Public tenders for bridge in Finland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Vt 1 Kirkkojärvi, the works, KU

Liikennevirasto | Published March 17, 2017
Winner
Kreate Oy
cpvs
45200000

The project is located in the municipality of Espoo and Kauniainen area, the road Highway 1 in connection with, the area of ​​Church Lake. The precise geographic position of Regions is apparent from building design documents. The contract includes Vt 1 for the construction of the detour, the pole plate, noise protection and the construction of the bus, to the extent construction plan documents defined. The contract also includes the construction of a bridge Neighbor hill and the associated light traffic lane and Kasavuori bat and repair Kirkkojärvi bridge. The contract is the total-based turnkey contract. Part of the contracted works is offered bound quantities the unit price. The Finnish Transport Agency will implement the project the City of Espoo and the ELY Centre with, based on the implementation agreements between these parties. Described in section II.1.4 The project is located in Espoo and Kauniainen municipal area, road Highway 1 in connection with, the area of ​​Church Lake. The precise geographic position of Regions is apparent from building design documents. The contract includes Vt 1 for the construction of the detour, the pole plate, noise protection and the construction of the bus, to the extent construction plan documents defined. The contract also includes the construction of a bridge Neighbor hill and the associated light traffic lane and Kasavuori bat and repair Kirkkojärvi bridge. The contract is the total-based turnkey contract. Part of the contracted works is offered bound quantities the unit price. The Finnish Transport Agency will implement the project the City of Espoo and the ELY Centre with, based on the implementation agreements between these parties.

Acting 4 Äänekosken case; STKU

Liikennevirasto | Published March 17, 2017  -  Deadline April 20, 2017
cpvs
45200000

The requirements in the contract documents in accordance with the specified contract includes "Acting 4 Improving the Äänekoski Äänekoski" building design and construction, to the extent in planning documents is defined as all road arrangements, accessories and equipment, to the extent that in the attached invitation to tender documents defined. The contract will involve work in respect of the implementation of the design and construction requirements of the contract documents, filling in such a way that it is also a technical functionality meets the requirements set out in the contract documents. The contract also includes a bridge S3 data model update, the work term-mally possible design changes to be agreed, as well as the data model update in line with outturn. The contract also includes the information, reporting, and warranty term jobs and yhteensovittamisvelvoitteita covered the role of the main implementer in accordance with the tender documents. The contract will involve work to the extent that they have been defined with all road arrangements in the attached invitation to tender documents, accessories and equipment. The contractor will carry out all the works and related purchases, that the completion of the work performance according to the documents required and which are not specifically mentioned in the documents that they do not belong to the contractor's payment obligation. the content of the contract is described in more detail in the contract documents and plans. The contract is essentially the total-based Plan--urakka (ST). The project is implemented as far KU build contract with a binding tilajaa suoriteosuuksia, such as Tärttämäen bridge S3. I, the undersigned contractor undertakes the contract price as defined below to perform the work specified in the contract documents and to act as a general contractor in the construction works, as well as the safety of the contractor responsible for the construction site (the main implementer). The requirements in the contract documents in accordance with the specified

Espoo Housing Ltd / Meadow Bridge Corner 1, the works

Espoon Asunnot Oy | Published March 17, 2017
Winner
Rakennuspetäjä Oy
cpvs
45211000

The contractor subcontracting part of the work of two sub- contracts ara-interest-yard of the apartment building and the construction of the deck below the parking hall in Espoo Niittykumpu plot 15066/1 total contract. Total floor area 5318.5 m2 and the number of dwellings 114 pieces. Two-ara-interest-yard of the apartment building and the construction of the deck below the parking hall in Espoo Niittykumpu plot 15066/1 total contract. Total floor area 5318.5 m2 and the number of dwellings 114 pieces. Contractor commissioning work of the sub- contracts

Architectural, construction, engineering and inspection services

Liikennevirasto | Published February 23, 2017  -  Deadline April 4, 2017
cpvs
71000000

Kimolan channel involved in the project for two bridges, Kimolan bridge and Taipale private road bridge, the preparation of the reconstruction plan.

Planning the task of drawing up the two bridges rakennussuuunnitelmat in the channel in the project. Both bridges crossing Kimolan trough.

These projects located in the existing bridges, which will be demolished in whole or in part, and will be built to replace the underpass height and opening dimensions larger bridges.

