Public tenders for bridge in 20100-turku Finland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Friitala bridge

Varsinais-Suomen elinkeino-, liikenne- ja ympäristökeskus | Published April 27, 2017  -  Deadline June 8, 2017
cpvs
45221110

Requirements for documents relating to the acquisition in accordance with the specified Friitala bridge is located on the highway Ulvilan in 2442 (Siltatie), which exceeds the Kokemäenjoki. Friitala Bridge is a vehicular bridge, on both edges of the pavements. The contract is the total-based turnkey contract, with the exception of a thief evening workarounds and temporary rotation interface 2440 mt / vt-11 intersection area, which is a form of contract to design and implement a ST. The new bridge is of the continuous steel girder (concrete-, a composite), with a total length of about 136 m and HL = 15m. The contract is the main work phases include .: - job-term traffic - construction work early roundabout ST - the detour and the thief tonight's construction of ST - the existing bridge demolition - the new bridge structural steel fabrication - the bridge of agriculture and the construction of intermediate supports - piles of tiles and tulopenkereiden construction - road construction - installation of a new bridge steel structure - reinforced concrete cover slab construction - the bridge surface structures, equipment and appliances, as well as steel structures surface treatment - the detour and the thief tonight's demolition - bridge place finish contract includes job-term traffic arrangements, the existing bridge demolition and construction of a new Friitala bridge to the extent that it is building in planning documents is defined as all road arrangements, accessories and equipment. Requirements for documents relating to the acquisition in accordance with the specified

Friitala bridge

Varsinais-Suomen elinkeino-, liikenne- ja ympäristökeskus | Published July 5, 2017
cpvs
45221110

The contract includes a job-term traffic, the demolition of the existing bridge and construction of a new bridge Friitala to the extent that it is building in planning documents is defined as all road arrangements, accessories and equipment. Friitala bridge is located on the highway Ulvilan in 2442 (Siltatie), which exceeds the Kokemäenjoki. Friitala Bridge is a vehicular bridge, on both edges of the pavements. The contract is the total-based turnkey contract, with the exception of a thief evening workarounds and temporary rotation interface 2440 mt / vt-11 intersection area, which is a form of contract to design and implement a ST. The new bridge is of the continuous steel girder (concrete-, a composite), with a total length of about 136 m and HL = 15m. The contract includes a job-term traffic, the demolition of the existing bridge and construction of a new bridge Friitala to the extent that it is building in planning documents is defined as all road arrangements, accessories and equipment.

Pahaniemi bridge repair works

Turun Kaupunki | Published February 24, 2017  -  Deadline March 20, 2017
cpvs

The City of Turku / Real estate Enterprise / IT Infrastructure Services to request the total contract offer Pahaniemi bridge repair work. Pahaniemi bridge (T-4019) is located in Turku, Pansion road (E63, transit traffic street). The bridge has a total of four lanes. The bridge crosses the railway line going to the railway port of Turku (TKU track number 402), the port going to import the street, as well as pedestrian and bicycle path. The bridge has been completed to traffic in 1979. The bridge is a reinforced concrete continuous ontelolaattasilta (Bjol), 8-port City of Turku / Real estate Enterprise / IT Infrastructure Services to request the total contract offer Pahaniemi bridge repair work. Pahaniemi bridge (T-4019) is located in Turku, Pansion road (E63, transit traffic street). The bridge has a total of four lanes. The bridge crosses the railway line going to the railway port of Turku (TKU track number 402), the port going to import the street, as well as pedestrian and bicycle path. The bridge has been completed to traffic in 1979. The bridge is a reinforced concrete continuous ontelolaattasilta (Bjol), 8-neck

VARELY Bridge contract 1/2018

Varsinais-Suomen elinkeino-, liikenne- ja ympäristökeskus | Published November 20, 2017  -  Deadline January 10, 2018
cpvs
45221110

