Public tenders for bridge in Kerava Finland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Bridge Repair Workshop Repair of Asemansilla Road Bridge and Asemansilla Street

Keravan kaupunki | Published November 20, 2017  -  Deadline December 13, 2017
cpvs
45221110

The contract notice has been published in the Hilma repository and the Cloud Advertising Service on the City of Kerava. The builder chooses the contractor's lowest total price. The customer reserves the right to reduce the scope of the contract or to exclude all bids. The contract notice has been published in the Hilma repository and the Cloud Advertising Service on the City of Kerava. The builder chooses the contractor's lowest total price. The customer reserves the right to reduce the scope of the contract or to exclude all bids.

Design Services Framework Agreement 2017-2020

Keravan kaupunki | Published September 27, 2017
Winner
Vr track oy,Fcg suunnittelu ja tekniikka oy,Trafix oy,Pöyry Finland oy,Sito Oy,Geopalvelu Oy,A-insinöörit suunnittelu oy,Destia Oy,Sweco Ympäristö Oy,Fcg Suunnittelu- ja tekniikka Oy,Pöyry Finland Oy,Sweco ympäristö Oy,Sweco ympäristö oy,Wsp finland oy,Ramboll finland oy,Sipti oy,Destia oy,Golder associates oy,L Arkkitehdit oy,VSU maisema-arkkitehdit oy,WSP Finland Oy,Wsp Finland Oy,SiltaExpert Oy,A-Insinöörit suunnittelu oy,Ramboll Finland Oy,VR Track Oy,Geotek Oy
cpvs
71410000

Melter surveys Archaeological surveys 7. Repair of bridge and hinged structures - Required terrain measurements and soil surveys - Inspections (general and special inspections) - Repair planning - Lighting planning - Cost estimates - Drafting of contract documents 1. General planning of street and water supply - Land surveys and soil surveys required - General planning - (separate) - Groundwater examinations - Soil surveys 8. Land use planning - Station and general planning - Preparation of block and suburban plans 3. Traffic planning - Traffic studies and surveys - Surveying of water and water resources - Cost estimates design and traffic planning - planning of traffic control and guidance, including traffic lights This task area includes assignments not included in tasks 2 and 6-7. pima surveys, rehabilitation plans and rehabilitation control 6. New design of bridge and back structures - necessary terrain measurements and soil surveys - bridge planning - structural engineering of the bridge - concrete structures eg stairs support walls design - lighting design - cost estimation - drafting of contract documents 10. Lighting and electrical engineering (separate) - lighting design - electrical planning - cost estimation 2. Road and road construction planning and related water and space planning - land surveying and soil surveys required - green space planning - street design planning - general design - planning of general areas - water supply planning - - pumping planning - lighting and electrical engineering - cost estimation - traffic control plans - drafting of contract documents Nature and landscaping (geotechnical plans and reviews) - structural design studies 9. Green planning - necessary terrain measurements and soil surveys - design of green spaces - sport and physical planning planning - planning of playgrounds - lighting design Further details This contract is divided into sections: Yes

Urban planning services

Keravan kaupunki | Published September 28, 2017
Winner
Mitta Oy
cpvs
71410000, 71313100, 71351914, 71322300, 71240000, 71351500, 71400000

This framework agreement is also available to Kerava City Group companies.

Provider may offer one or more partial assignments.

Noise surveys.

Archaeological studies.

Repair planning of bridge and hinged structures

- necessary field measurements and soil surveys

- inspections (general and special inspections)

- repair design

- lighting design

- drawing up cost estimates

- preparation of contract documents.

General planning of the street and water supply

- necessary field measurements and soil surveys

- general planning

- network reviews and modeling

- flood water investigations

- drawing up cost estimates.

Vibration examinations and surveys.

Cultural and building history studies and building inventions.

Terrain Measurements and Soil Surveys (Separate)

- groundwater examinations

- soil surveys

- field measurements and modeling

Mostly the tasks relate to the subscriber's initial data acquisition as a basis for planning or to supplement the measurements and studies made in connection with the design.

Land use planning

- station and general planning

- preparation of block and regional plans

- drawing up cost estimates

Includes zoning and related documentation, as well as making technical studies on land use.

traffic planning

- preparation of traffic reports and general traffic planning

- planning of traffic control and guidance, including traffic lights

This task area includes assignments not included in tasks 2 and 6-7.

Pima surveys, rehabilitation plans and rehabilitation monitoring.

New design of bridge and folding structures

- necessary field measurements and soil surveys

- bridge master planning

- structural engineering of the bridge

- concrete structures, eg stairs, support walls design

- lighting design

- drawing up cost estimates

- preparation of contract documents.

Lighting and Electrical Design (Separate)

- lighting design

- electrical design

- drawing up cost estimates

- preparation of contract documents

Mostly the tasks relate to the subscriber's initial data acquisition as a basis for planning or to supplement the measurements and studies made in connection with the design.

Road and road construction design and associated water management and spatial planning

- necessary field measurements and soil surveys

- green space planning

- street design

- general design related to you

- designing general areas

- water supply planning

- planning of river basin management

- pumping design

- lighting and electrical design

- drawing up cost estimates

- traffic control plans

- preparation of contract documents.

Nature and landscape surveys.

Geotechnical Design (Separate)

- geotechnical plans and reviews

- structural analysis reports

- drawing up cost estimates

Such a particular cause may be, for example, challenging soil conditions.

conservatory design

- necessary field measurements and soil surveys

- green space planning

- sport and exercise site design

- design of playgrounds

- lighting design

- drawing up cost estimates

Includes both general and implementation plans.