Kimolan under the bridge road plan has been drawn up and the design of the bridge was also included in the general planning. Taipale ykistyistiesillasta has been prepared only in a preliminary overview of the drawing.

Size Kimolan channel of the project is estimated to cost about 10 000 000 EUR. The aim is to start the implementation of the project for the 2018 season.

Construction work for steel bridges

Turun Kaupunki | Published February 16, 2017
cpvs
45221115

The City of Turku and the Finnish Transport Agency are jointly interested in the implementation of the service providers consult Logomo bridge. Logomo bridge is a railway yard in Turku border footbridge. Bridge design was held in universal design competition 11/12/2015 - 18/05/2016. More information about the competition and the winning entries can be found at: www.turku.fi/logomonsilta. Bridge construction planning is currently underway.

Markkinavuoropuhelulla explains the interest of service providers and procurement participation consulted on their views about the project and its implementation.

During the event presented the construction project, which includes construction of a new railway yard in Turku border pedestrian bridge Logomo want. The project also includes works on the track area and street construction.

Market Dialogue will be held in Turku on Thursday, 03/02/2017 at 9:00 am, at Turku, Garden Street 1, auditorium.

Market Dialogue interested service providers are asked to register (company name, contact e-mail address and the estimate of the number of persons involved) 02.24.2017 by e-mail Jukka Mäenpää (jukka.maenpaa@turku.fi) and Ossi field screen (ossi.peltokangas@sweco.fi).

In connection it is also possible to send advance questions that you would like to be treated the occasion. During the event, treated the material is supplied in advance to registered electronically in advance (around week 8).

This is not a contract notice and tender. The dialogue and participation in the market is not a prerequisite for participation in the competitive bidding later organized.

The dialogue and participation in the market is not bound by one of the participating entity.

Tikkurila's position in southern underpass and Station Road at the eastern end construction

Vantaan kaupunki | Published February 16, 2017  -  Deadline March 10, 2017
cpvs

Acquisition includes mm. the following types of work: - demolition work in the construction site structures - reinforced concrete slabs, concrete walls and retaining walls construction - Apparatus for lighting, frost protection systems, etc. Construction of electrical engineering structures - Status of the tunnel wall, the base and the construction of alakattopintojen surface structures - The construction, kiveys- and landscaping works - Rail Road bridge railing demolition. and modifications - Natural Stone Stair Chair of construction acquisition includes mm. the following types of work: - demolition work in the construction site structures - reinforced concrete slabs, concrete walls and retaining walls construction - Apparatus for lighting, frost protection systems, etc. Construction of electrical engineering structures - Status of the tunnel wall, the base and the construction of alakattopintojen surface structures - The construction, kiveys- and landscaping works - Rail Road bridge railing demolition. and modifications - Natural Stone Stair Chair of construction - handrails and guard rail construction

Correction Notice 1 Taipale Road drum

Seinäjoen kaupunki | Published February 16, 2017  -  Deadline March 1, 2017
cpvs

Renewal of Taipale Road bridge. The contract includes demolition of the existing bridge and the City of Seinäjoki, acquired by the drum mounting. Destination place oneself in Seinäjoki Ylistaro neighborhood Taipale road. The contract is the total price of the contract. Renewal of Taipale Road bridge. The contract includes demolition of the existing bridge and the City of Seinäjoki, acquired by the drum mounting. Destination place oneself in Seinäjoki Ylistaro neighborhood Taipale road. The contract is the total price of the contract.

Planning Services Framework 2017-2020

Keravan kaupunki | Published February 15, 2017  -  Deadline March 24, 2017
cpvs
71410000