The contract includes the construction of the Loukola bridge in Pöytyy and the bridge of the Haitula bridge in Loimaa, to the extent that they are defined in the building design documents with all their timetables, equipment and equipment. The Loukola bridge is a type of tensile concrete skylight bridge. The total length of the bridge is 23 m and HL = 7,5 m. The bridge is set up on the drill bits on the existing rocky bridge. The hamlet bridge is a type of tensed concrete sloping bridge bridge. The overall length of the bridge is about 46m and HL = 8.5m. The old Haitula bridge is demolished. The contract includes the construction of the Loukola bridge in Pöytyy and the bridge of the Haitula bridge in Loimaa, to the extent that they are defined in the building design documents with all their timetables, equipment and equipment. The Loukola bridge is a type of tensile concrete skylight bridge. The total length of the bridge is 23 m and HL = 7,5 m. The bridge is set up on the drill bits on the existing rocky bridge. The hamlet bridge is a type of tensed concrete sloping bridge bridge. The overall length of the bridge is about 46m and HL = 8.5m. The old Haitula bridge is demolished.

Bridge construction work

Varsinais-Suomen elinkeino-, liikenne- ja ympäristökeskus | Published April 28, 2017  -  Deadline June 8, 2017
cpvs
45221110

The contract includes a job-term traffic, the demolition of the existing bridge and construction of a new bridge Friitala to the extent that it is building in planning documents is defined as all road arrangements, accessories and equipment.

Friitala bridge is located on the highway Ulvilan in 2442 (Siltatie), which exceeds the Kokemäenjoki. Friitala Bridge is a vehicular bridge, on both edges of the pavements.

The contract is the total-based turnkey contract, with the exception of a thief evening workarounds and temporary rotation interface 2440 mt / vt-11 intersection area, which is a form of contract to design and implement a ST.

The new bridge is of the continuous steel girder (concrete-, a composite), with a total length of about 136 m and HL = 15 m.

The contract is the main work phases include .:

- job-term traffic,

- construction work early roundabout ST,

- the detour and the thief tonight's construction ST,

- demolition of the existing bridge,

- the new bridge structural steel fabrication,

- Agriculture and bridge construction beams,

- piles of tiles and tulopenkereiden construction,

- road construction work,

- installation of a new bridge steel structure,

- construction of a reinforced concrete deck slab,

- the bridge surface structures, equipment and devices, and surface treatment of steel structures,

- the detour and the thief tonight's demolition,

- Bridge place finish.

Building the Logom Bridge

Turun Kaupunki | Published August 17, 2017
cpvs
45221115

Workshop Works The contract includes the construction of a pedestrian bridge over the Turku railway yard from Logom, to the edge of Ratapihankatu at Ajurinkatu. The main bridge and supporting tower are made of steel. The total length of the bridge is 137.6 m, consisting of four spans (29.64 + 28.19 + 49.83 + 15.47) and two spurs (7.66 and 6.87). The object of the acquisition is the construction of a pedestrian bridge crossing the Turku railway yard. The acquisition also includes works in the railway sector and street construction work. engineering works

VARELY bridge contract 2-2015

Varsinais-Suomen elinkeino-, liikenne- ja ympäristökeskus | Published March 4, 2015  -  Deadline March 31, 2015
cpvs
45221110

The contract includes the following bridge and bridge repair work to the extent that they are building plan documents have been defined with all the road arrangements, accessories and equipment, - the highway 231 in Loimaa Ilolan bridge repair. - On the highway 213 in Loimaa Goose River old bridge demolition, during working detour construction and dismantling as well as the new Goose River bridge construction. - On the road in 2052 in Rauma in the wrong ditch the old bridge demolition, during working detour construction and dismantling, as well as a new wrong Trench construction of a bridge.

Construction of Brush River bridge

Varsinais-Suomen elinkeino-, liikenne- ja ympäristökeskus | Published November 5, 2015  -  Deadline December 15, 2015
cpvs
45221110

The contract includes the construction of Pomarkku Brush River bridge, located on the highway in 2600, to the extent construction plan documents have been defined with all road arrangements, accessories and equipment. The bridge type reinforced concrete continuous beam bridge with a total length of 97 m and a useful width of 7.5 m.

Strömman fixed bridge

Varsinais-Suomen elinkeino-, liikenne- ja ympäristökeskus | Published February 3, 2015  -  Deadline March 3, 2015
cpvs
45221110

The contract includes the highway 183 Kemiö island located in the new Strömman fixed bridge construction and demolition of the old bridge, as well as the work-time thief evening unloading, to the extent the building plan documents have been defined with all the road arrangements, accessories and equipment.

