. Detailed information can be found in the technical design and the entire related documentation.

Execution works for investment objectives (Bridge over the Nera River, border crossing point, connection road to DN57A).

Caras-Severin County Council | Published February 21, 2015  -  Deadline April 29, 2015
cpvs
45221110

This contract is going to be awarded to successful tenderer in order for Contracting Authority to be able to construct bridge over the Nera River, on the DN 57A route at km 25 + 530 and bridge ramp and border crossing point. The bridge with the length of 79.13 m have 3 spans of 21 m and will be made from prefabricated prestressed beams simply supported. The 3 spans of the bridge rests on two abutments and two concrete pillars with elevations founded on drilled columns. The bridge is in alignment and in long profile the bridge ramps are connected vertically with a circular curve of radius R = 1 300 m, respectively 1 600 m. In long profile the bridge ramps have a slope of 4 %. Carriageway width is 7.80 m with sidewalks of 1.50 m.

Execution works for investment objectives (Bridge over the Nera river, border crossing point, connection road to DN57A).

Caras-Severin County Council | Published September 25, 2015  -  Deadline November 26, 2015
cpvs
45221110

The contract is going to be awarded to successful tenderer in order for Contracting Authority to be able to construct bridge over the Nera River, on the DN 57A route at km 25 + 530 and bridge ramp and border crossing point. The bridge will have a length of 79,13 m. Carriageway width is 7,80 m with sidewalks of 1,50 m. Detailed information can be found in the technical design attached.

Execution works for investment objectives (Bridge over the Nera river, border crossing point, connection road to DN57A).

Caras-Severin County Council | Published July 10, 2015  -  Deadline September 10, 2015
cpvs
45221110

The contract is going to be awarded to successful tenderer in order for Contracting Authority to be able to construct bridge over the Nera River, on the DN 57A route at km 25 + 530 and bridge ramp and border crossing point. The bridge will have a length of 79,13 m. Carriageway width is 7,80 m with sidewalks of 1,50 m. Detailed information can be found in the technical design attached.

Execution works for investment objectives (Bridge over the Nera river, border crossing point, connection road to DN57A).

Caras-Severin County Council | Published May 2, 2015  -  Deadline July 6, 2015
cpvs
45221110

The contract is going to be awarded to successful tenderer in order for Contracting Authority to be able to construct bridge over the Nera River, on the DN 57A route at km 25 + 530 and bridge ramp and border crossing point. The bridge will have a length of 79.13 m. Carriageway width is 7.80 m with sidewalks of 1.50 m. Detailed information can be found in the technical design attached.

Road bridge construction work

Municipiul Bacau | Published April 23, 2013  -  Deadline May 9, 2013
cpvs
45221111, 45231400, 45232150, 45232411, 45233120

Road bridge construction work

Road bridge construction work

Municipiul Bacau | Published April 23, 2013  -  Deadline April 22, 2013
cpvs
45221111, 45231400, 45232150, 45232411, 45233120

Road bridge construction work

Road bridge construction work

Consiliul Judetean Prahova | Published April 26, 2013  -  Deadline May 29, 2013
cpvs
45221111, 45231000

Road bridge construction work

Bridge construction work

Judetul Cluj (Consiliul Judetean) | Published January 24, 2013  -  Deadline January 30, 2013
cpvs
44212100, 44212120, 45221110

Bridge construction work

road bridge construction work

Municipiul Bacau | Published April 27, 2012  -  Deadline May 2, 2012
cpvs
45221111, 45231400, 45232411, 45233120, 45233128

road bridge construction work

road bridge construction work

Compania Nationala de Autostrazi si Drumuri Nationale SA | Published May 5, 2012  -  Deadline May 22, 2012
cpvs
45221111, 71322500, 71356200

road bridge construction work

Road bridge construction work

Municipiul Bacau | Published April 20, 2012  -  Deadline April 30, 2012
cpvs
45221111, 45231400, 45232411, 45233120, 45233128

Road bridge construction work

road bridge construction work

Municipiul Bacau | Published April 20, 2012  -  Deadline April 30, 2012
cpvs
45221111, 45231400, 45232411, 45233120, 45233128

road bridge construction work

Road bridge construction work

Compania Nationala de Autostrazi si Drumuri Nationale SA | Published April 14, 2012  -  Deadline May 9, 2012
cpvs
45221111, 71322500, 71356200

Road bridge construction work

road bridge construction work

Compania Nationala de Autostrazi si Drumuri Nationale SA | Published April 14, 2012  -  Deadline May 9, 2012
cpvs
45221111, 71322500, 71356200

road bridge construction work

Road bridge construction work

Compania Nationala de Autostrazi si Drumuri Nationale SA | Published May 5, 2012  -  Deadline May 22, 2012
cpvs
45221111, 71322500, 71356200

Road bridge construction work

Road bridge construction work

Municipiul Bacau | Published April 27, 2012  -  Deadline May 2, 2012
cpvs
45221111, 45231400, 45232411, 45233120, 45233128

Road bridge construction work

Training simulators

Centrul Român pentru Pregatirea si Perfectionarea Personalului din Transporturi Navale | Published August 31, 2016  -  Deadline October 3, 2016
cpvs

Supply Integrated Bridge System with navigation simulator DP - 1 piece. which consisted of four interactive simulators networked with the bridge controlled by an instructor station. One of the bridges must be provided with the functionality of dynamic positioning in compliance with the requirements Institute of Nautical (Nautical Institute - NI) for simulators DP class B applicable from January 2016 and a classroom ECDIS 8 students under the supervision own instructor.