The requirements in the contract documents in accordance with the specified 1st street and the water supply of general engineering - necessary field measurements and geological surveys - general planning - verkostotarkastelut and modeling - hulevesiselvitykset - preparation of cost estimates, 2. street and road construction planning, as well as the associated water supply and spatial planning - necessary field measurements and geological surveys - green design - streets, building design - related public roads design - the general spatial planning - water supply planning - stormwater management planning - pumppaamosuunnittelu - lighting and electrical design - preparation of cost estimates - traffic plans - preparation of contract documents 3. transport planning - institution of transport studies and transport general planning Noise Studies Vibration Studies and surveys Nature - and landscape studies pima-studies, restoration plans and monitoring restoration Archaeological surveys of Culture and the construction of historical studies, as well as building inventories 5. geotechnical design (separate) - geotechnical plans and reviews - construction area 6. construction of bridges and engineering structures for new design - the necessary field measurements and geological surveys - a bridge of general engineering - the bridge structure of the technical design -. concrete structures such as stairs retaining walls design - lighting design - preparation of cost estimates - preparation of contract documents 7. construction of bridges and engineering structures planning of repairs - necessary field measurements and geological surveys - audits (general and special audits) - repair design - lighting design - cost estimates The preparation - piecework drafting of documents 8. land-use planning - station and master planning - block and drawing up regional plans 9. Green design - necessary field measurements and geological surveys - green design - sports and sports venue design - a play park design - lighting design 10. Apparatus for lighting and electrical design (separate) - lighting design - electrical engineering - preparing cost estimates 11. Field measurements and soil surveys (separate) - groundwater studies - soil studies Descriptive value excluding VAT: Range: 300000.00 EUR variants will be accepted (alternative tenders): no variants will be accepted (alternative tenders): no variants will be accepted (alternative tenders) : no variants will be accepted (alternative tenders): no variants will be accepted (alternative tenders): no variants will be accepted (alternative tenders): no variants will be accepted (alternative tenders): no variants will be accepted (alternative tenders): no variants will be accepted (alternative offers): no variants will be accepted (alternative tenders): no variants will be accepted (alternative tenders): no variants will be accepted (alternative tenders): no variants will be accepted (alternative tenders): no variants will be accepted (alternative tenders): no variants will be accepted (alternative tenders): no variants will be accepted (alternative tenders): no requirements in the contract documents in accordance with the specified

Market Dialogue: Logomo bridge

Turun Kaupunki | Published February 15, 2017
cpvs
45221115

Turun kaupunki ja Liikennevirasto kutsuvat yhdessä kiinnostuneet palveluntuottajat kuulemaan Logomon sillan toteuttamisesta. Logomon silta on Turun ratapihan ylittävä jalankulkusilta. Sillan suunnittelusta järjestettiin yleissuunnittelukilpailu 12.11.2015 – 18.5.2016. Lisää tietoa kilpailusta ja voittaneesta ehdotuksesta löytyy osoitteesta: www.turku.fi/logomonsilta. Sillan rakennussuunnittelu on parhaillaan käynnissä. Markkinavuoropuhelulla selvitetään palveluntuottajien kiinnostusta hankintoihin osallistumiseen ja kuullaan heidän näkemyksiään hankkeesta ja sen toteuttamisesta. Tilaisuudessa esitellään rakennushanketta, johon sisältyy uuden Turun ratapihan ylittävän jalankulkusillan rakentaminen Logomon kohdalle. Hanke sisältää myös rata-alueella tehtäviä töitä sekä kadunrakennustöitä. Markkinavuoropuhelu järjestetään Turussa torstaina 2.3.2017 alkaen klo 9:00, osoitteessa Turku, Puutarhakatu 1, auditorio. Markkinavuoropuhelusta kiinnostuneita palveluntuottajia pyydetään ilmoittautumaan (yrityksen nimi, yhteyshenkilön sähköpostiosoite ja arvio osallistuvien henkilöiden määrästä) 24.2.2017 mennessä sähköpostitse Jukka Mäenpäälle (jukka.maenpaa@turku.fi) ja Ossi Peltokankaalle (ossi.peltokangas@sweco.fi). Ilmoittautumisen yhteydessä on myös mahdollista lähettää ennakkokysymyksiä, joita haluaisitte käsiteltävän tilaisuudessa. Tilaisuudessa käsiteltävä materiaali toimitetaan ennakkoon ilmoittautuneille sähköisesti etukäteen (arviolta viikolla 8). Kyseessä ei ole hankintailmoitus eikä tarjouspyyntö. Markkinavuoropuheluun osallistuminen ei ole edellytys myöhemmin järjestettäviin kilpailutuksiin osallistumiseen. Markkinavuoropuheluun osallistuminen ei sido ketään siihen osallistuvaa tahoa. Turun kaupunki ja Liikennevirasto kutsuvat yhdessä kiinnostuneet palveluntuottajat kuulemaan Logomon sillan toteuttamisesta. Logomon silta on Turun ratapihan ylittävä jalankulkusilta. Sillan suunnittelusta järjestettiin yleissuunnittelukilpailu 12.11.2015 – 18.5.2016. Lisää tietoa kilpailusta ja voittaneesta ehdotuksesta löytyy osoitteesta: www.turku.fi/logomonsilta. Sillan rakennussuunnittelu on parhaillaan käynnissä. Markkinavuoropuhelulla selvitetään palveluntuottajien kiinnostusta hankintoihin osallistumiseen ja kuullaan heidän näkemyksiään hankkeesta ja sen toteuttamisesta. Tilaisuudessa esitellään rakennushanketta, johon sisältyy uuden Turun ratapihan ylittävän jalankulkusillan rakentaminen Logomon kohdalle. Hanke sisältää myös rata-alueella tehtäviä töitä sekä kadunrakennustöitä.
  FinlandJoensuu - Joensuun Kaupunki - 
Joensuu City Bridges building project requests a bid for the whole training concerning intercultural communication and immigrant-customer encounter. Offer is binding and be drawn up in the Finnish language.
Feb 15, 2017
Mar 10, 2017

