Public tenders for bridge in Luxembourg

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Rehabilitation of Adolphe Bridge - OA 750

Ministère du développement durable et des Infrastructures | Published May 3, 2014
Winner
Association momentanée LUX TP / SoludecBascharage 4902
cpvs
45221119

Rehabilitation of Adolphe Bridge - OA 750

Red Bridge station.

Société nationale des chemins de fer luxembourgeois | Published August 27, 2014  -  Deadline October 17, 2014
cpvs
45232460, 45311000, 45312000, 45313000, 45314000, 45315500, 45316000, 45317200, 45320000, 45331000, 45340000, 45410000, 45421000, 45430000, 45440000, 79713000, 90910000, 45234115, 45234116, 34632200, 34928500, 77231600, 77310000, 71631430

Paths CFL (CFL) plan the construction of the railway station 'Red Bridge' along the line of railway from Luxembourg to Dummeldéng below the 'Grand Duchess Charlotte Bridge. This station will be connected by two cable cars on the Kirchberg plateau, providing fast and convenient access to travelers. At the top, travelers can continue their journey by bus or tram. Bottom, the railway station will be linked by lift to Pfaffenthal. Work to be undertaken covered by this notice: (not an exhaustive list) Sanitary facilities Ventilation, Air Conditioning MT Electrical installations Electrical installations Electrical installations CF Lifts BT Remote Display Generator Exterior siding and ceilings Roofing - sealing - insulation screeds - tiles - Natural Stone Landscaping Ironwork metalwork glass doors Interior layout signage furniture sets Caretaking Cleaning and removing waste with rubbish Cleaning the end of construction equipment railway platforms work Works railways catenary railway signaling works Lighting Site flooring asphalt, asphalt and concrete fences percolated Plantation tree planting and maintenance of green spaces Leak Testing Location of works: Luxembourg City

bridge renewal construction work

Département des travaux publics | Published August 9, 2012
Winner
Association momentanée CDCL / Poncin 2562 Luxembourg LUXEMBOURG
cpvs
45221119

Reconstruction du pont frontalier portant la N10A entre Grevenmacher et Wellen.

1701499 | Dam rehabilitation OA1364 << Bridge misre >>

PMP.LU / A MDDI / APC / DOA - Division des Ouvrages d'Art | Published October 18, 2017  -  Deadline November 30, 2017
cpvs

Rehabilitation of the dam OA1364 << Bridge misre >>

1700902 | Replacement of the bridge over the Alzette rue de Bastogne Luxembourg - Beggen

PMP.LU / C VLUX / DGCC - Direction Gnie Civil - Constructions | Published June 15, 2017  -  Deadline July 28, 2017
cpvs

Replacement of the bridge crossing the Alzette rue de Bastogne Luxembourg - Beggen

1601538 | Construction of a new bridge over the Alzette pitonnier the town park to Rollingen

PMP.LU / C ACMR - Administration communale de Mersch | Published November 25, 2016  -  Deadline December 19, 2016
cpvs
45221100

Scope of work: - Various works of preparation and demolition; - Earth in great mass: ca 1,700 m3 - pious work fors, total length: ca 26 m - concrete work: ca 75 m3 - Construction bridge WIB Type: ca 20 m length / width: ca 3.50 m - Various road works - works Various amnagements extrieurs.

Electricity, heating, solar and nuclear energy

European Energy Efficiency Fund | Published February 10, 2017  -  Deadline March 1, 2017
cpvs
09300000

The Fund set up the EEEF TA Facility to support ambitious public beneficiaries in developing bankable sustainable energy investment programmes. These projects shall relate to the energy efficiency sector, small-scale renewable energy and/or public urban transport. The EEEF TA Facility aims to bridge the gap between sustainable energy plans and real investments through supporting all activities necessary to prepare investments into sustainable energy projects.

Electricity, heating, solar and nuclear energy

European Energy Efficiency Fund | Published December 6, 2016  -  Deadline January 31, 2017
cpvs
09300000

The Fund set up the EEEF TA Facility to support ambitious public beneficiaries in developing bankable sustainable energy investment programmes. These projects shall relate to the energy efficiency sector, small-scale renewable energy and/or public urban transport. The EEEF TA Facility aims to bridge the gap between sustainable energy plans and real investments through supporting all activities necessary to prepare investments into sustainable energy projects.

1700879 | Renovation of a bridge and the adjacent rural road Medernach

PMP.LU / C ACVE - Administration communale de la Valle de l'Ernz | Published June 7, 2017  -  Deadline July 21, 2017
cpvs
45000000

Civil engineering Start of work: October 2017 Duration of works: 110 working days

Making 2 funicular connecting the station "Red Bridge" in Kirchberg.

