Public tenders for bridge in Harstad Norway

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Fv. 102 Flesnes bridge

Statens vegvesen Region nord | Published April 5, 2017  -  Deadline May 10, 2017
cpvs
45221111

The work consists of replacing the existing bridge on Fv.102 Flesnes - Holand. Executing measures will mainly consist in tearing existing wooden bridge / steel beams, with subsequent entry of a new bridge in concrete with spans of 27 meters incl. Countries attach. In addition, it is performed rotation veilinjen so that the curvature of Flesnes side becomes flatter and having a length between 40 and 50 meters. On Holand since it improvement or adaptation of existing junctions with a length of up to 70 meters. The reason for this measure is that the existing bridge piers / abutments shows declining carrying capacity. Preparing for interimsbru should also be carried out in the contract.

Tofta cemetery - bridge over river Berg

Hinnstein AS | Published June 9, 2015
Winner
Sortland Entreprenør AS
cpvs
45000000, 71000000

Design and execution of a new bridge over Berg River in connection with the expansion of Tofta cemetery,

Tofta cemetery - bridge over river Berg

Hinnstein AS | Published January 12, 2015  -  Deadline March 20, 2015
cpvs
45000000, 71000000

Design and execution of a new bridge over the river Berg in connection with the expansion of Tofta cemetery,

Fv 142 Parsell GS-veg Gratangsbotn

Statens vegvesen Region nord | Published January 14, 2016  -  Deadline March 15, 2016
cpvs
45000000

Contract Work: Fv 142; allotment: GS-veg Gratangsbotn work consists of the construction of new pedestrian and cycle path along Fv142 Hp 04 ca. profile no. 675 - 1585. At the end of the patch of ca. profile no. 1535 - 1585, will be built pavement. The development therefore applies to a stretch in some rural areas of cross towards Fv 825 and the bridge over the "Great River" in Gratangsbotn. This represents a total distance of about 910 meters. In addition, Fv 142 built new over a ca. distance of 260 meters. (Applies to shift in a curve). The project will also include for example, all of the new road lighting, necessary culverts, relocation of poles and fences, necessary adjustment and establishment of existing roads and junctions and V / A-lines oa.
  • 1