Education kultturienvälisestä communications and immigrant-customer encounter Joensuu City Bridges building project requests a bid for the whole training regarding k 10.03.2017 16:00 Avaa
Karelia University of Applied Sciences Ltd
identifier Invitation to tender Description Deadline

Joensuun Kaupunki | Published February 15, 2017  -  Deadline March 10, 2017
cpvs

Joensuu City Bridges building project requests a bid for the whole training concerning intercultural communication and immigrant-customer encounter. Offer is binding and be drawn up in the Finnish language.

MB-438 Virmutjoki Sulkava Vekaransalmen bridge rakennusuunnittelu

Mt 438 Virmutjoki-Sulkava Vekaransalmen sillan rakennusuunnittelu | Published March 15, 2017
Winner
Insinööritoimisto Suunnittelukide Oy
cpvs
71000000

The building design includes. the following measures and sub-tasks planning evidence of: - 438 new road alignment design, road section length of approximately 2.2 kilometers. - New vekaransalmen continuous steel girder bridge design (Tjpbl). - The establishment of supplementary soil research and measurement program. - To conduct cross-site investigations and related laboratory studies, as well as the supplement measurements. - Job-term planning of transport arrangements. The building design includes. the following measures and sub-tasks planning evidence of: - 438 new road alignment design, road section length of approximately 2.2 kilometers. - New vekaransalmen continuous steel girder bridge design (Tjpbl). - The establishment of supplementary soil research and measurement program. - To conduct cross-site investigations and related laboratory studies, as well as the supplement measurements. - Job-term planning of transport arrangements. The building design includes. the following measures and sub-tasks planning evidence of: - 438 new road alignment design, road section length of approximately 2.2 kilometers. - New vekaransalmen continuous steel girder bridge design (Tjpbl). - The establishment of supplementary soil research and measurement program. - To conduct cross-site investigations and related laboratory studies, as well as the supplement measurements. - Job-term planning of transport arrangements.

Architectural, construction, engineering and inspection services

Liikennevirasto | Published March 9, 2017
cpvs
71000000

New Strawberry River railway bridge (3-span pre-stressed concrete girder bridge) building design.

Architectural, construction, engineering and inspection services

Liikennevirasto | Published March 11, 2017  -  Deadline April 19, 2017
cpvs
71000000

This task belongs to the Riihimäki railway yards future of the western track km 70 + 300 - 71 + 100 and the track 11B km 71 + 330-71 + 650 required by the base, underwear and superstructure design, including the necessary ground investigations, as well as any additional field measurements. Off course R11B planned temporary pier, which runs from 2018 to 2020.

This task also involves the drawing of the River Vantaa in Riihimäki marshalling yard track bridge the widening of the future of the western rail demanded in respect of malt.

Planning the construction of the assignment plan is done modeling work and the resulting pattern is transferred to a legally valid document construction. The model in addition to plans implemented in the traditional form.

Pasila-Riihimäki ramp up stage1, Riihimäki marshalling yard, the westernmost of the track construction design

Liikennevirasto | Published March 10, 2017  -  Deadline April 19, 2017
cpvs
71000000