Société nationale des chemins de fer luxembourgeois | Published July 26, 2014
cpvs
45234240

Réalisation de 2 funiculaires reliant la gare « Pont Rouge » au plateau du Kirchberg

1601271 | Bridge work mtallique execute in the context of building a central school at 39, up from Clausen Luxembourg

PMP.LU / C VLUX / DASB - Direction de lArchitecte Service Btiments | Published September 29, 2016  -  Deadline November 14, 2016
cpvs

BaustelleneinrichtungpauschalMicro Pious ~ 360 ~ 50 mBeton- und Stahlbeton mBodentor, wasserdicht, befahrbar1 StckAbdichtungsarbeiten Rohbau ~ 80 mBrckenbau, Stahlbau ~ 30,000 kgBrckengelnder, Hohlprofile ~ 28 ~ 90 lfmAbdichtungsarbeiten Brckenbau mGussasphaltarbeiten ~ 60 ~ 60 mBeschichtung Gussasphalt mHubvorrichtung Brcke, Hydraulik1 Stck

Construction of a new bridge connecting Pulvermühle and two lanes in the 3rd lane in the existing trench. Trackwork

Société nationale des chemins de fer luxembourgeois | Published December 28, 2013
cpvs
45234116

Construction d'un nouveau viaduc Pulvermühle et raccordement des deux voies à la 3e voie dans la tranchée existante. Travaux de voie

Works for complete or part construction and civil engineering work

Société nationale des chemins de fer luxembourgeois | Published January 15, 2016
cpvs
45200000, 45221000, 45221111

New railway line Luxembourg-Bettembourg. Work on the construction of the road bridge OA 11 and a retaining wall at Berchem.

Electricity, heating, solar and nuclear energy

European Energy Efficiency Fund | Published November 29, 2016  -  Deadline December 23, 2016
cpvs
09300000

The Fund set up the EEEF TA Facility to support ambitious public beneficiaries in developing bankable sustainable energy investment programmes. These projects shall relate to the energy efficiency sector, small-scale renewable energy and/or public urban transport. The EEEF TA Facility aims to bridge the gap between sustainable energy plans and real investments through supporting all activities necessary to prepare investments into sustainable energy projects.

To help the TA beneficiaries even more as well as to insure a higher project implementation rate, EEEF goes one step further and provides TA support by way of consultant services. This means that EEEF selects appropriate experts with the required knowhow and expertise via a tender process (completed entirely by the EEEF) and assigns them to the relevant investment programmes. The TA beneficiaries can use the consultant services to carry out for example feasibility studies, energy audits and evaluate the economic viability of their investments. Legal support for the investment programmes on the other hand, will be mandated by the TA beneficiary directly, while costs to be covered by the EEEF.

Engineering works and construction works

Division des travaux neufs | Published July 14, 2015  -  Deadline September 30, 2015
cpvs
45220000

The book has completely crossed the yard of Bettembourg railways and along the existing bridge to the A1 motorway. The spans are variable with 54.48 m, 51.28 m for the side spans and 80.12 m for the central span.

EIB - Implementation support for the Papua New Guinea rural bridges project

European Investment Bank | Published March 29, 2017
cpvs
71356200

EIB - Implementation support for the Papua New Guinea rural bridges project

EIB - Implementation support for the Papua New Guinea rural bridges project

European Investment Bank | Published August 10, 2016  -  Deadline September 21, 2016
cpvs

EIB - Implementation support for the Papua New Guinea rural bridges project

Redevelopment of the N7 and replacement of OA 202 Mersch

Division de la voirie de Luxembourg | Published November 20, 2013  -  Deadline January 30, 2014
cpvs
45223000, 45233120, 45111100

- Creation of a cable-stayed bridge curve radius of 389 m and a length of 260 m with 4 spans (43.3 m - 2 x 86.7 m - 43.3 m). The construction of the structure over the tracks and the Alzette consists of assembly, assembling, pushing, concreting of the deck consists of two metal box girders connected by spacers, the setting shroud tension and all temporary structures necessary - realization of a bridge over the Alzette with a total length of 70 m, spread over three spans (20 m - 30 m - 20 m). The bridge deck is composed of four pairs of metal girders connected together using spacers - deviation from the main sewage and sinking of a reinforced concrete pipe DN 900 a length of 28 collector m under railways - redevelopment of roads including the geometric adaptation of the existing roundabout and junctions on either side of the new structure, the creation of a new access road to the new green area and parking lot P & R to redesign and implementation of a mixed path for pedestrians and cyclists - renewals and adjustments underground networks - demolition of the existing structure consists of prestressed concrete beams with a total length of 253 m and divided into nine bays isostatic (8 x + / -26 m and 1 x 46 m).

Construction work for railways and cable transport systems

Luxtram SA | Published December 12, 2015  -  Deadline January 19, 2016
cpvs
45234000, 45234160

The work on the overhead contact line (LAC) include in particular the design, supply and installation of overhead contact line for storage and maintenance center CRM and the section A of the first tramway line ( the CRM Red Bridge) or in particular: - +/- 15 000 ml of the contact wire - about 210 studs. Estimated amount of work: € 3.7 million.

Construction of a primary center Internet access - works of metal constructions

Luxconnect SA | Published February 28, 2014
Winner
A.M. Bohlen AG-BCM SÀRLIndustriestrasse 22Speicher D-54662 +49 6562660
cpvs
45000000, 45223210

Structural steel work: 1) Structures S235 and S335 rolled, round and rectangular tubes, thin folded steel profiles: - technical floors machines for roofing - gateway linking buildings - various structures and patterns in small quantities. 2) formwork for composite floor plates and sealing bridge linking support.