Planning Services Framework 2017-2020

Keravan kaupunki | Published February 15, 2017  -  Deadline March 24, 2017
cpvs
71410000

The requirements in the contract documents in accordance with the specified 1st street and the water supply of general engineering - necessary field measurements and geological surveys - general planning - verkostotarkastelut and modeling - hulevesiselvitykset - preparation of cost estimates, 2. street and road construction planning, as well as the associated water supply and spatial planning - necessary field measurements and geological surveys - green design - streets, building design - related public roads design - the general spatial planning - water supply planning - stormwater management planning - pumppaamosuunnittelu - lighting and electrical design - preparation of cost estimates - traffic plans - preparation of contract documents 3. transport planning - institution of transport studies and transport general planning Noise Studies Vibration Studies and surveys Nature - and landscape studies pima-studies, restoration plans and monitoring restoration Archaeological surveys of Culture and the construction of historical studies, as well as building inventories 5. geotechnical design (separate) - geotechnical plans and reviews - construction area 6. construction of bridges and engineering structures for new design - the necessary field measurements and geological surveys - a bridge of general engineering - the bridge structure of the technical design -. concrete structures such as stairs retaining walls design - lighting design - preparation of cost estimates - preparation of contract documents 7. construction of bridges and engineering structures planning of repairs - necessary field measurements and geological surveys - audits (general and special audits) - repair design - lighting design - cost estimates The preparation - piecework drafting of documents 8. land-use planning - station and master planning - block and drawing up regional plans 9. Green design - necessary field measurements and geological surveys - green design - sports and sports venue design - a play park design - lighting design 10. Apparatus for lighting and electrical design (separate) - lighting design - electrical engineering - preparing cost estimates 11. Field measurements and soil surveys (separate) - groundwater studies - soil studies Descriptive value excluding VAT: Range: 300000.00 EUR variants will be accepted (alternative tenders): no variants will be accepted (alternative tenders): no variants will be accepted (alternative tenders) : no variants will be accepted (alternative tenders): no variants will be accepted (alternative tenders): no variants will be accepted (alternative tenders): no variants will be accepted (alternative tenders): no variants will be accepted (alternative tenders): no variants will be accepted (alternative offers): no variants will be accepted (alternative tenders): no variants will be accepted (alternative tenders): no variants will be accepted (alternative tenders): no variants will be accepted (alternative tenders): no variants will be accepted (alternative tenders): no variants will be accepted (alternative tenders): no variants will be accepted (alternative tenders): no requirements in the contract documents in accordance with the specified

Urban planning services

Keravan kaupunki | Published February 16, 2017  -  Deadline March 24, 2017
cpvs
71410000, 71240000, 71313100, 71400000, 71351914, 71322300, 71351500

This Framework Agreement is also available on the City of Kerava Group companies.

Provider may offer one (1) or more subtasks.

Street, water supply and general planning:

- The necessary field measurements and soil surveys,

- General planning,

- Verkostotarkastelut and modeling,

- Hulevesiselvitykset,

- Preparation of cost estimates.

Street and road construction planning, as well as the associated water supply and spatial planning:

- The necessary field measurements and soil surveys,

- The design of green areas,

- Streets, building design,

- Planning relating to public roads,

- The design of public areas,

- Design of water supply,

- Design of stormwater management,

- Pumppaamosuunnittelu,

- Lighting and electrical design,

- Preparation of cost estimates,

- Traffic control plans,

- Preparation of contract documents.

Traffic planning:

- Institution of transport studies and transport of general engineering,

- Design of traffic control and guidance, including traffic lights.

This task area includes orders that are not included in positions 2 and 6-7.

Noise Studies.

Vibration studies and surveys.

Nature and landscape studies.

Pima surveys, restoration and rehabilitation plans for the control.

Archaeological surveys.

Cultural and historical building surveys, as well as building inventories.

Geotechnical design (separate):

- Geotechnical plans and reviews;

- The construction area,

- Preparation of cost estimates.

Such special reasons may be, for example. The challenging soil conditions.

Construction of bridges and engineering structures in new design:

- The necessary field measurements and soil surveys,

- Overall design of the bridge,

- The technical design of the bridge structure,

- For example, concrete structures, stairs retaining walls design.

- Lighting design,

- Preparation of cost estimates,

- Preparation of contract documents.

Construction of bridges and engineering structures planning of repairs:

- The necessary field measurements and soil surveys,

- Inspections (general and special audits),

- Repair design,

- Lighting design,

- Preparation of cost estimates,

- Preparation of contract documents.

Land-use planning:

- Station and master planning,

- Block and drawing up regional plans,

- Preparation of cost estimates.

Includes land use planning and related documents, but also for techno-economic studies related to the use of the conclusion.

Conservatory design:

- The necessary field measurements and soil surveys,

- The design of green areas,

- Sports and sports facilities design,

- Design of playgrounds,

- Lighting design,

- Preparation of cost estimates,

Includes both general and implementation plans.

Lighting and electrical design (separate):

- Lighting design,

- Electrical engineering,

- Preparation of cost estimates,

- Preparation of contract documents.

Mainly in tasks related to the acquisition of the customer to input information as a basis for planning or supplement the measurements and studies of design.

Field measurements and soil surveys (separate):

- Groundwater studies,

- Soil studies,

- Field measurements and modeling.

Mainly in tasks related to the acquisition of the customer to input information as a basis for planning or supplement the measurements and studies of design.

  • 1