The requirements in the contract documents in accordance with the specified task includes the Riihimäki railway yards future of the western track km 70 + 300 - 71 + 100 and the track 11B km 71 + 330-71 + 650 required by the base, underwear and superstructure design, including the necessary ground investigations, as well as any additional field measurements. Off course R11B planned temporary pier, which is in use in 2018 - 2020. The task also involves the drawing of the River Vantaa in Riihimäki marshalling yard track bridge the widening of the future of the western rail demanded in respect of malt. Planning the construction of the assignment plan is done modeling work and the resulting pattern is transferred to a legally valid document construction. The model in addition to plans implemented in the traditional form. This task belongs to the Riihimäki railway yards future of the western track km 70 + 300 - 71 + 100 and the track 11B km 71 + 330-71 + 650 required by the base, underwear and superstructure design, including the necessary ground investigations, as well as any additional field measurements. Off course R11B planned temporary pier, which is in use in 2018 - 2020. The task also involves the drawing of the River Vantaa in Riihimäki marshalling yard track bridge the widening of the future of the western rail demanded in respect of malt. Planning the construction of the assignment plan is done modeling work and the resulting pattern is transferred to a legally valid document construction. The model in addition to plans implemented in the traditional form. The requirements in the contract documents in accordance with the specified

P8 Turku-Pori, Mynämäen junction arrangements

Liikennevirasto | Published March 8, 2017  -  Deadline April 11, 2017
cpvs
45200000

The requirements in the contract documents in accordance with the specified three-P8 interface separation construction Mynämäen conurbation want. In addition, road and private road arrangements are made. , As well as noise and groundwater protection. Extension of the underpass tunnel and drum bridge make P8 interface enhancements Requirements Mynämäen of documents relating to the acquisition in accordance with the specified

SUSPENSION NOTICE: Strawberry River railway bridge construction design

Liikennevirasto | Published March 8, 2017
cpvs
71000000

New Strawberry River railway bridge (3-span pre-stressed concrete girder bridge) building design. New Strawberry River railway bridge (3-span pre-stressed concrete girder bridge) building design. New Strawberry River railway bridge (3-span pre-stressed concrete girder bridge) building design.

Sports Road bridge fundamental improvements in the design

Kauhajoen kaupunki | Published March 8, 2017  -  Deadline April 5, 2017
cpvs
71322100, 71322500

Kauhajoki city engineering department invites tenders Sports Road bridge broad based improvement planning. Detailed information about the tender documents. Kauhajoki city engineering department invites tenders Sports Road bridge broad based improvement planning. Detailed information about the tender documents.

Railway construction works

Liikennevirasto | Published February 24, 2017  -  Deadline April 11, 2017
cpvs
45234100, 45221119, 45234114, 45234116

Markkula underpass bridge and embankment repair section of track Jämsänkoski to Jyväskylä.

The acquisition includes the line section Jämsänkoski-Jyväskylä Markkula underpass and embankment repair, Mäntylän underpass repair work, the track and the beginning of the renewal of superstructures and electrification and safety devices on work. Contract also includes tasks of the main contractor and the project supervisor.

Urban planning services

Uudenkaupungin kaupunki | Published February 24, 2017  -  Deadline March 14, 2017
cpvs
71410000, 71332000, 71313000, 71313440, 90711400, 71313450, 90711500, 71322500, 71356400, 39370000, 65100000, 90712500, 90733000, 90732000, 45112700, 45112710, 71400000, 45221118, 44212110, 90721800, 71355000, 71355200, 45120000, 45121000, 71351100

the subject of the contract is in Uusikaupunki itemized municipal engineering services 2 years (2 + 1 + 1) for the lease period.

Contract covered by the framework agreements and individual assignments will be purchased from selected suppliers that agreement in accordance with the terms of the framework agreement.

Assignments will consist of for various tasks related to community development; new construction and research and studies, based on the preparation in accordance with the mandate of the renovation plans.

Framework agreement consists of the following nine elements:

Geotechnics (GEO) and geotechnical site investigations (geot);

Land-use planning and environmental impact assessment (EIA);

Transportation Engineering (Faculty of Medicine);

Road, street and area technology (TKA);

Water Supply and Research (VHT);

Environmental planning (CAP) and the contaminated land and water areas (PIMA);

Landscape Design (MAS) and green design;

Bridge Technique (SIT) and other skill building construction;

Construction structures and materials; auxiliary products to construction (except electric apparatus)

Kuopion kaupunki kuntatekniikkaliikelaitos | Published February 24, 2017  -  Deadline March 28, 2017
cpvs
44000000

Masters ask for an offer Hiltulanlahdenkadun Kuopio pedestrian underpasses (S1 and S2) for the manufacture and delivery to the site of precast concrete and steel arch.

Bridges delivery contract includes the required placement of the bridge work plans and assembly instructions. Installation and construction are not included in the delivery contract.

The acquisition are not divided up, since it would not achieve the cost savings or from facilitating bid threshold.