VARELY bridge contract 3-2016

Varsinais-Suomen elinkeino-, liikenne- ja ympäristökeskus | Published February 12, 2016  -  Deadline March 8, 2016
cpvs
45221110

The contract includes:

- Taivassalo 12241 highway in the demolition of the old bridge Kuuste Rauma, construction work early detour to the contractor in accordance with his own plan as well as piles of tiles and the construction of a new bridge to the extent that they are building plan documents have been defined with all road arrangements, accessories and equipment.

The construction of the bridge Kuuste Rauma is of reinforced concrete ulokelaattasilta, which spans are 2 m + 10 m + 2 m and the effective width of 7.0 m:

- 12389 Masku road in Elk River dismantling of the old bridge, the construction of a new proposed route and the construction of a new bridge, to the extent that they are building plan documents have been defined with all road arrangements, accessories and equipment.

The construction of the Moose River Bridge is of reinforced concrete ulokelaattasilta, which spans are 2,5 m + 18 m + 2.5 m and useful width of 6.5 m.

VARELY bridge repair works 1-2017

Varsinais-Suomen elinkeino-, liikenne- ja ympäristökeskus | Published November 2, 2016  -  Deadline December 2, 2016
cpvs
45221119

The contract will involve repairing the bridges, to the extent construction planning documents is defined in all road arrangements, equipment and fittings: - Chipping Loimaa River bridge on Highway 9. The bridge is continuous reinforced concrete slab bridge with a total length of 37 meters and HL = 10 meters. - Railway yard in Loimaa overpass on the highway 213. The bridge is continuous reinforced concrete box girder bridge with a total length of 232 meters and HL = 14.5 meters.

Construction of the bridge Logomo

Turun Kaupunki | Published May 2, 2017  -  Deadline May 23, 2017
cpvs
45221115

the subject of the contract is to build a border railway yard in Turku pedestrian bridge. Contract also includes work in the railway area and street construction tasks. the subject of the contract is to build a border railway yard in Turku pedestrian bridge. Contract also includes work in the railway area and street construction tasks.

VARELY bridge contract 2-2016

Varsinais-Suomen elinkeino-, liikenne- ja ympäristökeskus | Published February 12, 2016  -  Deadline March 15, 2016
cpvs
45221110

The contract will involve the replacement of the following bridges:

-Koskenojan Bridge, located in the Old Kaarina number one On the road (110 mt).

-Rappulan Bridge, located in the Old Salo number one On the road (110 mt).

Branches respectively bridge, is located in Salo Ylikulman on the highway (mt 12110).

-Sunnanån Bridge, located on the island of Kemiö Skinnarvik on the highway (mt 12055).

Bridges will be renewed in so far as they are tender and construction planning documents is defined in all road arrangements, accessories and equipment.

VARELY the construction of the bridge crossing Kurkela

Varsinais-Suomen elinkeino-, liikenne- ja ympäristökeskus | Published February 9, 2017  -  Deadline March 7, 2017
cpvs

Kurkela crossing the bridge is located in Lieto highway 9 border highway 204. The new constructed bridge is of prestressed concrete continuous ulokepalkkisilta, with a total length of about 60 m, and HL = 13.25 m. The contract will involve work-term traffic, the demolition of the existing bridge and construction of a new Kurkela crossing the bridge, to the extent it is building in planning documents is defined in all road arrangements, accessories and equipment. More detailed information is provided in the tender documentation. Kurkela crossing the bridge is located in Lieto highway 9 border highway 204. The new constructed bridge is of prestressed concrete continuous ulokepalkkisilta, with a total length of about 60 m, and HL = 13.25 m. The contract will involve work-term traffic, the demolition of the existing bridge and construction of a new Kurkela crossing the bridge, to the extent it is building in planning documents is defined in all road arrangements, accessories and equipment. More detailed information is provided in the tender documentation.

Construction of the bridge Logomo

Turun Kaupunki | Published April 7, 2017  -  Deadline May 16, 2017
cpvs
45221115

Requirements for documents relating to the acquisition in accordance with the specified contract includes the construction of the footbridge over the railway yard in Turku Logomo edustalta Ratapihankatu up to the edge of the street the driver. The bridge main girder and the support towers are made of steel. The bridge has a total length of 137.6 m, which is composed of four span (29.64 + 28.19 + 49.83 + 15.47) and two projections (7.66 and 6.87). the subject of the contract is to build a border railway yard in Turku pedestrian bridge. Contract also includes work in the railway area and street construction tasks. Requirements for documents relating to the acquisition in accordance with the specified

VARELY bridge repair works 2-2017

Varsinais-Suomen elinkeino-, liikenne- ja ympäristökeskus | Published March 2, 2017  -  Deadline March 28, 2017
cpvs

The contract will involve repairing Harituntien in Turku, crossing bridges, Fox River bridge in Laitila and Valpperin in Nousiainen bridge renewal to the extent they repairs planning documents is defined as all road arrangements, accessories and equipment. More detailed information is provided in the invitation to tender. The contract will involve repairing Harituntien in Turku, crossing bridges, Fox River bridge in Laitila and Valpperin in Nousiainen bridge renewal to the extent they repairs planning documents is defined as all road arrangements, accessories and equipment. More detailed information is provided in the invitation to tender.

Logomo bridge design competition

Turun Kaupunki | Published November 2, 2015  -  Deadline November 25, 2015
cpvs
71240000

The City of Turku organize a contest of Turku main railway station and railway yard area and Ratapihankatu over the footbridge leading to general planning. The bridge is placed in accordance with the development plan of the street between the driver and the Logomo (culture, art and the creative economy center). The competition is held an invited competition entries will contest selected. The competition is called 4 to 6 qualifying team. The regatta will be drawn up in the competition program of the Finnish Association of Civil Engineers Association's competition rules to date. 14.12.2012 that competitor to prove their acceptance participating in the contest. The bridge is hoped consisting of Turku yard area as a positive recognizable hallmark of high-quality essence works to the pathfinder for future development of the region. The aim is to design an architecturally controlled in terms of traffic as well as functional and safe new rail yard area of ​​border pedestrian access. The bridge will be aesthetically elegant and balanced, landscape and townscape well-matched ensemble.

VARELY bridge repair works 1-2016

Varsinais-Suomen elinkeino-, liikenne- ja ympäristökeskus | Published January 20, 2016  -  Deadline February 23, 2016
cpvs
45221119

The contract includes:

- Vuolle bridges in the highway Kokemäki 2470 renovation of the I and II, to the extent that they are building plan documents have been defined with all road arrangements, accessories and equipment.

I Vuolle bridge is of reinforced concrete continuous slab bridge that spans are 15 m + 15 m and a useful width of 12.15 m.

Vuolle Bridge II is of reinforced concrete continuous box girder bridge that spans are 38 m + 38 m and a useful width of 12.15 m:

- Kiettare bridges on the highway 12803 Kokemäki renovation to the extent that they are building plan documents have been defined with all road arrangements, accessories and equipment.

Kiettare bridge is a type teräsbetonikantinen steel suspension bridge with a total length of 86 m and a useful width of 3.62 m.

Harjunpää the construction of the river bridge

Varsinais-Suomen elinkeino-, liikenne- ja ympäristökeskus | Published September 25, 2015  -  Deadline October 20, 2015
cpvs
45221110

The contract includes the extent construction plan documents have been defined with all road arrangements, accessories and equipment, including: - the highway 11 new Harjunpää in Ulvila River bridge construction - the demolition of the old bridge - work temporary detour and storage of tonight's construction and dismantling.

VARELY pipe bridge contract 2015-2016

Varsinais-Suomen elinkeino-, liikenne- ja ympäristökeskus | Published February 18, 2015  -  Deadline March 19, 2015
cpvs
45221110

The contract consists of Southwest Finland and Satakunta areas in the nine new bridge of steel pipe as a bridge to the extent that they have a plan documents specified in all road arrangements, accessories and equipment. The contract covered Seven of the sites implemented a package contract subscriber plans, and two items ST-management contract with the design of bridges with contract.